J-2_CAT_A-RevA.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- USNS RAPPAHANNOCK (TAO-204), ROH
- Solicitation number
- N3220518R4001
About this file
Revised - J-2 CAT "A"-RevA
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep/Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 007 | COLD WEATHER PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| Sub-Total | ||||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | STRUCTURAL STEEL REPAIRS | |||||||||||
| 102 | REMOVED | |||||||||||
| 103 | KING POST TESTING | |||||||||||
| 104 | TANK REACH ROD REPAIRS | |||||||||||
| 105 | ER BILGE DECK RENEWAL | |||||||||||
| 106 | BALLAST TANK 7S STIFFENER RPRS | |||||||||||
| 107 | STABILITY TEST | |||||||||||
| 108 | ER SIDE SHELL REPAIRS | |||||||||||
| 109 | REMOVED | |||||||||||
| 110 | 01 LEVEL DECK PLATE RENEWAL | |||||||||||
| 111 | REMOVED | |||||||||||
| 112 | Deck Tie Downs | |||||||||||
| 113 | Tank Deck BHD Renewal | |||||||||||
| Sub-Total | ||||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | PROPULSION SHAFT BRAKES OVHL | |||||||||||
| 202 | MAIN ENGINES, OIL LEAKS REPAIR | |||||||||||
| Sub-Total | ||||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CLEANING OF MAIN SWTCHBD & CONTROLERS | |||||||||||
| 302 | NOT USED | |||||||||||
| 303 | #1 PTO PONY MOTOR REPAIR | |||||||||||
| 304 | ANNUAL PTO CONTROLS & CABINET | |||||||||||
| 305 | MOTOR REPAIRS | |||||||||||
| 306 | REPLACE BALLAST TANK TLIs | |||||||||||
| 307 | CABLE TRANSIT BOUNDARY SURVEY | |||||||||||
| Sub-Total | ||||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | GMDSS RECERTIFICATION ANNUAL | |||||||||||
| 402 | RADAR ECDIS MAINTENANCE ANNUAL | |||||||||||
| 403 | NAVIGAT X GYRO SYSTEM | |||||||||||
| 404 | MAGNETIC COMPASS ANNUAL | |||||||||||
| 405 | SVDR REPLACEMENT RUTTER | |||||||||||
| 406 | REMOVED | |||||||||||
| 407 | AN/URT-23(D) AN/URR-2368A HF SET | |||||||||||
| 408 | UHF SATCOM AND LOS TRANSCEIVER | |||||||||||
| 409 | OE-82 UHF SATCOM ANTENNA | |||||||||||
| 410 | REPAIR HF TRANSMITTING ANTENNA | |||||||||||
| 411 | NAVMACS II UPGRADE SYSTEM | |||||||||||
| 412 | REMOVED | |||||||||||
| 413 | FATHOMETER DUAL TRANSDUCER PM | |||||||||||
| 414 | DOPPLER SPEED LOG PREVENT MAINTENANCE | |||||||||||
| Sub-Total | ||||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | REMOVED | |||||||||||
| 502 | AUX BOILERS GROOM | |||||||||||
| 503 | EDG GENERATOR | |||||||||||
| 504 | REMOVED | |||||||||||
| 505 | ME EXHAUST LAGGING | |||||||||||
| 506 | OVHL #2 CFW PUMP | |||||||||||
| 507 | REMOVED | |||||||||||
| 508 | MSD & VCHT TANK REPAIRS | |||||||||||
| 509 | RENEW BALLAST SYSTEM VLVS | |||||||||||
| 510 | REMOVED | |||||||||||
| 511 | DECK HEADS PP REPLACE | |||||||||||
| 512 | MSW PIPING REPAIRS | |||||||||||
| 513 | FM & AFFF PP EXP JT REPAIRS | |||||||||||
| 514 | OVERHAUL #1 MSW CLG PUMP | |||||||||||
| 515 | Cargo Piping UT Inspections | |||||||||||
| 516 | Aux FO Filling Line, Motor Boat | |||||||||||
| 517 | DFM Stripping Line, RAS Stations | |||||||||||
| 518 | HP AIR SYSTEM FITTING TESTING | |||||||||||
| 519 | REMOVED | |||||||||||
