4258_A3.docx

DOCX document 30 KB Posted

Attached to
USNS WILLIAM MCLEAN ROH/DD Federal contract opportunity
Solicitation number
N32205-18-R-4258
Issued by
Department of the Navy Military Sealift Command

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to USNS WILLIAM MCLEAN ROH/DD, newest first.
File Type Posted
AMENDMENT_0005-20181222124641.pdf PDF
Ref_2(1).zip ZIP file
Ref_1(1).zip ZIP file
Ref_2(4).zip ZIP file
Ref_1(5).zip ZIP file
Ref_1(3).zip ZIP file
Ref_1(4).zip ZIP file
Ref_1(2).zip ZIP file
Ref_2(2).zip ZIP file
Ref_2(3).zip ZIP file
J_-_2_Category_A_Items_MCLEAN.xls XLS spreadsheet
0802_A_AUXILIARY_PRESTAGE_AREA_REFRIGERATION_INSTALLATION_(T-ALT_485)_Rev_10-3-18.doc DOC document
243-8498653_-_REV_1_26_JUNE_2018.pdf PDF
N3220518R4258_AMENDMENT_0002.docx DOCX document
331-8495060_RelayLanternsExamRmTALT299_ABS_(2).pdf PDF
532-8499083_-LT_FW_Cooling_Sys_WMC.pdf PDF
N3220518R4258_FINAL_SOLICITATION.docx DOCX document
J-6_CDRLs.zip ZIP file
J_Attachments.zip ZIP file
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4258

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

Category A

001Intent, Scope, General Requirements and Definitions
002Technical and Manufacturer Representatives
003Approach, Berth, and Mooring Requiremnts
004Testing and Quality Assurance
005Electrical Safety Procedure Requirements
006Heavy Weather Plan
007Cold Weather Plan
010Furnish Office for Overhaul Management Team (OMT)
011Furnish General Services
012Telephone Services
013Project Planning and Production Status Monitoring Reports
014Preparation of Weight and Moment Report
015Integrated Logistics and GFM Support Requirements
016Fire Protection and Ship's Safety Program
017Handling Ship's Stores
018Delivery and Re-Delivery of the Vessel
019Shipboard Access and Security
020Gas Free Certificates
021Clean and Gas Free Tanks, Voids, Cofferdams & Space
022Machinery Space Turn-Over, Dock Trials and Sea Trial
023Hazardous Waste Disposal at a Contractor's Facility
024Phyiscal Security at Private Contractor's Facility
102Open, Clean, and Inspect Goosenecks (CSI)
211MDE No. 2 and No. 3 12K HR Maintenance
304Elec. Motor Maintenance (VR18-0019)
342Additional Bilge Alarms Installation
369Install Relay Lanterns in Examination Room
375Install Additional Alarm Columns
402Antenna System Preventive Maintenance
403Communication Systems Preventive Maintenance
404OE-570 WSC Antenna System Maintenance
405NAVMACSII Shipyard Industrial Assist
406Sound Powered Phone X1JG Mod
503Cargo Crane Maintenance and Re-Certification
531HT FW Sea Water Piping Modification
532HT/LT Freshwater and Chill Water System Flush
606Flight Deck Non-Skid Renewal
624MSD/VCHT Tank Coating and Repair
801Galley and Laundry Exhaust Duct Cleaning (CSI)
802Auxiliary Prestage Area Refrigeration Installation
901Dry-Docking and Undocking Vessel
903Propeller Shaft and Stern Tube Inspection
904AStern Tube Seal Inspection (SW System) (CSI)
905ABow Thruster Maintenance (CSI)
911Inspect and Repair Cathodic Protection (CSI)
912Shaft Grounding Maintenance (CSI)
916Underwater Hull Cleaning and Painting (Spot Blast)
941Fresh Water (Closed loop) Stern Tube Lubrication
952Bow Thruster Tunnel Grating Modification
1002High Pressure Air Relief Valve Calibration
1003RAM Tensioner Accumulator HP Air Pipe Support Bracket Replacement

Category B

025Physical Security at Private Contractor’s Facility in Force Protection Conditions Charlie – Delta
030Continuation of Services
902Dry Docking and Undocking Vessel

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it.