J-2_Category_A_Items.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USNS BIG HORN (T-AO 198) FY 19 MTA
- Solicitation number
- N3220518R4002
About this file
J-2
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT KINGPOSTS | |||||||||||
| 102 | CABLE BULKHEAD COLLAR MAGNA ROCK REPLACE | |||||||||||
| 103 | PROPELLER AND SEA CHEST CLEANING | |||||||||||
| 104 | NOT USED | |||||||||||
| 105 | NON-SKID DECK RESURFACING | |||||||||||
| 106 | TANK DECK OVERHEAD PRESERVATION | |||||||||||
| 107 | MISCELLANEOUS TANK REPAIRS | |||||||||||
| 108 | MISCELLANEOUS STEEL REPAIRS | |||||||||||
| 109 | JP-5 COMTAM TANK DECK REPLACEMENT | |||||||||||
| 110 | RENEW WTD AND SCHUTTLES | |||||||||||
| 111 | CARGO TANK PRESERVATION | |||||||||||
| 112 | CLIMBER SAFETY RAIL RENEWAL | |||||||||||
| 113 | POTABLE WATER TANK REPAIRS | |||||||||||
| 114 | RENEW CONTAINMENT TUB DRAIN VALVES | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | MAIN ENGINE 12K HOUR OVERHAUL | |||||||||||
| 202 | ME INTERCOOLER CLEANING | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CLEANING SWITCHBOARDS AND CONTROLLERS | |||||||||||
| 302 | OVERHAUL CIRCUIT BREAKERS | |||||||||||
| 303 | MOTOR OVERHAUL | |||||||||||
| 304 | PTO TECHNICAL REPRESENTATIVE | |||||||||||
| 305 | ERC MATTING REPLACEMENT | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | RADAR/ECDIS MAINTENANCE | |||||||||||
| 402 | NAVIGAT X GYRO SYSTEM PM | |||||||||||
| 403 | GMDSS SAFETY RADIO CERTIFICATE | |||||||||||
| 404 | SVDR RUTTER RECERTIFICATION | |||||||||||
| 405 | ANNUAL MAGNETIC COMPASS MAINT | |||||||||||
| 406 | TV/DTS REPLACEMENT | |||||||||||
| 407 | C-10315U REMOTE SWITCHING CONTROL UNIT REPAIRS | |||||||||||
| 408 | URT(D) URR-2368A HF SET GROOM | |||||||||||
| 409 | URHF SATCOM AND LOS ANTENNA GROOM | |||||||||||
| 410 | 0E-82 UHF SATCOM ANTENNA OVERHAUL | |||||||||||
| 411 | AVAYA TELEPHONE SYSTEM GROOM | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | AUXILIARY BOILER MAINTENANCE | |||||||||||
| 502 | START AIR COMPRESSOR SERVICE | |||||||||||
| 503 | SCBA COMPRESSOR/REFILL STATION SERVICE | |||||||||||
| 504 | ER OWS AND CARGO OCM GROOM | |||||||||||
| 505 | SSDG 60K HOUR OVERHAUL | |||||||||||
| 506 | SSDG VIBRATION DAMPNER OVERHAUL | |||||||||||
| 507 | VACUUM SEWAGE SYSTEM CLEANING | |||||||||||
| 508 | OVERHAUL BALANCED FAIRLEADS | |||||||||||
| 509 | CARGO BALLAST PUMP OVERHAUL | |||||||||||
| 510 | 01 DECK LP AIR RENEWAL | |||||||||||
| 511 | VARIOUS PUMP OVERHAULS | |||||||||||
| 512 | LESLIE JACKET WATER COOLING VALVES | |||||||||||
| 513 | CFW WASTER PIECES | |||||||||||
| 514 | BRIDGE A/C INSTALL | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | FIREFIGHTING EQUIPMENT RECERTIFICATION | |||||||||||
| 602 | ELEVATOR RECERTIFICATION | |||||||||||
| 603 | LIFERAFT RECERTIFICATION | |||||||||||
| 604 | RESCUE BOAT RECERTIFICATION | |||||||||||
| 605 | RESCUE BOAT WINCH & DAVIT INSPECT | |||||||||||
| 606 | LIFEBOAT RECERTIFICATION | |||||||||||
| 607 | LIFEBOAT WINCH & DAVIT INSPECTION | |||||||||||
| 608 | INSPECTION OF FIRE HOSES | |||||||||||
| 609 | INSPECTION OF AFFF HOSES | |||||||||||
| 610 | STATEROOM CARPET/TILE REPLACEMENT | |||||||||||
| 611 | HEAD AND SHOWER TERRAZZO REPLACE | |||||||||||
| 612 | SCBA EQUIPMENT ANNUAL RECERT | |||||||||||
| 613 | REPAIR DECK TITLE AND UNDERLAYMENT | |||||||||||
| 614 | GALLEY DECK RESUFACING | |||||||||||
| 615 | ACCOMMODATION LADDER REPAIRS | |||||||||||
| 616 | FIRE AND SMOKE DAMPER SERVICE | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | LAUNDRY VENTILATION SYSTEM CLEANING | |||||||||||
| 802 | GALLEY VENTILATION SYSTEM CLEANING | |||||||||||
| 803 | HEATING COIL RENEWAL | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | REPLENISHMENT PUMP MOTOR BEARING REPLACEMENT | |||||||||||
| 1002 | ASD FAN MOTOR OVERHAUL | |||||||||||
| 1003 | WINCH CONTROL BOOTH SUBFLOOR REFURBISHMENT | |||||||||||
| 1004 | HYDAULIC TRANSMISSION HEAT EXCHANGER FRAME | |||||||||||
| 1005 | RAM REPAIRS | |||||||||||
| 1006 | SADDLE WINCH SEAL REPLACEMENT | |||||||||||
| 1007 | SADDLE WINCH MOTOR REPAIR | |||||||||||
| 1008 | ARC REFURBISHMENT | |||||||||||
| 1009 | WINCH MAIN ELECTRIC MOT0R REFURBISHMENT | |||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS BIG HORN (T-AO 198) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220518R4002 |
ATTACHMENT J-2
File details come from the government source that posted it.