ATTACHMENT_II_-_SMART_Test_Plan_Format.pdf
PDF 2 MB Posted
- Attached to
- Ship Inspection & Engineering Services
- Solicitation number
- N3220518R0055
About this file
SMART Test Plan Format
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3220518R0055U0006_FINAL.pdf | ||
| N3220518R0055U0006.pdf | ||
| Attachment_VIII_-_Pricing_Spreadsheet_-_Amendment_0005.xls | XLS spreadsheet | |
| N3220518R0055U0005.pdf | ||
| N3220518R0055U0004.pdf | ||
| Attachment_VIII_-_Pricing_Spreadsheet_REV_1.xls | XLS spreadsheet | |
| Amendment_0003.docx | DOCX document | |
| N3220518R0055U0002.pdf | ||
| N3220518R0055U0001.pdf | ||
| N3220518R0055.pdf | ||
| ATTACHMENT_VII_-_QASP.pdf | ||
| ATTACHMENT_IV_-_Past_Performance_Data_Sheet.pdf | ||
| Exhibit_A_-_CDRLs.pdf | ||
| ATTACHMENT_III_-_Sample_Tasks.pdf | ||
| ATTACHMENT_IX_-_DD_254.pdf | ||
| N3220518R0055.pdf | ||
| ATTACHMENT_VIII_-_Pricing_Spreadsheet.xls | XLS spreadsheet | |
| ATTACHMENT_I_-_Sample_SMS-IA_Assessment_Report.pdf | ||
| ATTACHMENT_V_-_Past_Performance_Questionnaire.pdf | ||
| ATTACHMENT_VI_-_NDA.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 9 SWBS TEST NO. 20001
SHIP MATERIAL ASSESSMENT & READINESS TESTING
SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.
MCLEAN (T-AKE 12) FULL POWER TRIAL FULL AHEAD 20001
REVISION DATE
05/02/2016
ASSESSMENT/
TEST DATE
ORGANIZATION PERFORMING
ASSESSMENT/TEST
SENIOR INSPECTOR
(PRINT NAME)
ABSTRACT: This test memo records and assesses numerous system and component operating parameters while underway with the ship making full ahead power for one hour. Readings of parameters are obtained in 20-minute intervals.
DOCUMENTATION (REFERENCES)
REFERENCE PUBLICATION NO. TITLE
A T9233-CF-IMC-010 DIESEL ENGINES, MAIN POWER GENERATION MODELS 9L 48/60
AND 8L 48/60 VOLUME B1, ENGINE OPERATING INSTRUCTIONS
B T9235-AN-MMC-010 T-AKE PROPULSION CONTROL SYSTEM
C T9AKE-AA-MAN-010 ENGINEER’S OPERATING MANUAL VOLUME 1
D T9AKE-AA-MAN-020 ENGINEER’S OPERATING MANUAL VOLUME 2
E MSC 310-7488776 ELECTRIC POWER LOAD ANALYSIS
ASSOCIATED SWBS TESTS/INSPECTIONS
SWBS NUMBER SWBS TEST TITLE
20002 FULL POWER TRIAL FULL ASTERN
20301 DIESEL GENERATOR 80% LOAD TEST
20302 DIESEL GENERATOR BLACKOUT RECOVERY (PRE-UNDERWAY)
20303 MAIN PROPULSION ELECTRIC MOTOR
20204 MAIN PROPULSION - DIESEL AUTOMATION
20205 MAIN PROPULSION - DIESEL LUBE OIL SYSTEM
20206 MAIN PROPULSION - DIESEL FUEL OIL SYSTEM
20207 MAIN PROPULSION - DIESEL COOLING WATER SYSTEMS
30011 ELECTRICAL PANEL INSPECTION AND THERMOGRAPHY - LISTS
30104 EMERGENCY DIESEL GENERATOR
30401 PROPULSION TRANSFORMERS
30404 SYNCH COMPENSATORS & STATIC FREQ CONVERTERS
30405 POWER COVERSION EQUIPMENT HARMONIC FILTERS
30701 ABT AND ELECTRICAL INTERLOCK
COMMENTS:
VESSEL REPAIR REQUESTS (VRR)
Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.
PARAMETER YES/NO EQPT: EQPT: EQPT:
Are there unresolved VRRs prior to testing? If “Yes,” list them.
VRR: VRR: VRR:
Were VRRs generated after testing? If “Yes,” list them.
VRR: VRR: VRR:
Do any of the above listed
VRRs limit operation? If
“Yes,” list them.
VRR: VRR: VRR:
ATTACHMENT II
2 of 9 SWBS TEST NO. 20001
COMMENTS:
SPECIAL INSTRUCTIONS
No condition should be present that would prevent safe operation of the machinery. Before getting underway 50% of all machinery must be cleared unless a waiver is obtained from the Commander and SMART Coordinator. All necessary safety, pre-underway or pre-operating checks must have been performed before beginning this demonstration. Equipment on-line during Full Power Trial.
PARAMETER QTY IN USE,
REQUIRED
QYT IN USE,
OBSERVED
REFERENCE
NOTE NO.
SAT/UNSAT
Propulsion Motor (at MCR) 2 (in tandem)
Propulsion Motor Bearing Jacking Pumps 2
Propulsion Transformer 4
Propulsion Frequency Converters 4
Propulsion Motor Exciters 2
SS/Distribution Transformer 2
Harmonic Filters 2
Main Diesel Generator Sets 4
MDG L.O. Purifiers, incl. feed pumps and heaters 4
MDG Lube Oil Cooler 4
Distilling Plant 1
Distiller Feed Pump 1
Distiller Distillate Pump 1
Proportioning Brominator 1
Recirculating Brominator 1
MDG Fuel Service Pump 2
Fuel Purifiers, incl. feed pumps and heaters 1
Central Seawater Cooling Pump 2
Central LT F.W. Cooling Pump 2
Central LT F.W. Cooler 2
MDG HT F.W. Cooling Pump 2
MDG HT F.W. Cooler 2
MDG HT Cooling Water Pre-Heater Units 2 1
Emergency Fire Pump 1
Starting Air Compressor 2 1
Ship Service / Control Air Compressor 2 1
Control Air Dehydrator 2
Cargo Refrigeration Control Air Dehydrator 1
EOS A/C Unit 2
Main A/C Plants 4
Cargo Refrigeration Plants 2
Brine Refrigeration Plants 2
Potable Water Pump 3 1
Hot Water Circ Pump 2
PARAMETER QTY IN USE,
REQUIRED
QYT IN USE,
OBSERVED
REFERENCE
NOTE NO.
