18R3512_ATTACHMENT_P_TECH_OFFER_WORKSHEET_(rev_7).XLSX
XLSX spreadsheet 13 KB Posted
- Solicitation number
- N32205-18-R-3512
About this file
18R3512 ATTACHMENT_P_TECH OFFER WORKSHEET (rev 7)
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 N32205-18-R-3512 Attachment P: TECHNICAL OFFER WORKSHEET Author: Author:
Let's make sure that the requirement listed in the column is what is actually stated in the PWS for that section. Please insure that all sections in the PWS are addressed in the Tech Eval worksheet that the Program deems important to evaluate.
| LOCATION | REQUIREMENT | OFFEROR'S PROPOSAL (Box/Page #) |
| E-2.4.1.1 | Vessel Age | |
| E-2.4.1.4 | Speed | |
| E-2.4.1.5 | Range | |
| E-2.4.1.6 | Endurance | |
| E-2.4.1.9 | Breadth | |
| E-2.4.1.10 | Interoperability with MS Office Program (Office 2007 or newer) | |
| E-2.4.1.15 | Cranes | |
| E-2.4.1.15 | Stores Gear | |
| E-2.4.1.16 | Self-Sustaining Capability | |
| E-2.4.1.17 | Fender System | |
| E-2.4.1.19 | Transport Capability | |
| E-2.4.2 | Cargo Gear | |
| E-2.4.5.1 | Dry Docking | |
| E-2.4.5.2 | Tin-Free Delivery | |
| E-2.4.6.1 | Air Draft | |
| E-2.4.6.3 | Bunkering | |
| E-2.4.6.4 | Accommodation Ladders |
Author: Author:
| E-2.4.6.5 | Water-Making Capability | |
| E-2.4.6.6 | Laundry Equipment | |
| E-2.4.7.1 | MSD | |
| E-2.4.7.2 | Incinerator | |
| E-2.4.8 | Spare Parts Storage Space | |
| E-2.4.8.1 | Onboard Stores | |
| E-2.4.8.2 | Paint Locker | |
| E-2.4.9 | Miscellaneous Equipment | |
| E-2.4.10 | Vessel Name | |
| Dry Time | Capacity, Stowage and Characteristics Card | |
| E-7.1.3 | Stability Calculations | |
| E-7.1.4 | Hull Perimeter Lighting | |
| E-9 | Cargo Hatch Safety Sockets | |
| E-10.1 | Operate Communications Equipment | |
| E-10.1.1 | Radiotelegraph Messages | |
| E-10.1.2 | Radiotelephone Services | |
| E-10.1.4 | Communication Administrative Services | |
| E-10.1.5 | Logs and Files | |
| E-10.1.6 | DOD GENSER Messaging | |
| E-10.2 | Navigational Equipment | |
| E-10.2.1 | ECDIS | |
| E-17 | CBR-D | |
| E-18.1 | Delivery Schedule/Progress Chart | |
| E-18.2 | Drawings and Supporting Data | |
| E-18.3 | Draft Stowage Plans | |
| E-18.4 | Communications and Data | |
| E-18.5 | Certificates and Inspections | |
| E-18.6 | Previous Voyage Itinerary | |
| SF 1449 | ||
| Block 28 | General Requirements Acceptance Statement |
File details come from the government source that posted it.