18R3512_ATTACHMENT_P_TECH_OFFER_WORKSHEET_(rev_8).XLSX

XLSX spreadsheet 13 KB Posted

Attached to
Time Charter for Carriage of USAF Cargo - Prepositioning
Solicitation number
N32205-18-R-3512
Issued by

About this file

Atch P - Tech Offer Worksheet

View the file

Other files

File Type Posted
N32205-18-R-3512-0005.docx DOCX document
18R3512_ATTACHMENT_D_DD254_(rev_1).pdf PDF
18R3512_ATTACHMENT_E_PWS_(rev_6).docx DOCX document
N32205-18-R-3512-0004.docx DOCX document
Attachment_D_Cvr.docx DOCX document
18R3512_ATTACHMENT_B_Basic_Pricing_Data_(rev_2).xlsx XLSX spreadsheet
MSC_Form_9010-8_(rev_11-81).docx DOCX document
N32205-18-R-3512-0003.docx DOCX document
18R3512_Q&A_Response_2.docx DOCX document
N32205-18-R-3512-0002.docx DOCX document
18R3512_ATTACHMENT_B_Basic_Pricing_Data_(rev_1).xlsx XLSX spreadsheet
N32205-18-R-3512-0001.docx DOCX document
18R3512_ATTACHMENT_L_SOM.pdf PDF
18R3512_ATTACHMENT_C_Crew_Complement.docx DOCX document
18R3512_ATTACHMENT_D_DD254.pdf PDF
18R3512_ATTACHMENT_P_TECH_OFFER_WORKSHEET_(rev_7).XLSX XLSX spreadsheet
18R3512_ATTACHMENT_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3512_ATTACHMENT_F_Request_for_Clarification_Question.docx DOCX document
18R3512_ATTACHMENT_M_CDRL.docx DOCX document
18R3512_ATTACHMENT_E_PWS_(rev_5).docx DOCX document
18R3512_DRAWING_1_-_Decon_Station.PDF PDF
18R3512_ATTACHMENT_G_DOL_WD.pdf PDF
18R3512_ATTACHMENT_J_SSS.doc DOC document
18R3512_ATTACHMENT_K_SFLLL.pdf PDF
18R3512_ATTACHMENT_N_MISSION_CARGO_DATA.docx DOCX document
N32205-18-R-3512_USAF_Flagged_Vessel.pdf PDF
18R3512_ATTACHMENT_H_ATFP.docx DOCX document
18R3512_ATTACHMENT_A-2_GFP_FP.xlsx XLSX spreadsheet
18R3512_ATTACHMENT_A-1_GFP_CBRD.xlsx XLSX spreadsheet
18R3512_ATTACHMENT_I_SPECS_FOR_CBRD.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 N32205-18-R-3512 Attachment P: TECHNICAL OFFER WORKSHEET Author: Author:

Let's make sure that the requirement listed in the column is what is actually stated in the PWS for that section. Please insure that all sections in the PWS are addressed in the Tech Eval worksheet that the Program deems important to evaluate.

LOCATIONREQUIREMENTOFFEROR'S PROPOSAL (Box/Page #)
E-2.4.1.1Self-Sustaining
E-2.4.1.2Vessel Age
E-2.4.1.4Speed
E-2.4.1.5Range
E-2.4.1.6Endurance
E-2.4.1.7Breadth
E-2.4.1.8Draft
E-2.4.1.9Berthing
E-2.4.1.10Interoperability with MS Office Program (Office 2007 or newer)
E-2.4.1.11Stowage
E-2.4.1.12Capacity
E-2.4.1.14Cargo Hold Fixed Spray Water Cooling System
E-2.4.1.15Stores Gear
E-2.4.1.16Fender System
E-2.4.1.18Transport Capability
E-2.4.2Cargo Gear
E-2.4.3.2Controlled Cargo Environment
E-2.4.3.3Environmental Control and Monitoring Sensors
E-2.4.3.8Installation Acceptance and General Layout drawings
E-2.4.5.1Dry Docking
E-2.4.5.2Tin-Free Delivery
E-2.4.6.1Air Draft
E-2.4.6.2Boat Fueling Station
E-2.4.6.3Bunkering
E-2.4.6.4Accommodation Ladders

Author: Author:

E-2.4.6.5Water-Making Capability
E-2.4.6.6Laundry Equipment
E-2.4.7.1MSD
E-2.4.7.2Incinerator
E-2.4.8Spare Parts Storage Space
E-2.4.8.1Onboard Stores
E-2.4.8.2Paint Locker
E-2.4.9Miscellaneous Equipment
E-2.4.10Vessel Name
E-7.1.2Capacity, Stowage and Characteristics Card
E-7.1.3Stability Calculations
E-7.1.4Hull Perimeter Lighting
E-7.1.5Previous Voyage Itinerary
E-9Cargo Hatch Safety Sockets
E-10.1Operate Communications Equipment
E-10.1.1Radiotelegraph Messages
E-10.1.2Radiotelephone Services
E-10.1.4Communication Administrative Services
E-10.1.5Logs and Files
E-10.1.6DOD GENSER Messaging
E-10.2Navigation Equipment
E-10.2.1ECDIS
E-17.1.2CBR-D Equipment and Training
E-18.1Delivery Schedule/Progress Chart
E-18.2Drawings and Supporting Data
E-18.3Draft Stowage Plans
E-18.4Certificates and Inspections
SF 1449
Block 28General Requirements Acceptance Statement
Dry Time Amended PART VFacility Security Clearance

File details come from the government source that posted it.