SAT/UNSAT
Potable Water Heater 3
Machinery Rooms Bilge Housekeeping Pumps 2 1
Cargo Hold Bilge Housekeeping Pumps 2 1
Cargo Pump Room Bilge Housekeeping Pumps 2 1
Main Machinery Room Port Supply Fans 1
Main Machinery Room Stbd Supply Fans 1
Exhaust Fans, Main Machinery Room 1
Supply Fans, Propulsion Motor Room 2
Exhaust Fans, Propulsion Motor Room 2
Supply Fans, Aux. Machinery Room 2
Exhaust Fans, Aux. Machinery Room 2
Purifier Room Exhaust Fan 1
Engineer’s Workshop Supply Fan 1
3 of 9 SWBS TEST NO. 20001
Purifier Room, Elec Workshop & EOS Supply Fan 1
Ship Service Refrigeration Plants 1
Marine Sanitation Device (incl. pumps and compressor)
Accommodation Air Handling Unit 4
Misc. Ventilation Fans and Heaters 4
NOTES:
1. Under automatic control.
2. The electrical load is to be adjusted to the extent that each genset is loaded to approximately 32,341 kW total connected load, to simulate the design full propulsion power summer condition.
3. Full propulsion power is defined as the rated 22,524 kW combined output power of the tandem Propulsion Motors.
Design shaft speed is 120 rpm.
4. Fans, heaters and air handling units for miscellaneous accommodation and machinery spaces are to be aligned in accordance with that listed in MSC Dwg No. 310-7488776, Electric Load Analysis, under the “Transit 20 Knot” operating condition.
FULL POWER TRIAL - (BRIDGE AND DRAFT DATA)
Instructions: Record data every 20 minutes during Full Power Trial.
PARAMETER DESIGN SET 1
OBSERVED
SET 2
OBSERVED
SET 3
OBSERVED
SAT/UNSAT
Time
Barometric pres., mbar
Air temperature, °F
Speed through water, knots
Speed over ground, knots
Ship’s heading true °
Relative wind speed, knots
Relative wind direction, °
Wave height, ft
Relative wave direction, °
Swell height, ft
Relative swell direction, °
Water depth, ft
Prop RPM, Bridge tachometer 120 RPM
Forward, ft
Aft, ft
Mean, ft
Displacement, long tons 40,880
FULL POWER TRIAL DATA – (EOS CONSOLE)
Instructions: Print three sets of the following Mimic screens in 20 minute intervals. Use table below to help keep track of printing. If printer is down, photos should be taken of the Mimic screens; enter photo # in the cells below. Average the results and enter the data in the corresponding boxes. Source locations for data are shown in brackets [ ]. Number values = corresponding MCCS MIMIC. PC = Propulsion
Control Screen. VC = Vessel Control Screen.
MIMIC SCREEN NAME
MIMIC LOCATION FULL POWER SAT/
UNSAT SET 1 SET 2 SET 3
Gen. 1 Loading & Control
VC / MCCS MIMIC No. 12
Gen. 2 Loading & Control
Gen. 3 Loading & Control
Gen. 4 Loading & Control
Diesel Engine No. 1 F-1 / MCCS MIMIC No. 1
Diesel Engine No. 2 F-2 / MCCS MIMIC No. 2
4 of 9 SWBS TEST NO. 20001
Diesel Engine No. 3 F-3 / MCCS MIMIC No. 3
Diesel Engine No. 4 F-4 / MCCS MIMIC No. 4
Diesel Engine Exhaust Gas VC / MCCS MIMC No. 16
Generator 1 VC / MCCS MIMIC No. 5
Generator 2 VC / MCCS MIMIC No. 6
Generator 3 VC / MCCS MIMIC No. 7
Generator 4 VC / MCCS MIMIC No. 8
Transformer 1A VC / MCCS MIMIC No. 51
Transformer 1B PC / MCCS MIMIC No. 41
Transformer 2A PC / MCCS MIMIC No. 31
Transformer 2B PC / MCCS MIMIC No. 21
Converter 1A / 1B PC / MCCS MIMIC No. 62
Converter 2A / 2B PC / MCCS MIMIC No. 61
Harmonic filters VC / MCCS MIMIC No. 14
Propulsion Motor 1A PC / MCCS MIMIC No. 54
Propulsion Motor 1B PC / MCCS MIMIC No. 44
Propulsion Motor 2A PC / MCCS MIMIC No. 34
Propulsion Motor 2B PC / MCCS MIMIC No. 24
Motor shaft PC / MCCS MIMIC No. 25
Bow thruster & line shaft brg VC / MCCS MIMIC No. 166
Fuel Meter Screen – Gen. 1
VC / MCCS MIMIC No. 103
Fuel Meter Screen – Gen. 2
Fuel Meter Screen – Gen. 3
Fuel Meter Screen – Gen. 4
COCOS - Overview Pg. – Gen 1
COCOS Computer
COCOS - Overview Pg. – Gen 2
COCOS - Overview Pg. – Gen 3
COCOS - Overview Pg. – Gen 4
Throttle lever position 120 RPM
Prop speed reference [MCCS] 120 RPM
Prop speed measured [MCCS] 120 RPM
Shaft speed, indicated [MCCS] 120 RPM
Prop limit set pt [MCCS] 100%
Prop product limit [MCCS] 100%
Prop motor, MW to motor
(Indicated on Analog meter in
EOS)
22.524 MW
Prop motor, MW to motor
(Indicated on MCCS)
22.524 MW
Temp. torsion meter (shaft power after motor and bearing losses)
21.376 MW
MDG FULL POWER DESIGN
PARAMETER DESIGN MDG 1 MDG 2 MDG 3 MDG 4 SAT/UNSAT
Voltage [12] 6.6 kV ± 264 V
Current
(1&4/2&3) [12]
714 / 803 amps
Power
(1&4/2&3) [12]
8.16 / 9.18 MW
Frequency [12] 60 Hz
MVAR [12] 2.3-2.9 MVAR
5 of 9 SWBS TEST NO. 20001
TRANSFORMERS FULL POWER DESIGN
PARAMETER DESIGN 1A 1B 2A 2B SAT/UNSAT
Phase A temperature
[21, 31, 41, 51]
150-200 ºF
Phase B temperature
[21, 31, 41, 51]
150-200 ºF
Phase C temperature
[21, 31, 41, 51]
150-200 ºF
Transformer cold air temp.
No.1
[21, 31, 41, 51]
100-105 ºF
Transformer cold air temp.
