ATTACHMENT_III_-_Sample_Tasks.pdf

PDF 177 KB Posted

Attached to
Ship Inspection & Engineering Services
Solicitation number
N3220518R0055
Issued by

About this file

Sample Tasks

View the file

Other files

File Type Posted
N3220518R0055U0006_FINAL.pdf PDF
N3220518R0055U0006.pdf PDF
Attachment_VIII_-_Pricing_Spreadsheet_-_Amendment_0005.xls XLS spreadsheet
N3220518R0055U0005.pdf PDF
N3220518R0055U0004.pdf PDF
Attachment_VIII_-_Pricing_Spreadsheet_REV_1.xls XLS spreadsheet
Amendment_0003.docx DOCX document
N3220518R0055U0002.pdf PDF
N3220518R0055U0001.pdf PDF
N3220518R0055.pdf PDF
ATTACHMENT_VII_-_QASP.pdf PDF
ATTACHMENT_IV_-_Past_Performance_Data_Sheet.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
ATTACHMENT_II_-_SMART_Test_Plan_Format.pdf PDF
ATTACHMENT_IX_-_DD_254.pdf PDF
N3220518R0055.pdf PDF
ATTACHMENT_VIII_-_Pricing_Spreadsheet.xls XLS spreadsheet
ATTACHMENT_I_-_Sample_SMS-IA_Assessment_Report.pdf PDF
ATTACHMENT_V_-_Past_Performance_Questionnaire.pdf PDF
ATTACHMENT_VI_-_NDA.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment III

Attachment A-3

SAMPLE TASK 1: SMART inspection of the USNS OVERTHEHORIZON (T-EST 001)

The purpose of this task is to plan, prepare, provide resources and test equipment and conduct the

SMART inspection for the vessel, and prepare the report.

Specific Tasks:

1. USNS OVERTHEHORIZON (T-EST 001): Support shall include conducting main propulsion (MP) and auxiliary (AX) machinery inspection test plans, shipboard safety inspection test plans, infra-red survey of the ship’s switchboards, load centers and power panels, and temporary installation of a shaft torque meter to measure torque, shaft RPMs and calculate shaft horsepower. The Contractor shall provide a total of five (5) people to support this inspection, including: One Engineer to set up the shaft torque meter(s) and to assist with MP/AX inspections. A second Engineer to assist with MP/AX inspections. One engine/marine surveyor/safety specialist to assist with Safety inspections. One

Engineer/Marine Surveyor to assist the SMART Coordinator and to capture test plan changes, and one thermographer.

2. Pre-SMART Meeting: The Contractor shall attend a meeting at the MSC Norfolk location to discuss preparations and expectations for supporting the USNS OVERTHEHORIZON

(T-EST 001) SMART inspection.

3. The Contractor shall assemble all existing test plans for all inspection areas for the scheduled SMART from the SMART Team Coordinator.

a. The Contractor shall review all test plans and shall validate through

SAMM and ShipClip that all test plans are linked to the current machinery and equipment onboard.

b. As directed by the SMART Team Coordinator, the Contractor shall update test plans based on comments from the ship (relayed via the

SMART Team Coordinator) and/or via discrepancies noted by the

Contractor’s comparison of test plans to equipment noted in SAMM and

ShipClip. These changes shall be maintained/tracked on the change log discussed in paragraph 2.1.6.3 below.

c. The Contractor shall provide all ship specific test plans to the SMART

Coordinator no later than 30 days before the scheduled SMART start date.

4. The Contractor shall provide the services of a qualified Thermographer to accomplish an infra-red survey of all switchboards, power panels, lighting panels and group control centers. The Contractor shall develop an Infra-red Survey Report as follows:

a. The Contractor shall provide a comprehensive report of each load center, power panel and switchboard element inspected and findings.

b. The report shall provide an infra-red and normal picture of each hotspot found. The report page shall show pictures, identify the element, provide a descriptive rating of the severity of the finding, and the recommended corrective actions.

c. The Thermographer shall notify the ship’s Chief Engineer and the

SMART Team Coordinator immediately when hot spots considered to require immediate attention are discovered.

5. The Contractor shall provide one (1) engineer to provide and temporarily install a shaft torque meter(s) to measure and record shaft torque, horsepower, and RPMs during the underway full power run. This engineer shall assist the SMART team in MP/AX inspections. A second engineer shall assist with MP/AX inspection support or other inspection areas as assigned by the SMART Coordinator.

a. The Contractor shall develop a Full Power Shaft Horsepower Report containing raw data as collected from the full power run and calculated shaft horsepower attained during this time period.

6. The Contractor shall provide one (1) engineer/marine surveyor/safety specialist to assist the

SMART team by carrying out all Safety test plans, and providing SMART inspection findings to the SMART Team Coordinator.

7. The Contractor shall provide one (1) engineer/surveyor to support the SMART Coordinator in red-lining and updating test plans based upon input provided by SMEs during the actual

SMART.

a. Engineer shall work with all SMEs during the SMART inspection to capture recommended updates, observing the test plan issues to fully understand suggested changes. Engineer will develop a listing of suggested changes for review by the SMART Coordinator and SMART

Team Naval Officers prior to completion of the SMART inspection.

b. Engineer shall research all changes to determine applicability to other ships in the Class within 2 weeks of the end of the SMART Inspection and notify the SMART Coordinator of findings.

c. Upon approval by the SMART Coordinator, engineer shall update all applicable test plans. Engineer shall maintain a log of test plan updates including date of update, SME that identified initial discrepancy, applicability and date of authorization. This log shall be maintained for all MSC ships.

d. The Contractor shall develop a Trip Report from USNS

OVERTHEHORIZON (T-EST 001) SMART attendees recording observations, questions, and suggestions concerning the conduction of the SMART inspection.

