N3220518R4002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard WIs included for this solicitation:
SECTION 000 - GENERAL REQUIREMENTS
| 001 |
| INTENT, SCOPE, GENERAL REQUIREMENTS AND DEFINITIONS |
| “NSP” |
| 002 |
| TECHNICAL AND MANUFACTURER'S REPRESENTATIVES |
| “NSP” |
| 003 |
| APPROACH, BERTH, AND MOORING REQUIREMENTS |
| “NSP” |
| 004 |
| TESTING AND QUALITY ASSURANCE |
| “NSP” |
| 005 |
| ELECTRICAL SAFETY PROCEDURE REQUIREMENTS |
| “NSP” |
| 006 |
| HEAVY WEATHER PLAN |
| “NSP” |
| 007 |
| COLD WEATHER PLAN |
| “NSP” |
| 010 |
| FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) REV-1 |
| “A” |
| 011 |
| FURNISH GENERAL SERVICES (T-AO) |
| “A” |
| 012 |
| TELEPHONE SERVICES REV-1 |
| “A” |
| 013 |
| PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS |
| “A” |
| 014 |
| PREPARATION OF WEIGHT AND MOMENT REPORT |
| “A” |
| 015 |
| INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS |
| “A” |
| 016 |
| FIRE PROTECTION AND SHIP'S SAFETY PROGRAM |
| “A” |
| 017 |
| HANDLING SHIP'S STORES |
| “A” |
| 018 |
| DELIVERY AND REDELIVERY OF THE VESSEL |
| “A” |
| 019 |
| SHIPBOARD ACCESS AND SECURITY |
| “A” |
| 020 |
| GAS FREE CERTIFICATES |
| “A” |
| 021 |
| CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES REV-2 |
| “A” |
| 022 |
| DOCK TRIALS AND SEA TRIALS |
| "A" |
| 023 |
| HAZARDOUS WASTE DISPOSAL |
| "A" |
| 024 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY |
| NSP |
| 025 |
| PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY |
| “B” |
| 030 |
| CONTINUATION OF SERVICES |
| “B” |
SECTION 100 - HULL STRUCTURE
| 102 |
| CABLE BULKHEAD COLLAR MAGNA ROCK REPLACEMENT REV-2 |
| “A” |
| 103 |
| PROPELLER, SEA CHEST, & U/W HULL CLEANING |
| “A” |
| 108 |
| MISCELLANEOUS STEEL REPAIRS REV-1 |
| “A” |
| 109 |
| JP-5 CONTAM TANK DECK REPLACEMENT |
| “A” |
| 112 |
| CLIMBER SAFETY RAIL RENEWAL REV-1 |
| “A” |
POTABLE WATER TANK REPAIRS
RENEW CONTAINMENT TUB DRAIN VALVES REV-1
STEEL REPLACEMENT
“A” “A” “B”
SECTION 200 – MACHINERY, PROPULSION
| 201 |
| INDUSTRIAL ASSIST FOR 12K OVERHAUL |
| “A” |
| 202 |
| ME INTERCOOLER CLEANING |
| “A” |
SECTION 300 - ELECTRICAL
| 303 |
| MOTOR OVERHAUL REV-1 |
| “A” |
SECTION 400 – COMMUNICATIONS AND NAVIGATIONAL AIDS
“A”
| 401 |
| ANNUAL RADAR AND ECDIS MAINENANCE |
| “A” |
| 402 |
| ANNUAL DUAL GYRO AND STEERING SYSTEM MAINTENACE |
| “A” |
| 403 |
| ANNUAL GMDSS RECERTIFICATION |
| “A” |
| 404 |
| SVDR REPLACEMENT WITH JRC-1950 |
| “A” |
| 405 |
| ANNUAL MAGNETIC COMPASS MAINTENANCE |
| “A” |
| 407 |
| C-10315U REMOTE SWITCHING CONTROL UNIT REPAIRS GROOM |
| “A” |
| 410 |
| OE-82 UHF SATCOM ANTENNA OVERHAUL REV-1 |
| “A” |
SECTION 500 - MACHINERY, AUXILIARY SYSTEM
| 501 |
| AUXILIARY BOILER MAINTENANCE |
| “A” |
| 503 |
| SCBA COMPRESSOR/REFILL STATION SERVICING/INSPECTION |
| “A” |
| 505 |
| SSDG 60,000 HOUR OVERHAUL |
| “A” |
| 506 |