No.2
[21, 31, 41, 51]
100-105 ºF
CONVERTERS FULL POWER DESIGN
PARAMETER DESIGN 1A 1B 2A 2B SAT/UNSAT
Voltage to converter
[61, 62]
2000-2030 V
Converter amperage
[61, 62]
2450-2500 A
Voltage from converter
[61, 62]
2070-2080 V
CONVERTERS/EXCITERS FULL POWER DESIGN
Voltage supply to exciter
[61, 62]
465-470 V
Voltage from exciter [61, 62]
195-200 V
Amperage from exciter [61, 62]
300-310 A
HARMONIC FILTERS FULL POWER DESIGN
PARAMETER DESIGN 1 2 SAT/UNSAT
Water temperature [14] 90-95 °F
6 of 9 SWBS TEST NO. 20001
PROPULSION MOTOR FULL POWER DESIGN
Phase A temp. [24, 34, 44, 54] 185-205 ºF
Phase B temp. [24, 34, 44, 54] 15-205 ºF
Phase C temp. [24, 34, 44, 54] 185-205 ºF
Port cold air temp. [24, 34, 44, 54] 105-115 ºF
Stbd cold air temp. [24, 34, 44, 54] 105-115 ºF
PARAMETER DESIGN STBD
FWD
STBD
AFT
PORT
FWD
PORT
AFT
SAT/UNSAT
LTFW to cooler (IR) [LOCAL] 85-90 ºF / / / / / / / /
LTFW from cooler [LOCAL] 85-95 ºF / / / / / / / /
Max FW temp rise across cooler 5 ºF / / / / / / / /
Air temp to motor air cooler (IR) 100-115 ºF / / / / / / / /
Air cooler air temp from motor air cooler (IR)
190-205 ºF / / / / / / / /
MDE HYDRAULIC SYSTEM FULL POWER DESIGN
PARAMETER DESIGN SET 1 SET 2 SET 3 AVERAGE SAT/
UNSAT
Motor D.E. bearing temp. [25] 120-130 ºF
D.E. lift pump hyd. press. [25] 720-730 PSIG
D.E. lift pump temp. [25] 100-110 ºF
Motor N.D.E. bearing temp. [25] 120-130 ºF
N.D.E. lift pump hyd. press. [25] 920-930 PSIG
N.D.E. lift pump temp. [25] 100-110 ºF
MDE LUBE OIL TEMPERATURE FULL POWER DESIGN
UNSAT
Motor D.E. Lube Oil Cooling Water temp. inlet (IR) [LOCAL]
85-95 ºF
Motor D.E. Lube Oil Cooling Water temp. outlet (IR) [LOCAL]
90-110 ºF
Motor N.D.E. Lube Oil Cooling
Water temp. inlet (IR) [LOCAL]
85-95 ºF
Motor N.D.E. Lube Oil Cooling
Water temp. outlet (IR) [LOCAL]
90-110 ºF
THRUST BEARING FULL POWER DESIGN
UNSAT
Thrust bearing oil temp. (IR)
[LOCAL]
120-130 ºF
Cooling water temp. inlet (IR)
[LOCAL]
90-100 ºF
Cooling water temp. outlet (IR)
[LOCAL]
90-100 ºF
7 of 9 SWBS TEST NO. 20001
LINE SHAFT BEARINGS FULL POWER DESIGN
UNSAT
Thrust bearing ahead pad temp. [166] 140-150 ºF
Thrust bearing astern pad temp. [166] 140-150 ºF
Thrust bearing journal temp. [166] 140-150 ºF
Thrust bearing oil temp. [166] 130-140 ºF
Line shaft bearing temp. [166] 110-120 ºF
FUEL SERVICE FULL POWER DESIGN
UNSAT
F.O. pump suction press.
[Pump Room]
5-25 PSIG
F.O. pump discharge press.
[Pump Room]
90-110 PSIG
LUBE OIL TEMPERATURE FULL POWER DESIGN
UNSAT
Port F.O. inlet temp to cooler
[at cooler]
80- 90 ºF
Port F.O. out temp from cooler
[at cooler]
80- 90 ºF
Port F.O return cooler LTFW out
[at cooler]
80- 90 ºF
Stbd F.O. inlet temp to cooler
[at cooler]
80- 90 ºF
Stbd F.O. out temp from cooler
[at cooler]
80- 90 ºF
Stbd F.O return cooler LTFW out
[at cooler]
80- 90 ºF
FUEL OIL CONSUMPTION FULL POWER
PARAMETER DESIGN MDG 1 MDG 2 MDG 3 MDG 4 SAT/UNSAT
Fuel Supply Meter (STOP) [MCCS]
Fuel Return Meter (STOP) [MCCS]
Meter Start Time
Fuel Supply Meter (START) [MCCS]
Fuel Return Meter (START) [MCCS]
Meter Stop Time
Fuel Consumption, kg/hr
8 of 9 SWBS TEST NO. 20001
COOLING WATER – CENTRAL SEA WATER
PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT
Suction pressure [at pump] 3-5 PSIG
Discharge pressure [at pump] 40-45 PSIG
High Sea Suction DP [suction inlet] 1.5 PSID
Low Sea Suction DP [suction inlet] 0.5 PSID
Sea Water temperature
COOLING WATER – L.T.F.W.
PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT
Suction pressure [at pump] 15-20 PSIG
Discharge pressure [at pump] 74-93 PSIG
L.T.F.W. temp to coolers [at cooler] 80-100 ºF
L.T.F.W. temp from coolers [at cooler] < 108 ºF
Final LT.F.W. temp outlet [at cooler] 70-90 ºF
S.W. temp to cooler (IR) [at cooler or at sea chest]
S.W. temp from cooler [at cooler] 70-90 ºF
COOLING WATER – H.T.F.W.
PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT
Suction pressure [at pump] 10-15 PSIG
Discharge pressure [at pump] ~64 PSIG
H.T.F.W. temp to coolers [at cooler] 80-100 ºF
H.T.F.W. temp from coolers [at cooler] 100-120 ºF
S.W. temp to cooler [at cooler]
S.W. temp from cooler [at cooler] 90-110 ºF
THIRD PARTY INSPECTOR
YES/NO 3RD PARTY INSPECTOR
(PRINT NAME)
EXAM TYPE
(e.g. monthly, annual, 36 month, etc.)
Was this a third party inspection?
COMMENTS (Inspector’s Command; Contact Info; etc.):
MAJOR DEFICIENCIES
Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.
Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.
DEFICIENT ITEM,
CONDITION OR
FUNCTION
IMPACT: (SAFETY,
REGULATION, MISSION,
OR MATERIAL READINESS)
POTENTIAL CAUSE RECOMMENDED
CORRECTIVE ACTION
OVERALL ASSESSMENT
OPERATOR (PRINT NAME) SIGNATURE
9 of 9 SWBS TEST NO. 20001
INSPECTOR (PRINT NAME) SIGNATURE SAT/UNSAT ACTION
INSPECTOR’S COMMENTS:
1 of 10 SWBS TEST NO. 30011
SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.
