J-2_Category_A_Items_REV_a.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- N3220518R4008
About this file
J-2 Category A Work Item Revision
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | ||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | ||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN | NSP | ||||||||||
| 007 | COLD WEATHER PLAN | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | ||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KINGPOST AREAS (ABS & USCG) | |||||||||||
| 103 | PROPELLER & SEA CHEST GRATE CLEANING/INSPECTION | |||||||||||
| 106 | Engine Room Supply Plenum Steel Renewal | |||||||||||
| 108 | Laundry Steel Deck Renewal | |||||||||||
| 114 | Deck Preservation | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | Port and Stbd PTO Coupling Overhaul | |||||||||||
| 202 | MAIN ENGINE COULPLING AND CLUTCH | |||||||||||
| 203 | Main_Engine_Fuel_Injector_-overhaul | |||||||||||
| 205 | MAIN REDUCTION GEAR INSPECTION | |||||||||||
| 206 | Main Eng Central Fresh Water Cooler Re-Gasket | |||||||||||
| 207 | Main Engine Exhaust Leak repairs | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CIRCUIT BREAKER INSPECTION REPAIR | |||||||||||
| 302 | Switchboard Cleaning and Inspections | |||||||||||
| 304 | Generator Maintenance | |||||||||||
| 305 | Motor Repairs | |||||||||||
| 307 | MCT_Repairs | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | Furuno RADAR-ECDIS Maintenance- | |||||||||||
| 402 | Annual Navigat X Gyro System Preventative Maint | |||||||||||
| 403 | Annual GMDSS Safety Radio Certifi | |||||||||||
| 404 | SVDR Replacement JRC JCY-1700S | |||||||||||
| 406 | ANNUAL MAGNETIC COMPASS MAINT | |||||||||||
| 409 | Remote Switching Control Unit Repairs_Groom | |||||||||||
| 410 | UHF SATCOM Groom | |||||||||||
| 411 | AVAYA Telephone System Groom | |||||||||||
| 412 | HF Equipment Groom | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | Reefer AC Units Repair Groom | |||||||||||
| 503 | Pump Repair | |||||||||||
| 504 | Clean and Paint MSD Tanks | |||||||||||
| 505 | Cargo OCM Replacement | |||||||||||
| 506 | Tank vent lines renewal | |||||||||||
| 508 | Fabricate New CPP Jumper Hoses | |||||||||||
| 509 | THERMOMETERS GAUGE CAL | |||||||||||
| 510 | Insp Mach Space Cranes and Hoists | |||||||||||
| 511 | HP Air Compressor Service | |||||||||||
| 513 | Main Engine Low Lube Oil Press-fuel oil trip | |||||||||||
| 514 | Aux Boilers Annual Maint | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | Fire Fighting Equipment Annual Inpection | |||||||||||
| 602 | Fire AFFF Hose Annual Insp | |||||||||||
| 603 | HALON BOTTLE REBUILD | |||||||||||
| 604 | Life Raft Annual Service | |||||||||||
| 605 | SCBA Equipment Annual Service | |||||||||||
| 606 | SCBA Compressor Annual Service | |||||||||||
| 607 | Immersion Suit Annual Service | |||||||||||
| 608 | LIFEBOAT DAVITS AND WINCHES ANNUAL SERVICE | |||||||||||
| 609 | LIFEBOATS ANNUAL SERVICE | |||||||||||
| 610 | RESCUE BOATS ANNUAL SERVICE | |||||||||||
| 611 | PORT RESCUE BOAT DAVIT ANNUAL SERVICE | |||||||||||
| 612 | STBD RESCUE BOAT DAVIT ANNUAL SERVICE | |||||||||||
| 614 | Elevator Re-cert | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | 05 Vent damper replacement | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | HP Air Fittings Replace | |||||||||||
| 1002 | UnRep Booth Window Preservation | |||||||||||
| 1003 | ASD Refurb FAS STA 2 & 6 | |||||||||||
| 1004 | Spanwire and Hauling Winch Electric Motor Refurb | |||||||||||
| 1005 | Refurb Outhaul ASD | |||||||||||
| 1006 | Ram Tensioner Assy Refurb | |||||||||||
| TOTAL |
&"Times New Roman,Regular"USNS HENRY J. KAISER
| CONTRACTOR PRICE BREAKDOWN | |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-18-R-4008 |
ATTACHMENT J-2
File details come from the government source that posted it.