| SSDG VIBRATION DAMPNER OVERHAUL |
| “A” |
| 509 |
| CARGO BALLAST PUMP OVERHAUL |
| “A” |
| 510 |
| 01 DECK LP AIR RENEWAL |
| “A” |
| 512 |
| LESLIE JACKET WATER COOLING VALVES |
| “A” |
REMOVED
BRIDGE AC INSTALL
SECTION 600 - OUTFIT, FURNISHING AND HABITABILITY
| 601 |
| FIREFIGHTING EQUIPMENT RECERTIFICATION REV-1 |
| “A” |
| 602 |
| ELEVATOR RECERTIFICATION |
| “A” |
| 603 |
| ANNUAL INSPECTION OF LIFERAFTS |
| “A” |
| 604 |
| RESCUE BOAT RECERTIFICATION |
| “A” |
| 605 |
| RESCUE BOAT WINCH & DAVIT INSPECTION |
| “A” |
| 606 |
| LIFEBOAT RECERTIFICATION |
| “A” |
| 607 |
| LIFEBOAT DAVIT RECERTIFICATION |
| “A” |
| 608 |
| INSPECTION OF FIRE HOSES |
| “A” |
| 609 |
| INSPECTION OF AFFF HOSES |
| “A” |
| 610 |
| STATEROOM CARPET/TILE REPLACEMENT REV-1 |
| “A” |
| 611 |
| HEAD AND SHOWER TERRAZZO REPLACEMENT REV-1 |
| “A” |
| 612 |
| SCBA EQUIPMENT ANNUAL RECERTIFICATION REV-1 |
| “A” |
REMOVED
GALLEY DECK RESUFACING
ACCOM LADDER REPAIRS
FIRE & SMOKE DAMPER SERVICE REV-1
“A”
SECTION 800 –HEATING VENTILATION AND AIR CONDITIONING
| 801 |
| LAUNDRY VENTILATION SYSTEM CLEANING |
| “A” |
| 802 |
| GALLEY VENTILATION SYSTEM CLEANING |
| “A” |
SECTION 1000 – UNREP EQUIPMENT
| 1001 |
| REPLENISH PUMP MOTOR BEARING REPLACE |
| “A” |
| 1002 |
| ASD FAN MOTOR OVERHAUL |
| “A” |
| 1003 |
| WINCH CONTROL BOOTH SUBFLOOR REFURBISH |
| “A” |
| 1004 |
| HYDRAULIC TRANSMISSION HEAT EXCHANGER FRAME |
| “A” |
| 1006 |
| SADDLE WINCH SEAL REPLACEMENT |
| “A” |
| 1007 |
| SADDLE WINCH ELECTRIC MOTOR REPAIR |
| “A” |
| 1008 |
| REFURBISHMENT OF RAM TENSIONER ARC UNIT |
| “A” |
| 1009 |
| WINCH ELECTRIC MOTOR REFURBISH |
| “A” |
SECTION F - DELIVERY AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-JAN-2019 TO
19-FEB-2019
FOB: Destination
To:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 03-JAN-2019 TO
The following Delivery Schedule item for CLIN 0002 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-JAN-2019 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 03-JAN-2019 TO
The following Delivery Schedule item for CLIN 0003 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-JAN-2019 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 03-JAN-2019 TO
The following Delivery Schedule item for CLIN 0004 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-JAN-2019 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 03-JAN-2019 TO
The following Delivery Schedule item for CLIN 0005 has been changed from:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 01-JAN-2019 TO
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
POP 03-JAN-2019 TO
The following have been modified:
F-1 SHIP AVAILABILITY PERIOD
It is anticipated the ship will arrive at contractor’s yard on or about 03 JAN 2019. All work shall be completed in no more than forty-eight (48) calendar days from actual start date designated by the Government at time of contract award.