MCLEAN (T-AKE 12) ELECTRICAL PANEL INSPECTION
AND THERMOGRAPHY - LISTS
30011
REVISION DATE
05/02/2016
ASSESSMENT/
TEST DATE
ORGANIZATION PERFORMING
ASSESSMENT/TEST
SENIOR INSPECTOR
ABSTRACT: This test memo provides a list of electrical panels, load centers and switchboards to be inspected and thermographically surveyed during this visit. The thermographic component of this memo requires surveyed equipment to be operational and under load prior to and during the survey.
DOCUMENTATION (REFERENCES)
REFERENCE PUBLICATION NO. TITLE
A MIL-STD-2194 INFRARED THERMAL IMAGING SURVEY PROCEDURE FOR
ELECTRICAL EQUIPMENT
ASSOCIATED SWBS TESTS/INSPECTIONS
SWBS NUMBER SWBS TEST TITLE
20001 FULL POWER TRIAL FULL AHEAD
20303 MAIN PROPULSION ELECTRIC MOTOR
30104 EMERGENCY DIESEL GENERATOR
30401 PROPULSION TRANSFORMERS
30402 SHIP’S SERVICE TRANSFORMERS
30501 SHORE POWER CABLES AND BREAKERS
30701 ABT AND ELECTRICAL INTERLOCK
50501 PUMPS, MISCELLANEOUS
50801 STEERING GEAR
VESSEL REPAIR REQUESTS (VRR)
Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.
PARAMETER YES/NO EQPT: EQPT: EQPT:
Are there unresolved VRRs prior to testing? If “Yes,” list them.
VRR: VRR: VRR:
Were VRRs generated after testing? If “Yes,” list them.
VRR: VRR: VRR:
Do any of the above listed
VRRs limit operation? If
“Yes,” list them.
2 of 10 SWBS TEST NO. 30011
WARNING
SHIP’S ELECTRICAL SAFETY PROCEDURES
SHALL BE FOLLOWED AT ALL TIMES
LOCATION OF EQUIPMENT
Note 1: Perform thermal imaging survey per Reference A using below table for location of ship’s equipment.
Note 2: Coordinate survey with ship’s force and other SMART inspectors to minimize impact on equipment and personnel.
Note 3: Equipment to be surveyed shall be under normal loading conditions and in service for a minimum of ½ hour prior to being surveyed.
Note 4: List of all deficiencies identified during survey will be provided to SMART Team leader and ship for corrective action.
Note 5: Equipment not available for survey shall be listed with explanation as to why it was not available.
MODEL/NOMENCLATURE/TYPE LOCATION
E-POWER PANEL EP101 BRIDGE 07-58-1
BILGE/BALLAST PUMP NO1 AUX MACHINERY ROOM
BILGE / BALLAST PUMP NO2 AUX MACHINERY ROOM
CARGO HOLD OILY WASTE TRANSFER PUMP NO1 AUX MACHINERY ROOM
CARGO HOLD OILY WASTE TRANSFER PUMP NO2 AUX MACHINERY ROOM
DEWATERING PUMP NO1 AUX MACHINERY ROOM
DEWATERING PUMP NO2 AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO1 ABT ALT AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO1 ABT NORM AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO2 ABT (ALT) AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO2 ABT (NORM) AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO3 ABT (ALT) AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO3 ABT (NORM) AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO4 ABT (ALT) AUX MACHINERY ROOM
FIRE / SPRINKLING PUMP NO4 ABT (NORM) AUX MACHINERY ROOM
LT CHILLED WATER CIRC PUMP NO1 AUX MACHINERY ROOM
LT CHILLED WATER CIRC PUMP NO2 AUX MACHINERY ROOM
LT CHILLED WATER CIRC PUMP NO3 AUX MACHINERY ROOM
LT CHILLED WATER CIRC PUMP NO4 AUX MACHINERY ROOM
LT CHILLED WATER CIRC PUMP NO5 AUX MACHINERY ROOM
OILY WASTE TRANSFER PUMP NO1 AUX MACHINERY ROOM
OILY WASTE TRANSFER PUMP NO2 AUX MACHINERY ROOM
EMERGENCY FIRE PUMP NO1 CARGO & AUX PUMP ROOM
MAIN CARGO F-76 TRANSFER PUMP NO1 CARGO & AUX PUMP ROOM
MAIN CARGO F-76 TRANSFER PUMP NO2 CARGO & AUX PUMP ROOM
AFT FOAM CONCENTRATE PUMP FOAM ROOM
DIESEL FUEL SERVICE PUMP NO3 FUEL SERVICE ROOM
GAYLORD HOOD BOOSTER PUMP GALLEY
AUX DIESEL FUEL TRANSFER PUMP MAIN MACHINERY ROOM
CENT SW CLG PUMP NO1 MAIN MACHINERY ROOM
CENT SW CLG PUMP NO2 MAIN MACHINERY ROOM
CENT SW CLG PUMP NO3 MAIN MACHINERY ROOM
CENTRAL LT FW PUMP NO1 MAIN MACHINERY ROOM
CENTRAL LT FW PUMP NO3 MAIN MACHINERY ROOM
CENTRAL HT FW PUMP NO1 MAIN MACHINERY ROOM
CENTRAL HT FW PUMP NO2 MAIN MACHINERY ROOM
CENTRAL HT FW PUMP NO3 MAIN MACHINERY ROOM
CENTRAL LT FW PUMP NO2 MAIN MACHINERY ROOM
HT CHILLED WATER CIRC PUMP NO1 MAIN MACHINERY ROOM
HT CHILLED WATER CIRC PUMP NO2 MAIN MACHINERY ROOM
LUBE OIL TRANSFER PUMP NO1 MAIN MACHINERY ROOM
LUBE OIL TRANSFER PUMP NO2 MAIN MACHINERY ROOM
MAIN DIESEL FUEL TRANSFER PUMP MAIN MACHINERY ROOM
MAIN ENGINE 1 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM
MAIN ENGINE 2 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM
MAIN ENGINE 3 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM
3 of 10 SWBS TEST NO. 30011
MAIN ENGINE 4 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM
PROPULSION CONVERTER 1A DEIONIZED C/W
PUMP NO1
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION CONVERTER 1A DEIONIZED C/W
PUMP NO2
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION CONVERTER 1B DEIONIZED C/W
PUMP NO1
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION CONVERTER 1B DEIONIZED C/W
PUMP NO2
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1A COOLING FAN
NO1
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1A COOLING FAN
NO2
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1A COOLING FAN
NO3
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1A COOLING FAN
NO4
PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1B COOLING FAN NO1 PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1B COOLING FAN NO2 PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1B COOLING FAN NO3 PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION TRANSFORMER 1B COOLING FAN NO4 PROPULSION MOTOR EQUIPMENT ROOM NO1
PROPULSION CONVERTER 2A DEIONIZED C/W
PUMP NO1
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION CONVERTER 2A DEIONIZED C/W
PUMP NO2
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION CONVERTER 2B DEIONIZED C/W
PUMP NO1
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION CONVERTER 2B DEIONIZED C/W
PUMP NO2
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2A COOLING FAN
NO1
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2A COOLING FAN
NO2
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2A COOLING FAN
NO3
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2A COOLING FAN
NO4
PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2B COOLING FAN NO1 PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2B COOLING FAN NO2 PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2B COOLING FAN NO3 PROPULSION MOTOR EQUIPMENT ROOM NO2
PROPULSION TRANSFORMER 2B COOLING FAN NO4 PROPULSION MOTOR EQUIPMENT ROOM NO2
CARGO POTABLE WATER PUMP NO1 PROPULSION MOTOR ROOM
CARGO POTABLE WATER PUMP NO2 PROPULSION MOTOR ROOM
EMERGENCY FIRE PUMP NO2 PROPULSION MOTOR ROOM
PROPULSION MOTOR 1 COOLING FAN NO. 1 PROPULSION MOTOR ROOM
PROPULSION MOTOR 1 COOLING FAN NO. 2 PROPULSION MOTOR ROOM
PROPULSION MOTOR 1 COOLING FAN NO. 3 PROPULSION MOTOR ROOM
PROPULSION MOTOR 1 COOLING FAN NO. 4 PROPULSION MOTOR ROOM
PROPULSION MOTOR 2 COOLING FAN NO. 1 PROPULSION MOTOR ROOM
PROPULSION MOTOR 2 COOLING FAN NO. 2 PROPULSION MOTOR ROOM
PROPULSION MOTOR 2 COOLING FAN NO. 3 PROPULSION MOTOR ROOM
PROPULSION MOTOR 2 COOLING FAN NO. 4 PROPULSION MOTOR ROOM
DIESEL FUEL SERVICE PUMP NO1 PURIFIER ROOM
DIESEL FUEL SERVICE PUMP NO2 PURIFIER ROOM
FUEL OIL PURIFIER DO 1 PURIFIER ROOM
HAULING WINCH REPL PUMP STATION 1
HIGHLINE WINCH REPL PUMP STATION 1
HIGHLINE WINCH REPL PUMP STATION 2
4 of 10 SWBS TEST NO. 30011
STATION 2 HAULING WINCH REPL PUMP STATION 2
SPANWIRE REPL PUMP STATION 3
STATION 4 SPANWIRE REPL PUMP STATION 4
HAULING WINCH REPL PUMP STATION 5
HIGHLINE WINCH REPL PUMP STATION 5
STATION 6 HAULING WINCH REPL PUMP STATION 6
STATION 6 HIGHLINE WINCH REPL PUMP STATION 6
HAULING WINCH REPL PUMP STATION 8
HIGHLINE WINCH REPL PUMP STATION 8
STEERING GEAR MOTOR #2 STEERING GEAR ROOM
STEERING GEAR MOTOR NO1 STEERING GEAR ROOM
HOT WATER CIRC PUMP NO1 WATER HEATER SPACE
HOT WATER CIRC PUMP NO2 WATER HEATER SPACE
AUX CARGO F-44 TRANSFER PUMP 1 CARGO AND AUX PUMP RM, 5-35-0,
AUX CARGO F-44 TRANSFER PUMP 2 CARGO AND AUX PUMP RM, 5-35-0,
AUX CARGO F-76 TRANSFER PUMP CARGO AND AUX PUMP RM, 5-35-0,
AVIATION F-44 SERVICE PUMP 3-82.5-4 JP-5 PUMP RM
AVIATION F-44 STRIPPING PUMP
AVIATION F-44 TRANSFER PUMP 3-82.5-4 JP-5 PUMP RM
CARGO F-44 STRIPPING PUMP 4-38.5-0
CARGO F-76 STRIPPING PUMP 4-38.5-0
CARGO OCM SAMPLE PUMP
CARGO PUMP ROOM OILY WASTE TRANSFER PUMP CARGO PUMP RM 2-13-0
DEWATER/BALLAST PUMP NO1 CARGO & AUX PUMP RM
DIST PLANT METERING PUMP MN MCHRY RM 5-66-0
PROPULSION MOTOR DE JACKING PUMP NO. 1
PROPULSION MOTOR DE JACKING PUMP NO. 2
PROPULSION MOTOR NDE JACKING PUMP NO. 1
PROPULSION MOTOR NDE JACKING PUMP NO. 2
LIST OF MOTOR CONTROL CENTERS
EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION
A01 MCC A01 AUX. MACHINERY ROOM 5-58-1
A02 MCC A02 AUX. MACHINERY ROOM 5-58-1
F03 MCC F03 STA. 3 MOTOR CONTROL ROOM 01-49-1
F04 MCC F04 STA.4 MOTOR CONTROL ROOM 01-49-2
HV01 MCC HV01 FAN ROOM 07-62-4
HV02 MCC HV02 CTRL FAN ROOM 02-71-0
HV03 MCC HV03 FAN ROOM 03-71-0
M01 MCC M01 MAIN MACHINERY ROOM 5-67-1
M02 MCC M02 MAIN MACHINERY ROOM 5-67-1
M03 MCC M03 POT WTR / SS AIR COMP #2 ROOM 4-76-4
M04 MCC M04 PROPULSION MOTOR ROOM 4-76-0
M05 MCC M05 SEWAGE TREATMENT ROOM 3-75-6
M08 MCC M08 POT WTR / SS COMP #2 ROOM 4-76-4
M09 MCC M09 POT WTR / SS COMP #2 ROOM 4-76-4
M10 MCC M10 PROPULSION MOTOR EQUIPMENT ROOM
#1 3-75-1
M11 MCC M11 PROPULSION MOTOR EQUIPMENT ROOM
#1 3-75-1
M12 MCC M12 PROPULSION MOTOR EQUIPMENT ROOM
#1
M13 MCC M13 PROPULSION MOTOR EQUIPMENT ROOM
#1 3-75-1
M14 MCC M14 JP-5 PUMP ROOM 3-82.5-4
MV01 MCC MV01 ENGINE ROOM 10M LVL / 3-70-2
MV02 MCC MV02 ENGINE ROOM 10M LVL / 3-71-2
5 of 10 SWBS TEST NO. 30011
P01 MCC P01 CARGO & AUX PUMP ROOM
5-34-0 / 5-34-1
P02 MCC P02 CARGO & AUX PUMP ROOM
5-34-0 / 5-35-1
R01 MCC R01 STA. 1 MOTOR CONTROL ROOM 01-36-1
R02 MCC R02 STA. 2 MOTOR CONTROLLER ROOM 01-36-
R05 MCC R05 STA 5 MOTOR CONTROL ROOM
01-53.5-1
R06 MCC R06 STA 6 MOTOR CONTROL ROOM 01-54-2
R08 MCC R08 STA 8 MOTOR CONTROL ROOM
02-76-2
V01 MCC V01 ELECTRICAL SUBSTATION LC01 1-18-01
V03 MCC V03 ELECTRICAL SUBSTATION LC03 (2-39-1)
V04 MCC V04 ELECTRICAL SUBSTATION LC04 2-39-4
V05 MCC V05 FAN ROOM 02-32-0
V07 MCC V07 FAN ROOM 01-51.5-3
V08 MCC V08 FAN ROOM 01-51.5-4
V09 MCC V09 FAN ROOM 2-70-2
V10 MCC V10 AVIATION OFFICE 01-71-3
LIST OF ELECTRICAL SWITCHBOARDS
MODEL/NOMENCLATURE/TYPE LOCATION
MAIN SWBD 1 3-72-0
MAIN SWBD 2 3-72-0
EMERGENCY SWITCHBOARD 480V EDG ROOM 02-73-1
S/S SWBD 1 120V SECTION MAIN MACHINERY ROOM 3-66-1
MAIN SWBD 1 120V MINI BUS MAIN SWITCHBOARD
MAIN SWBD 2 120V MINI BUS MAIN SWITCHBOARD
S/S SWBD 2 120V SECTION EOS
SHIP'S SERVICE SWITCHBOARD 2 EOS
