RFC_013_Response.pdf
PDF 7 KB Posted
- Attached to
- USNS HUMPHREYS (T-AO 188) ROH/DD
- Solicitation number
- N3220518R4013
About this file
RFC 0013
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4013
USNS JOSHUA HUMPHREYS (T-AO 188)
ATTACHMENT J - 8
REQUEST FOR SPECIFICATION CLARIFICATION
RFC _0013__
NAME OF CONTRACTOR: _______________________________________________
SPECIFICATION ITEM NO.: ___0114______________
PARAGRAPH / SECTION NO: ___7.2.10-7.3.3_________________
TITLE: ___FLIGHT DECK PRESERVATION AND NON-SKID__________
QUESTION:
Paragraph 7.2.10 calls for UHP WJ-2 all areas and paragraphs 7.3 -7.3.3 specify SP-
10 and Power Tool Clean SP-11. Are we to perform both or is it our option to choose which method of surface preparation?
ANSWER: Water or shot blast is acceptable for flat surfaces power tool cleaning is for tie downs and inaccessible areas.