0021-RevB_A_CLEAN-GAS FREE TNKS, VOIDS N COFFERDAMS

View the file

Other files

File Type Posted
N18R400100005.docx DOCX document
WI_Index_FY19__ROH-RevA.doc DOC document
J-2_CAT_A-RevA.xlsx XLSX spreadsheet
ESP_PROGRAM_Intermediate_Hull_Survey_5.pdf PDF
0612-RevB_A_STATEROOM_REPAIRS.doc DOC document
RFC_006_Response.doc DOC document
RFC_007_Response.doc DOC document
RFC_008_Response.doc DOC document
RFC_009_Response.doc DOC document
N18R40010004.docx DOCX document
0111-RevB_A_ABS_INTERMEDIATE_TANK_SURVEY.doc DOC document
0618-RevB_A_Smoke_Stack_Indicator.docx DOCX document
0903-RevB_A_UNDERWATER_HULL_PRESERVATION.doc DOC document
RFC-004_-_Response.doc DOC document
RFC-005_-_Response.doc DOC document
0102-RevB_A_Tank_Preservation.doc DOC document
18R40010003.docx DOCX document
RFC-003_-_Response.doc DOC document
18R40010002.docx DOCX document
RFC-002_Response.doc DOC document
18R40010001.docx DOCX document
RFC-001_Response.doc DOC document
CDRL,_WI-0012.pdf PDF
CDRL,_WI-0011.pdf PDF
J-7,_RAPP,_18C4001.pdf PDF
CDRL,_WI-0015.pdf PDF
J-13,_RAPP,_Past_Perf_Questionaire.docx DOCX document
J-8_RFC.doc DOC document
J-15_Non-Mariner_Maint_KTR_Vetting_Sheet.pdf PDF
J-4,_GFM.xlsx XLSX spreadsheet
CDRL,_WI-0018.pdf PDF
CDRL,_WI-0010.pdf PDF
CDRL,_WI-0017.pdf PDF
CDRL,_WI-0014.pdf PDF
CDRL,_WI-0024.pdf PDF
J-11_Dry_Dock_Eval_Form_RAPPAHANNOCK,_ROH.docx DOCX document
CDRL,_WI-0023.pdf PDF
J-9,_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_WI-0016.pdf PDF
CDRL,_WI-004.pdf PDF
CDRL,_WI-0019.pdf PDF
J-10_Interport_Differentials.docx DOCX document
Solicitation,_N3220518R4001__RAPPAHANNOCK.docx DOCX document
J-12_Past_Perf_Data.docx DOCX document
CDRL,_WI-0020.pdf PDF
J-5_Sub-Contracting_Plan.docx DOCX document
CDRL,_WI-006.pdf PDF
CDRL,_WI-001.pdf PDF
J-2_Cat-A,_WI-RAPPAHANNOCK.xlsx XLSX spreadsheet
CDRL,_WI-005.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS RAPPAHANNOCK

( T-AO 204)

GENERAL REQUIREMENTS

N62649-16-R-0199

25 FEBRUARY 2014

ITEM 021-RevB

CATEGORY “A”

MSC/PO1B/REV FEB 14

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE

1.0 ABSTRACT

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES

2.1 References

2.1.1 NAVSEA Drawing 801-6580573, Capacity Plan

2.1.2 NAVSEA Drawing 835-7488110, Trim & Stability Booklet

2.2 Enclosures

2.2.1 USNS RAPPAHANNOCK ( T-AO 204) List of Applicable Tanks, Voids and Cofferdams

3.0 ITEM LOCATION/DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL: None.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED:

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 80 tons (25,238 gal) of fuel oil, 0 tons (0 gal) of JP-5 and 34 tons (9,922 gal) of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off loading of liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities. In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal. Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Item 0023 shall be used for the identification, handling and disposal. The costs for removal are still part of this (WI 021) work item. All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for each tank/space listed in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers.

Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank/space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.