SHIP'S SERVICE SWITCHBOARD 1 EOS 3-66-2
LIST OF ELECTRICAL LOAD CENTERS
EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION
LC01 POWER SUBSTATION ELECTRICAL SUBSTATION LC01 (1-08-01)
LC02 POWER SUBSTATION ELECTRICAL SUBSTATION LC02 (1-33-2)
LC03 POWER SUBSTATION ELECTRICAL SUBSTATION LC03 (2-38-1)
LC04 POWER SUBSTATION ELECTRICAL SUBSTATION LC04 (2-38-2)
LC05 POWER SUBSTATION ELECTRICAL SUBSTATION LC05 (01-39.5-1)
LC06 POWER SUBSTATION ELECTRICAL SUBSTATION LC06 (01-39.5-2)
LC07 POWER SUBSTATION ELECTRICAL SUBSTATION LC07 (01-56-1)
LC08 POWER SUBSTATION ELECTRICAL SUBSTATION LC08 (01-56-2)
LC09 POWER SUBSTATION ELECTRICAL SUBSTATION LC09 (5-58-01)
LC10 POWER SUBSTATION ELECTRICAL SUBSTATION LC10 (5-58-01)
LC11 POWER SUBSTATION ELECTRICAL SUBSTATION LC11
LC12 POWER SUBSTATION ELECTRICAL SUBSTATION LC12 (5-58-01)
LIST OF ELECTRICAL PANELS
EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION
P101 120 VAC POWER DISTRIBUTION PANEL GALLEY 01-58-1
P102 120 VAC POWER DISTRIBUTION PANEL SCULLERY 01-62-5-1
P103 120 VAC POWER DISTRIBUTION PANEL CREW MESS 01-64-2
P104 120 VAC POWER DISTRIBUTION PANEL OFFICER MESS 01-61-2
P105 120 VAC POWER DISTRIBUTION PANEL AVIATION WORKSHOP 01-74-1
P106 120 VAC POWER DISTRIBUTION PANEL MATERIAL HANDLING EQUIPMENT
(MHE) 10 METER LEVEL 1-24-0
6 of 10 SWBS TEST NO. 30011
P107 120 VAC POWER DISTRIBUTION PANEL GENERAL MAINTENANCE
WORKSHOP 5-66-0
P108 120 VAC POWER DISTRIBUTION PANEL MAIN MACHINERY ROOM (MMR) 10
METER LEVEL 5-66-0
P109 120 VAC POWER DISTRIBUTION PANEL MMR 10 METER LEVEL VL (P) 5-66-0
P110 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-
60-0
P111 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 04-
60-0
P112 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 06-
60-0
P113 120 VAC POWER DISTRIBUTION PANEL NETWORK MANAGEMENT CENTER
07-62-0
P114 120 VAC POWER DISTRIBUTION PANEL NETWORK MANAGEMENT CENTER
07-62-0
P116 120 VAC POWER DISTRIBUTION PANEL STAIR TOWER 01
LEVEL 5-57-0
P117 120 VAC POWER DISTRIBUTION PANEL AUXILIARY MACHINERY ROOM
(AMR) 5-58-01
P118 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-
60-0
P119 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER
07-62-1
P120 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER
07-62-1
P121 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER
07-62-1
P203 120 VAC POWER DISTRIBUTION PANEL 01 AND 02 LEVEL AND
2ND DECK HEATING ELECTRICAL
SUBSTATION LC08 01-56-2
P205 120 VAC POWER DISTRIBUTION PANEL 02 LEVEL HEATING ELECTRICAL
EQUIPMENT ROOM 01-56-2
P206 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 03
LEVEL HEATING 03-60-0
P207 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 04
LEVEL HEATING 04-60-0
P208 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 05
LEVEL HEATING 05-60-0
P209 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM
06/07 LEVEL HEATING 06-60-0
P210 120 VAC POWER DISTRIBUTION PANEL MILDET CREW LAUNDRY 02-62-0
P211 120 VAC POWER DISTRIBUTION PANEL CIVILIAN CREW LAUNDRY 03-62-0
P212 120 VAC POWER DISTRIBUTION PANEL CIVILIAN CREW LAUNDRY 04-73.5-0
P213 120 VAC POWER DISTRIBUTION PANEL CPO LAUNDRY 05-62.5
P214 120 VAC POWER DISTRIBUTION PANEL OFFICER LAUNDRY 06-62-0
P215 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-
60-0
P401 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC02 1-
42-2
P402 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC05 01-
39.5-1
P403 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC06 01-
39.5-2
P404 480 VAC POWER DISTRIBUTION PANEL AMR 5-58-01
P405 480 VAC POWER DISTRIBUTION PANEL GALLEY 01-58-3
P406 480 VAC POWER DISTRIBUTION PANEL SCULLERY 01-62.5-1
P407 480 VAC POWER DISTRIBUTION PANEL ENGINEER’S WORKSHOP 4-69-1
P408 480 VAC POWER DISTRIBUTION PANEL MMR 2 METER LEVEL 5-66-0
7 of 10 SWBS TEST NO. 30011
P409 480 VAC POWER DISTRIBUTION PANEL MMR10 METER LEVEL 5-66-0
P410 480 VAC POWER DISTRIBUTION PANEL PURIFIER ROOM 4-70-2
P411 480 VAC POWER DISTRIBUTION PANEL PURIFIER ROOM 4-70-2
P412 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL
ELECTRIC EQUIPMENT ROOM 1-62-1
P413 480 VAC POWER DISTRIBUTION PANEL GENERAL MAINTENANCE
WORKSHOP 01-36-0
P414 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 03-
60-0
P415 480 VAC POWER DISTRIBUTION PANEL STAIR TOWER 3RD DECK 3-84.5-2
P416 480 VAC POWER DISTRIBUTION PANEL IC RADAR AND GYRO ROOM 07-61.5-
P417 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL
ELECTRIC SUBSTATION 01-56-1
P418 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL STAIR
TOWER 3RD DECK 3-84.5-2
P419 480 VAC POWER DISTRIBUTION PANEL STAIR TOWER MOTOR OPERATED
VALVE (MOV) 2ND DECK 3-66-2
P420A 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2
ND
DECK
5-39.5-2
P420B 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2
ND
DECK
5-39.5-2
P420C 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2
ND
DECK
5-39.5-2
P421 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 06-
60-0
P422 480 VAC POWER DISTRIBUTION PANEL SOLID WASTE PROCESSING ROOM
01-68.5-5
P423 480 VAC POWER DISTRIBUTION PANEL SHIP’S LAUNDRY 2-68.5-2
P424 480 VAC POWER DISTRIBUTION PANEL PROPULSION MOTOR ROOM 5-75-0
P425 480 VAC POWER DISTRIBUTION PANEL MMR HEATERS 5-58-01
P426 480 VAC POWER DISTRIBUTION PANEL AMR HEATERS AMR 5-58-01
