RFC_011_response.pdf

PDF 53 KB Posted

Attached to
USNS HENRY J. KAISER T-AO 187 MID-TERM AVAILABILITY
Solicitation number
N3220518R4008
Issued by

About this file

RFC 011 RESPONSE

View the file

Other files

File Type Posted
N3220518R4008-0012.docx DOCX document
N3220518R4008-0011.docx DOCX document
RFC_023_J-2_CAT_A_Revised_2.xlsx XLSX spreadsheet
RFC_022_RESPONSE.doc DOC document
RFC_024_RESPONSE.pdf PDF
N3220518R4008-0010.docx DOCX document
RFC_020_RESPONSE.doc DOC document
RFC_021_RESPONSE.doc DOC document
RFC_023_RESPONSE.pdf PDF
J-2_CAT_A_Revised.xlsx XLSX spreadsheet
N3220518R4008-0009.docx DOCX document
KAISER_MTA-19_-_Work_Item_Index_amend_a.docx DOCX document
J-2_Category_A_Items_REV_a.xlsx XLSX spreadsheet
N3220518R4008-0008.docx DOCX document
RFC_018_response.pdf PDF
RFC_019_response.pdf PDF
N3220518R4008-0007.docx DOCX document
RFC_013_response.pdf PDF
RFC_017_response.pdf PDF
N3220518R4008-0006.docx DOCX document
RFC_015_response.pdf PDF
RFC_016_response.pdf PDF
RFC_001_RESPONSE.pdf PDF
N3220518R4008-0005.pdf PDF
J-3_Category_B_Items.xlsx XLSX spreadsheet
N3220518R4008-0004.pdf PDF
RFC_2_response.pdf PDF
RFC_9_response.pdf PDF
RFC_6_response.pdf PDF
RFC_4_response.pdf PDF
RFC_5_response.pdf PDF
RFC_10_response.pdf PDF
RFC_7_response.pdf PDF
RFC_012_response.pdf PDF
RFC_8_response.doc DOC document
N3220518R4008-0003.docx DOCX document
RFC_-_3_response.pdf PDF
KAISER_MTA-19_-_Work_Item_Index_rev_1_AMEND_0004.docx DOCX document
N3220518R4008-U00002.docx DOCX document
18R4008-U00001_MOD.docx DOCX document
J-10_Interport_Differential_rev_1.doc DOC document
J-10_Interport_Differential_rev_1.doc DOC document
N3220518R4008-U00002.docx DOCX document
18R4008-U00001_CONF.docx DOCX document
CDRL,_WI-0012.pdf PDF
J-8_RFC.doc DOC document
J-12_Past_Performance_Data.docx DOCX document
CDRL,_WI-0015.pdf PDF
CDRL,_WI-0011.pdf PDF
J-13_PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4008

USNS HENRY J. KAISER (T-AO 187)

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION

RFC 011

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 102

PARAGRAPH / SECTION NO: 3.1,7.1.14, 7.2.4, 7.3

TITLE: Tank Deck Overhead Preservation

QUESTION:

3.1 shows the location at “Frames (50 – 60) Total is approximately 35,000 square feet of preservation and painting.”

7.1.14 discusses: all areas on initial walkthrough will be agreed upon by the contractor and Port Engineer/Paint rep. Contractor is to provide a sketch of all areas agreed upon, as well as a schedule for completion of each zone.

• Is it the Government’s intent to 100% blast between “Frames (50 – 60) Total is approximately 35,000 square feet of preservation and painting.”

• Or is it the Government’s intent to designate the square footage of corroded areas for blasting after the walk through?

7.2.4 “Sandblast and mechanically clean to SP-11 all areas of the overhead, stiffeners, brackets, piping, stanchions, any and all attachments as designated by the Specification,”

• The specification does not specifically designate to sandblast the 35,000 square feet but discusses a walkthrough to agree on scope.

• Please clarify.

henry.robson Typewritten Text

N3220518R4008

USNS HENRY J. KAISER (T-AO 187)

ATTACHMENT J - 8

ANSWER:

henry.robson Typewritten Text Yes the governments intent is to blast 100% Walk through would be for any additional sq ft, which will require a change order The square footage and location is called out in para 3.1 as Total (Approx.)

Square Foot: 35,000 Sq. Ft