RFC 014
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4002
USNS BIG HORN (T-AO 198)
REQUEST FOR SPECIFICATION CLARIFICATION
RFC # 014
NAME OF CONTRACTOR: _______________________________________________
SPECIFICATION ITEM NO.: _____________________
PARAGRAPH / SECTION NO:____________________
TITLE: _________________________________________________________________
QUESTION:
Paragraph 7.11 specifies three (3) tanks or spaces to be prepared for gas free certification within 5 days of the shipyard availability start; however, the three (3) described and WI numbers given do not match the work package.
Will the Government clarifiy the intended spaces and work items under this paragraph?
ANSWER:
Paragraph 7.11 has been changed to the following:
The following tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 5 days of the shipyard availability start:
· JP-5 Contamination Tank for WI 109
· Cargo Tank Recoating for WI 111
· Cargo Tank Repairs for WI 107
· Potable Water Tank for WI 113 A revised Work Item will be available through AMRDEC.