EP101 120 VAC EMERGENCY POWER PANEL NAVIGATION BRIDGE 07-58-0
EP102 120 VAC EMERGENCY POWER PANEL EOS 3-66-02
EP103 120 VAC EMERGENCY POWER PANEL MAIN MACHINERY ROOM 6 METERS
ABL 5-66-0
EP105 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3
EP106 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC
RADAR AND GYRO ROOM 07-61.5-2
EP107 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC
RADAR AND GYRO ROOM 07-61.5-2
EP108 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3
EP109 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3
EP110 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC
RADAR AND GYRO ROOM 07-61.5-2
EP111 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3
EP403 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0
EP404 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0
EP405 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-48-0
EP406 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0
EP407 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2
EP408A 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0
EP408B 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0
EP409 480 VAC EMERGENCY POWER PANEL MMR 10 METER LEVEL FR 74P 5-66-0
EP411 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2
EP412 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2
EP413 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-57-0
8 of 10 SWBS TEST NO. 30011
EP414 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0
EP415 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 3-66-01
EP416 480 VAC EMERGENCY POWER PANEL IC RADAR AND GYRO ROOM
07-61.5-2
EP417 480 VAC EMERGENCY POWER PANEL HEATING/VENTILATION
/AIR CONDITIONING (HVAC) WATER
TIGHT CLOSURES
EP418 480 VAC EMERGENCY POWER PANEL HVAC WATER TIGHT CLOSURES
L100 120 VAC LIGHTING PANEL BOSUN LOCKER 1-K-0
L101 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 1-
34-2
L102 120 VAC LIGHTING PANEL ELECTRICAL SUBSTATION LC5 01-
39.5-1
L103 120 VAC LIGHTING PANEL STAIR TOWER 01 LEVEL 5-57-0
L104 120 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-58-0
L105 120 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-58-0
L106 120 VAC LIGHTING PANEL AUXILIARY MACHINERY ROOM 2
METER FLAT 5-58-01
L107 120 VAC LIGHTING PANEL STAIR TOWER 01 LEVEL 3-66-01
L108 120 VAC LIGHTING PANEL STAIR TOWER MAIN DECK
3-66-01
L109 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02
LEVEL 02-60-0
L110 120 VAC LIGHTING PANEL MMR 10.35 METER FLAT 5-66-0
L111 120 VAC LIGHTING PANEL MMR 6 METER FLAT 5-66-0
L112 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02-
60-0
L113 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02-
60-0
L114 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-
60-0
L115 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-
60-0
L116 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-
60-0
L117 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-
60-0
L118 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-
60-0
L119 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-
60-0
L120 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-
60-0
L121 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-
60-0
L122 120 VAC LIGHTING PANEL STAIR TOWER 07 LEVEL 01-61-2
L123 120 VAC LIGHTING PANEL STEERING GEAR ROOM 3-85-0
L124 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-
60-0
L125 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-
60-0
L126 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-
60-0
L127 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-
60-0
L401 480 VAC LIGHTING PANEL STAIR TOWER MAIN DECK 5-48-0
L402 480 VAC LIGHTING PANEL
L403 480 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-48-0
9 of 10 SWBS TEST NO. 30011
L404 480 VAC LIGHTING PANEL ELECTRICAL SUBSTATION
01-56-2
L405 480 VAC LIGHTING PANEL STAIR TOWER MAIN DECK
3-66-01
EL100 120 VAC EMERGENCY LIGHTING PANEL ELECTRICAL SUBSTATION LC2
1-24-2
EL101 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 5-48-0
EL102 120 VAC EMERGENCY LIGHTING PANEL
EL103 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 5-48-0
EL104 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 2ND DECK 5-57-0
EL105 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 01-61-2
EL106 120 VAC EMERGENCY LIGHTING PANEL MMR 10M METER FLAT 5-66-0
EL107 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 2ND DECK 3-66-01
EL108 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 02 LEVEL 2-67.5-0
EL109 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 04 LEVEL
2-67.5-0
EL110 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 06 LEVEL
2-67.5-0
EL111 120 VAC EMERGENCY LIGHTING PANEL AVIATION CONTROL STATION
02-77-2
VMS POWER PANEL VMS IC RADAR & GYRO ROOM, 07-61.5-2
PRE-OPERATIONAL CHECKLIST
PARAMETER YES/NO OBSERVATION
Nameplates installed?
Local Instrument?
Calibration?
Is preservation providing corrosion protection?
Any faults or alarms noted?
THERMOGRAPHIC SURVEY
Instructions: Perform Thermographic survey of equipment listed in Table above. In the observed column provide amplification regarding any findings or discrepancies identified during survey. If any single surveyed item does not meet the design value indicate “UNSAT”. Make as many copies of this page as necessary prior to filling in.
