RFC_015_Response.pdf
PDF 7 KB Posted
- Attached to
- USNS HUMPHREYS (T-AO 188) ROH/DD
- Solicitation number
- N3220518R4013
About this file
RFC 0015
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4013
USNS JOSHUA HUMPHREYS (T-AO 188)
ATTACHMENT J - 8
REQUEST FOR SPECIFICATION CLARIFICATION
RFC __015_
NAME OF CONTRACTOR: _______________________________________________
SPECIFICATION ITEM NO.: _____0517___________
PARAGRAPH / SECTION NO:________7.1.1_______
TITLE: _NO. 1 AND 2 CENTRAL FRESH WATER COOLING PUMPS; OVERHAUL
QUESTION:
Paragraph 7.1.1 of the work items directs that the pump casing will remain on the ship. Paragraph 2 of standard item 087 as listed in paragraph 2.2.1 of the work item and invoked by paragraph 7.1 of the work item requires sandblasting of the pump casing and paragraph 3 of the standard item requires weld build up and machining of the pump casing. Please clarify the intent with respect to the pump casing.
ANSWER:
The Pump casings are for central fresh water pumps the housings are not expected to have damage. The casing should stay on the ship any damage to the casing including damage requiring weld build up or deterioration requiring sandblasting the MSCREP will issue a change to cover the additional work.
File details come from the government source that posted it.