N3220518R4008
USNS HENRY J. KAISER (T-AO 187)
ATTACHMENT J - 8
REQUEST FOR SPECIFICATION CLARIFICATION
RFC 011
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 102
PARAGRAPH / SECTION NO: 3.1,7.1.14, 7.2.4, 7.3
TITLE: Tank Deck Overhead Preservation
QUESTION:
3.1 shows the location at “Frames (50 – 60) Total is approximately 35,000 square feet of preservation and painting.”
7.1.14 discusses: all areas on initial walkthrough will be agreed upon by the contractor and Port Engineer/Paint rep. Contractor is to provide a sketch of all areas agreed upon, as well as a schedule for completion of each zone.
• Is it the Government’s intent to 100% blast between “Frames (50 – 60) Total is approximately 35,000 square feet of preservation and painting.”
• Or is it the Government’s intent to designate the square footage of corroded areas for blasting after the walk through?
7.2.4 “Sandblast and mechanically clean to SP-11 all areas of the overhead, stiffeners, brackets, piping, stanchions, any and all attachments as designated by the Specification,”
• The specification does not specifically designate to sandblast the 35,000 square feet but discusses a walkthrough to agree on scope.
• Please clarify.
henry.robson Typewritten Text
N3220518R4008
USNS HENRY J. KAISER (T-AO 187)
ATTACHMENT J - 8
ANSWER:
henry.robson Typewritten Text Yes the governments intent is to blast 100% Walk through would be for any additional sq ft, which will require a change order The square footage and location is called out in para 3.1 as Total (Approx.)
Square Foot: 35,000 Sq. Ft