N3220518R4008
USNS HENRY J. KAISER (T-AO 187)
ATTACHMENT J - 8
REQUEST FOR SPECIFICATION CLARIFICATION
RFC 005
NAME OF CONTRACTOR: Mare Island Dry Dock, LLC
SPECIFICATION ITEM NO.: 207
PARAGRAPH / SECTION NO: 2.0, 7.2.3, 7.4, 7.5,
TITLE: MAIN ENGINE EXHAUST LEAK REPAIRS
QUESTION:
7.2 Remove all lagging, lagging pads/blankets and insulation from the following locations. Use references 2.1.1 and 2.1.2 as guidance.
References 2.1.1 and 2.1.2 state the drawings are (available on board vessel).
Can these drawings be provided for estimating purposes?
7.2.3 Retain lagging for re-installation. Damaged lagging shall be replaced with new, using existing lagging blankets as template for new blankets.
Shall the Bidder assume this would become additional work if lagging is found damaged?
7.4 again references 2.1.1 & 2.1.2 that are (available on board vessel)
Can these drawings be provided for estimating purposes?
7.5 Re-Install all lagging, insulation and lagging pads/blankets in the areas removed in paragraph 7.3 of this work item. Work and material shall be in accordance with reference 2.1.3.
There is no reference 2.1.3 in this specification.
ANSWER:
henry.robson Typewritten Text Drawing and References will be provided for estimating For replacement Lagging will be a change order,will revise item.