7.9.3 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The following tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 5 days of the shipyard availability start:

· Tanks Preservation for WI 102

· Tank Reach Rod Repairs for WI 104

· ER Bilge Deck Renewal for WI 105

· Ballast Tank Stiffener Repairs for WI 106

7.12 Required Deliverable Report: Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A. Tank/Space Name

B. Tank/Space Location Designation

C. Date Tank/Space Opened

D. Date Gas Free Cleaning Started

E. Date Gas Free Cleaning Completed

F. Date Gas Free Cert. Received

G. Date ABS Initial Structural Survey Complete

H. Date Air Test/Hydro Test Completed

I. Date Final Tank/Space Cleaning Started

J. Date Final Tank/Space Cleaning Completed

K. Date Tank/Space Final Close

L. Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed/Date Installed

* Blasting -> date start/date complete

* Painting -> date start/date complete

* Related work items internal repairs

(pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added/removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None Additional

ENCLOSURE 2.2.1 – USNS RAPPAHANNOCK ( T-AO 204)

TANKS, VOIDS, AND COFFERDAMS

Cargo Oil Tanks Location Capacity

(gallons) No. 2C (DFM) Cargo Tank

4-22-0

217,485

No. 3C (JP-5) Cargo Tank

4-26-0

589,232

No. 4C (DFM/JP-5) Tank

4-31-0

289,222

No. 4 (DFM) Cargo Wing Tank, Port

4-31-2

125,833

No. 4 (DFM) Cargo Wing Tank, Stbd.

4-31-1

125,833

No. 5 (DFM) Cargo Wing Tank, Port

4-35-2

199,274

No. 5 (DFM) Cargo Wing Tank, Stbd.

4-35-1

199,274

No. 6 (DFM) Cargo Wing Tank, Port

4-39-2

243,691

No. 6 (DFM) Cargo Wing Tank, Stbd.

4-39-1

243,691

No. 7C Cargo Tank (DFM/JP-5)

4-43-0

578,443

No. 7 (DFM) Cargo Wing Tank, Port

4-43-2

252,438

No. 7 (DFM) Cargo Wing Tank, Stbd.

4-43-1

252,438

No. 8C Cargo Tank (DFM/JP-5)

4-47-0

No. 8 (DFM) Cargo Wing Tank, Port

4-47-2

252,466

No. 8 (DFM) Cargo Wing Tank, Stbd.

4-47-1

252,466

No. 9C Cargo Tank (JP-5)

4-51-0

No. 9 (DFM) Cargo Wing Tank, Port

4-51-2

240,147

No. 9 (DFM) Cargo Wing Tank, Stbd.

4-51-1

240,147

No. 10C Cargo Tank (JP-5)

4-55-0

491,676

No. 10 (DFM) Cargo Wing Tank, Port 4-55-2

200,256

No. 10 (DFM) Cargo Wing Tank, Stbd.

4-55-1

173,116

Cargo Lube Oil Tank

4-59-3

27,098

JP-5 Settling Tank

3-33-0

144,608

DFM Settling Tank, Center

3-41-0

126,585

JP-5 Contaminated Tank

3-36-2

36,192

DFM Contaminated Tank

3-37-1

41,599

Fuel Oil Tanks Location Capacity

No. 2 Fuel Oil Deep Tank, Port

4-59-2

49,775

No. 2 Fuel Oil Deep Tank, Stbd.

4-59-1

49,775

No. 3 Fuel Oil Deep Tank, Port

5-98-2

140,182

No. 3 Fuel Oil Deep Tank, Stbd.

5-98-1

140,182

Fuel Oil Service Tank

3-60-2

24,203

Fuel Oil Settling Tank

3-60-0

44,005

Aux. Fuel Oil Storage Tank

3-60-1

57,022

Aux. Fuel Oil Service Tank

2-60-2

13,699

Fuel Oil Tanks Location Capacity

Aux. Fuel Oil Service Tank, Aft

2-64-2

15,456

Aux. Fuel Oil Settling Tank

3-60-4

43,093

Miscellaneous Tanks Location Capacity

Contaminated F.O. Tank

5-60-0

19,702

Aux. Contaminated F.O. Tank

5-67-2

8,475

Oily Waste Tank

5-67-1

8,475

SSDG L.O. Drain Tank

5-81-0

3,220

CRP L.O. Drain Tank

5-83-2

1,938

Reduction Gear L.O. Drain Tank

5-83-0

4,083

Waste Oil Tank

5-86-0

21,964

L.O. Purifier Sludge Tank

5-93-0

1,872

Mn. Engine L.O. Drain Tank

5-95-0

5,716

Stern Tube L.O. Drain Tank, Stbd.

