18R3512_ATTACHMENT_P_TECH_OFFER_WORKSHEET_(rev_8).XLSX
XLSX spreadsheet 13 KB Posted
- Solicitation number
- N32205-18-R-3512
About this file
Atch P - Tech Offer Worksheet
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 N32205-18-R-3512 Attachment P: TECHNICAL OFFER WORKSHEET Author: Author:
Let's make sure that the requirement listed in the column is what is actually stated in the PWS for that section. Please insure that all sections in the PWS are addressed in the Tech Eval worksheet that the Program deems important to evaluate.
| LOCATION | REQUIREMENT | OFFEROR'S PROPOSAL (Box/Page #) |
| E-2.4.1.1 | Self-Sustaining | |
| E-2.4.1.2 | Vessel Age | |
| E-2.4.1.4 | Speed | |
| E-2.4.1.5 | Range | |
| E-2.4.1.6 | Endurance | |
| E-2.4.1.7 | Breadth | |
| E-2.4.1.8 | Draft | |
| E-2.4.1.9 | Berthing | |
| E-2.4.1.10 | Interoperability with MS Office Program (Office 2007 or newer) | |
| E-2.4.1.11 | Stowage | |
| E-2.4.1.12 | Capacity | |
| E-2.4.1.14 | Cargo Hold Fixed Spray Water Cooling System | |
| E-2.4.1.15 | Stores Gear | |
| E-2.4.1.16 | Fender System | |
| E-2.4.1.18 | Transport Capability | |
| E-2.4.2 | Cargo Gear | |
| E-2.4.3.2 | Controlled Cargo Environment | |
| E-2.4.3.3 | Environmental Control and Monitoring Sensors | |
| E-2.4.3.8 | Installation Acceptance and General Layout drawings | |
| E-2.4.5.1 | Dry Docking | |
| E-2.4.5.2 | Tin-Free Delivery | |
| E-2.4.6.1 | Air Draft | |
| E-2.4.6.2 | Boat Fueling Station | |
| E-2.4.6.3 | Bunkering | |
| E-2.4.6.4 | Accommodation Ladders |
Author: Author:
| E-2.4.6.5 | Water-Making Capability | |
| E-2.4.6.6 | Laundry Equipment | |
| E-2.4.7.1 | MSD | |
| E-2.4.7.2 | Incinerator | |
| E-2.4.8 | Spare Parts Storage Space | |
| E-2.4.8.1 | Onboard Stores | |
| E-2.4.8.2 | Paint Locker | |
| E-2.4.9 | Miscellaneous Equipment | |
| E-2.4.10 | Vessel Name | |
| E-7.1.2 | Capacity, Stowage and Characteristics Card | |
| E-7.1.3 | Stability Calculations | |
| E-7.1.4 | Hull Perimeter Lighting | |
| E-7.1.5 | Previous Voyage Itinerary | |
| E-9 | Cargo Hatch Safety Sockets | |
| E-10.1 | Operate Communications Equipment | |
| E-10.1.1 | Radiotelegraph Messages | |
| E-10.1.2 | Radiotelephone Services | |
| E-10.1.4 | Communication Administrative Services | |
| E-10.1.5 | Logs and Files | |
| E-10.1.6 | DOD GENSER Messaging | |
| E-10.2 | Navigation Equipment | |
| E-10.2.1 | ECDIS | |
| E-17.1.2 | CBR-D Equipment and Training | |
| E-18.1 | Delivery Schedule/Progress Chart | |
| E-18.2 | Drawings and Supporting Data | |
| E-18.3 | Draft Stowage Plans | |
| E-18.4 | Certificates and Inspections | |
| SF 1449 | ||
| Block 28 | General Requirements Acceptance Statement | |
| Dry Time Amended PART V | Facility Security Clearance |
File details come from the government source that posted it.