| 520 | Steering Pump Inspecton | |||||||||||
| 521 | Oily Waste Disch Line Renewal | |||||||||||
| 522 | Shore Steam & Cond Return Lines Renew | |||||||||||
| 523 | BALLAST TANK 6P PIPING REPAIR | |||||||||||
| 524 | PME LO Pump Leak Repairs | |||||||||||
| 525 | REMOVED | |||||||||||
| 526 | SSDG Governor Ovhls | |||||||||||
| 527 | #3 SSDG Turbocharger Overhauls | |||||||||||
| 528 | REMOVED | |||||||||||
| Sub-Total | ||||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | ANNUAL FIREFIGHTING RECERTIFICATION | |||||||||||
| 602 | REPLACE LIFEBOATS | |||||||||||
| 603 | RECERTIFICATION OF LIFEBOAT DAVITS | |||||||||||
| 604 | INSPECTION OF RESCUE BOATS | |||||||||||
| 605 | STBD RESCUE BOAT WINCH & DAVIT | |||||||||||
| 606 | PORT RESCUE BOAT DAVIT | |||||||||||
| 607 | SCBA COMPRESSOR ANNUAL SERV. | |||||||||||
| 608 | SCBA EQUIPMENT RECERTIFICATION | |||||||||||
| 609 | REMOVED | |||||||||||
| 610 | LIFERAFT RECERTIFICATION | |||||||||||
| 611 | ELEVATOR ANNUAL CERTIFICATION | |||||||||||
| 612 | REMOVED | |||||||||||
| 613 | LAUNDRY ROOM FLOORING RENEWAL | |||||||||||
| 614 | ANNUAL ACCOM LADDERS | |||||||||||
| 615 | REMOVED | |||||||||||
| 616 | REMOVED | |||||||||||
| 617 | IMMERSION SUITS ANNUAL INSPECT | |||||||||||
| 618 | REMOVED | |||||||||||
| 619 | REMOVED | |||||||||||
| 620 | CARGO PIPING BLOW DOWN | |||||||||||
| Sub-Total | ||||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | GALLEY RANGE MISC. EXHAUST | |||||||||||
| 802 | HOUSE VENTILATION CLEANING | |||||||||||
| 803 | LAUNDRY VENTILATION CLEANING | |||||||||||
| 804 | AIR SUPPLY HOUSING REPAIR | |||||||||||
| Sub-Total | ||||||||||||
| 900 | DOCKING / UNDOCKING | |||||||||||
| 901 | DRYDOCKING/UNDOCKING OF THE VESSEL | |||||||||||
| 902 | RUDDER HORN, PRESERVATION | |||||||||||
| 903 | UNDERWATER HULL PRESERVATION | |||||||||||
| 904 | REMOVED | |||||||||||
| 905 | BILDGE, KEEL, CLEANING & PRESERVATION | |||||||||||
| 906 | REMOVED | |||||||||||
| 907 | PROPELLOR, SHAFT, WEAR DOWN READINGS | |||||||||||
| 908 | OVHL SEA VALVES | |||||||||||
| 909 | RUDDER STERN FRAME EXAM | |||||||||||
| 910 | PROPELLOR MAINT | |||||||||||
| 911 | MARINE GROWTH INHIBITOR REPLACMENT | |||||||||||
| 912 | STERN TUBE SEAL MAINTENANCE AND SPUR | |||||||||||
| 913 | CATHODIC PROTECTION SYSTEM | |||||||||||
| 914 | TAILSHAFT REMOVALS | |||||||||||
| Sub-Total | ||||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | UNREP HP PRESS RELIEF VALVES | |||||||||||
| 1002 | WINCH CONTROL BOOTH STRUCTURAL / WINDOWS REPAIR | |||||||||||
| 1003 | REFURBISH STATION 4 HAULING WINCH ASSEMBLY AND MOTORS | |||||||||||
| 1004 | HIGHLINE PADEYE & LONG LINK REPL | |||||||||||
| 1005 | SLIDING BLOCK/TRANSFER HEAD/GUIDE ROLLER REFURBISHMENT AND KINGPOST REFURBISHMENT, STATION 3 | |||||||||||
| 1006 | SHEAVE REMOVAL AND REFURBISHMENT OF LOWER RAM TENSIONERS ASSEMBLIES | |||||||||||
| Sub-Total | ||||||||||||
| TOTAL |
| &"Times New Roman,Regular"USNS RAPPAHANNOCK (TAO-204) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"N3220518R4001 |
ATTACHMENT J-2
File details come from the government source that posted it.