5-92-1

Stern Tube L.O. Drain Tank, Port

5-92-2

Oily Waste Tank

3-40-0

64,744

F.O. Purifier Sludge Tank

3-64-4

2,174

Motor Boat D.O. Tank

06-96-2

Emerg. Gen. D.O. Tank

06-97-2

1,089

Lube Oil Tanks

Location Capacity

Red. Gear L.O. Settling Tank

2-68-1

4,973

CRP L.O. Settling Tank

2-70-3

SSDG L.O. Storage Tank

2-72-1

SSDG L.O. Settling Tank

2-74-1

Mn. Engine L.O. Storage Tank

2-76-1

12,432

Mn. Engine L.O. Settling Tank

2-81-1

12,431

Mn. Engine L.O. Sump Tank, Port

5-66-2

5,873

Mn. Engine L.O. Sump Tank, Stbd.

5-66-1

5,873

Miscellaneous Spaces Location Fwd. Cargo Pump Room Bilge

4-33-0

Aft Cargo Pump Room Bilge

4-39-0

Motor Room No. 1 Bilge

4-34-0

Motor Room No. 2 Bilge

4-38-0

Motor Room No. 3 Bilge

4-41-0

Engine Room Bilge & Spaces

4-60-0

Ballast Tanks

Location

Capacity

Forepeak SW Ballast Tank

5-C-0

82,177

No. 1 DB Ballast Tank, Center

5-18-0

26,741

Deep Tank No. 1 SW Ballast, Center

4-18-0

233,514

No. 2 DB SW Ballast Tank, Center

5-22-0

63,686

No. 2 SW Ballast Wing Tank, Port

4-22-2

126,346

No. 2 SW Ballast Wing Tank, Stbd.

4-22-1

126,346

No. 3 DB SW Ballast Tank, Center

5-26-0

199,520

No. 3 SW Ballast Wing Tank, Port

4-26-2

189,370

No. 3 SW Ballast Wing Tank, Stbd.

4-26-1

189,370

Deep Tank No. 4 SW Ballast, Port

5-31-2

192,093

Deep Tank No. 4 SW Ballast, Stbd.

5-31-1

191,087

Deep Tank No. 5 SW Ballast, Port

5-35-2

188,729

Deep Tank No. 5 SW Ballast, Stbd.

5-35-1

189,690

Deep Tank No. 6 SW Ballast, Port

5-39-2

171,672

Deep Tank No. 6 SW Ballast, Stbd.

5-39-1

171,672

Deep Tank No. 7 SW Ballast, Port

5-43-2

168,563

Deep Tank No. 7 SW Ballast, Stbd.

5-43-1

168,563

Deep Tank No. 8 SW Ballast, Port

5-47-2

168,984

Deep Tank No. 8 SW Ballast, Stbd.

5-47-1

168,984

Deep Tank No. 9 SW Ballast, Port

5-51-2

177,693

Deep Tank No. 9 SW Ballast, Stbd.

5-51-1

177,693

Deep Tank No. 10 SW Ballast, Port

5-55-2

238,624

Deep Tank No. 10 SW Ballast, Stbd.

5-55-1

238,624

Aft Ballast Tank

5-110-0

59,596

Aft Peak Ballast Tank

5-119-0

307,521

Fresh Water Tanks

Capacity

Ship’s Potable Water, Fwd.

2-73-2

12,263

Ship’s Potable Water, Aft

2-80-2

18,805

Cargo Potable Water, Stbd.

2-102-7

51,994

Cargo Potable Water, Port

2-102-4

51,994

Cargo Feed Water, Stbd.

5-107-1

48,470

Cargo Feed Water, Port

5-107-2

48,470

Reserve Feed Water

2-88-1

5,999

Misc. Voids and Spaces

Steering Gear Void, Port

2-131-0 (850 sq. feet)

Steering Gear Void, STBD

2-131-0 (850 sq. feet) Fathometer trunk

5-65-0

Misc. Voids and Spaces

Vertical Cofferdam

5-106-0

Horiz. Cofferdam

2-108-1

Horiz. Cofferdam

2-111-2

Engineroom Voids

5-65-1, 2

Chain Locker Access

4-19-0

Doppler Speed Log

5-33-3

021-1