The Contractor shall develop the final SMART report in electronic format. A copy of the final inspection files will be provided to the contractor by the SMART Coordinator, and the Contractor will upload to

MSC’s Virtual Tech Library with 45 days after the completion of the inspection. The Contractor shall consolidate all inputs including inspection data, pictures, and attached documents into the report format.

The SMART Team Coordinator shall provide the contractor the final database of SMART inspection findings, attachments and final assessments within 10 days of completion of the SMART.

SAMPLE TASK 2: Root Cause Analysis on the USNS OVERTHEHORIZON (T-EST 001)

The purpose of the task is to accomplish a root cause failure investigation and analysis of a connecting rod bolt failure on SSDG #1, using industry RCA practices such as the “5 Whys”, and provide a report detailing findings and recommendations.

1. Support shall include assembling a technical team with diesel engine expertise to attend the ship, observe the engine in as-is state and during disassembly, interview crew, discuss findings with

OEM technical representatives, collect engine log data and failed parts.

2. Arrange with the MSC TPOC to send failed parts back to a material failure analysis laboratory.

3. Map out root casual factors and contributing factors.

4. Provide interim and final reports on findings, observations and root causes. Provide recommendations to avoid repeat failures.

SAMPLE TASK 3: SMART test plan development for a new ship class

USNS OVERTHEHORIZON (T-EST 001) is set to deliver to MSC in 60 days. The ship will accomplish Operational Test and Evaluation over the next 6 months, followed by Final Contract

Trials. Task will require the Contractor to develop comprehensive shipboard equipment and system test and evaluation plans to be utilized to demonstrate the capabilities of the ship for Final Contract

Trials.

1) Review fleet introduction manuals, technical documentation and other Government Furnished

Information and develop a draft index of shipboard test and evaluation plans.

2) Develop a POAM to research, establish test and evaluation criteria, and write test and evaluation plans for the ship.

a. Discuss resource requirements

b. Discuss significant milestone

3) Determine evaluation criteria.

4) Discuss methods to validate test and evaluation plans

5) Provide project management, coordination and administration support for the ship’s crew pre-

Final Contract Trial preparation and practice events.

6) Support post-FCT event to identify issues and update test and evaluation plans for future SMART inspections.

SAMPLE TASK 4: Re-engine study onboard the USNS OVERTHEHORIZON (T-EST 001)

Task will require the Contractor to accomplish a study for re-engineing the main propulsion engines.

1) Develop a POAM for the task. Highlight key milestones.

2) Review operation, maintenance and repair history for the engines. Identify specific issues necessitating engine replacement. Discuss upgrade/modification options in lieu of replacement.

3) Discuss latest technologies, regulatory requirements and other factors influencing options.

4) Discuss full spectrum of options and identify ROM lead time and machinery acquisition costs for each option.

5) Provide recommendations, cost/benefit analysis and publish the report.

6) Prepare presentations as directed by the MSC POC to disseminate the main points from the study.

SAMPLE TASK 5: Test Plan Development Support for USNS GO-CO Vessel (T-EST 001)

1) Prepare a new set of test plans [approximately 150 per vessel] to facilitate SMART and inspections on GOCO vessel.

2) Contractor to arrange a kick-off meeting within one (1) week of acceptance of the Order. The meeting shall be held in the Norfolk area or via teleconference. The Contractor shall contact the

Technical Point of Contact (TPOC) and arrange the date and location of the meeting. All key personnel (project manager and lead engineer) are required to attend the kick-off meeting.

3) The Contractor shall verify that the criteria in the various equipment technical manuals

(accessible via the MSC Virtual Tech Library (VTL)) are reflected in the newly developed test plans.

4) The Contractor shall provide a report outlining the new test plan development schedule to facilitate the development/ validation/ review of the new test plans

5) The Contractor shall hold a one-day meeting in the Norfolk, VA area with MSC TPOCs to discuss new test plan development. All key personnel shall be in attendance.

6) The Contractor shall develop/ draft new test plans in accordance with those recommendations.

These new test plans will be validated and updated for use prior the required reading session with

MSC. Test procedures for major propulsion and auxiliary equipment shall conform to either

Society of Naval Architects and Marine Engineers (SNAME) codes or American Society of

Mechanical Engineers (ASME) Performance Test Codes (PTC). All other equipment may be required to be tested in accordance with the Original Equipment Manufacturer’s (OEM) recommendations. When OEM’s recommendations do not address testing, the test procedure will be developed by the Contractor using acceptable engineering practice.

7) The Contractor shall host a 1-day reading session in the Norfolk, VA area for approximately six

(6) MSC attendees to discuss the newly Drafted/ Developed Test Plans . The Contractor shall provide hard copies of the Draft Test Plans and be prepared to record action items and mark up the drafts during the reading session. All comments from the reading session are to be incorporated into the subsequent deliverables. All key personnel are required to attend the reading session.

8) The Contractor shall incorporate the comments from the Reading Session to develop the final

Test Plans.

9) The Contractor shall host a 1-day reading session in the Norfolk, VA area for approximately six

(6) MSC attendees to discuss the Final Test Plans. The Contractor shall provide hard copies of the

Final Test Plans and be prepared to record action items and mark up the finals during the reading session. All comments from the reading session are to be incorporated into the subsequent deliverables. All key personnel are required to attend the reading session.

10) The Contractor shall manage the replication of newly developed test plans to each GOCOs

SAMM (Ship Automated Maintenance Management) system.