PARAMETER DESIGN OBSERVED SAT/UNSAT
Electrical connections Mechanically tight
Electrical connections Clean and free of corrosion
Fasteners Proper material and size
Connections Properly insulated as applicable
Insulation Good condition, intact and free of visible damage
ELECTRICAL PANEL INSPECTION
Instructions: Ensure electrical panels listed in above Equipment Location table meet the following parameters. In the Observed column, provide amplification regarding any findings or discrepancies. If any one single location observed value does not meet the design value, indicate “UNSAT”. Make as many copies of these pages as necessary prior to filling in.
PARAMETER DESIGN OBSERVED SAT/UNSAT
Circuit Label plates Installed
Breakers rating Matches label plate
Connecting bars ( gang bar) Properly installed on multiphase breakers
10 of 10 SWBS TEST NO. 30011
Panel Clean, no signs of water intrusion, dirt, rust or mechanical failure
Proper cable penetration devices Installed (watertight tubes installed on watertight or drip proof enclosures)
All cable penetrations Tight, no empty tubes left unpacked
All cables Properly installed, cable outer insulation/cable jacket well within panel
All breakers Properly installed and functional
All cover screws and fasteners Properly installed
Electrical cables Good physical condition, insulation is not cracked, cut, damaged or showing signs of overheating
EXAM TYPE
(e.g. monthly, annual, 36 month, etc.)
Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.
Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.
DEFICIENT ITEM,
CONDITION OR
FUNCTION
IMPACT: (SAFETY,
REGULATION, MISSION,
OR MATERIAL READINESS)
1 of 10 SWBS TEST NO. 50102
SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.
MCLEAN (T-AKE 12) A/C CHILL WATER UNITS 50102
ORGANIZATION PERFORMING
ASSESSMENT/TEST
ABSTRACT: This test memo assesses the condition and operation of A/C Chill Water Units. This test memo can be performed concurrent with Test Memo 50103.
DOCUMENTATION (REFERENCES)
REFERENCE PUBLICATION NO. TITLE
A T9516-BB-MMC-010 REFRIGERATION PLANT, AIR CONDITIONING
B MSC 514-7488755 SRD: A/C CHILLED WATER SYSTEM DIAGRAM
ASSOCIATED SWBS TESTS/INSPECTIONS
SWBS NUMBER SWBS TEST TITLE
50103 AIR CONDITIONING CHILL WATER PUMPS
Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.
PARAMETER YES/NO EQPT: EQPT: EQPT:
Are there unresolved VRRs prior to testing? If “Yes,” list them.
VRR: VRR: VRR:
Were VRRs generated after testing? If “Yes,” list them.
VRR: VRR: VRR:
Do any of the above listed
VRRs limit operation? If
“Yes,” list them.
LOCATION OF EQUIPMENT
EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION
NOS. 1 THRU 4 A/C CHILL WATER UNITS AMR 5-58-1
PRE-OPERATIONAL CHECKLIST
PARAMETER YES/NO OBSERVATION
Nameplates installed?
2 of 10 SWBS TEST NO. 50102
Local instrument?
Calibration?
Is preservation providing corrosion protection?
Any faults or alarms noted?
MATERIAL INSPECTION
PARAMETER DESIGN
OBSERVED
DESIGN
OBSERVED
DESIGN
OBSERVED
DESIGN
OBSERVED
SAT/UNSAT
AC 4 (NO. 1) AC 5 (NO. 2) AC 6 (NO. 3) AC 7 (NO. 4)
Flange shields No leaks No leaks No leaks No leaks
Piping No leaks No leaks No leaks No leaks
Insulation Intact Intact Intact Intact
Labeling Legible Legible Legible Legible
Gauges Legible Legible Legible Legible
Foundation Not damaged
Not damaged
Not damaged
Not damaged
SAFETY DEVICES AND CONTROLS
Instructions: Use the applicable note(s) below to complete testing. All software set points for each unit to be verified.
Notes:
(1) Denotes testing to be performed for all units. (Random testing will be performed for remaining devices.)
(2) Where a hot pot is indicated but unavailable for testing, the device may be demonstrated by opening the device contacts. Verify hot pot calibration: (Calibration Due Date)
(3) Electronic trips are conducted by changing the set point in the software. Ensure original set point is restored after trip is demonstrated.
(4) Set points for all devices to be verified by checking software.
PARAMETER ALARM
MESSAGE
PARAMETER
ON MIMIC
DESIGN AC 4
(NO. 1)
AC 5
(NO. 2)
AC 6
(NO. 3)
AC 7
(NO. 4)
SAT/
UNSAT
Unit will not start with
Control Panel
Door open
(1)(4)
External stop N/A Unit should not start
Local
Emergency
Stop
(Compressor stops) (1)(4)
ESTOP N/A CCU Control
Panel (CCU)
Local
Emergency
Stop
(Compressor stops) (1)(4)
ESTOP N/A Compressor
Starter (CS)
High Press
Monitor Cut-
Out, Electronic
(1) (3) (4)
High condensing pressure
Discharge
Saturated
122º F +/-
1.8º
(50º C +/-1º)
High Press
Out, Mechanical (1)
(4)
High discharge pressostat
Discharge
Saturated
124.9º F-
127.4º F
(51.6º C-53º
C)
191.PSIG
+0/-8
3 of 10 SWBS TEST NO. 50102
(13.2bar +0/-
0.5)
Low Press
Monitor Cut-
Out, Electronic
(3) (4)
LOW EVAP
TEMP
Evaporating
Saturated
15.8º F +/-2º
Low Press
Out, Mechanical (1)
(4)
LOW
SUCTION
PRESSOSTA
T
Evaporating
Saturated
9º F -11.5° F
(-12.8 to -
11.4ºC)
11.6 PSIG
+1.5/-0 (0.8 bar +0.1/-0)
Discharge Gas
Superheat
Monitor, Liquid
Chiller Stops
(1) (3) (4)
LOW
DISCHARG
E
SUPERHEA
T
Superheat >59º F +/-2º
(>15º C +/-
1º)
Discharge Gas
Temp., Electronic Trip
(3) (4)
HIGH
DISCHARG
E TEMP.
Discharge Gas 176º F +0º/-
5.4º (80º C
+0º/-3º)
High Discharge
Gas Temp, Mechanical
Trip (Need Hot
Pot) (1) (2) (4)
HIGH
DISCHARG
E TEMP.
Discharge Gas 212º F +0º/-
6º (100º C
Low Oil
Pressure Trip
PT03=Oil Press
PT01=Disch
Press (1) (3)
(4)
LUBRICATI
ON OIL
FAILURE
Oil Pressure PT03-PT01
<1 bar &
PT03 <18
bar, or PT03-
PT01 >5 bar
& PT03<18
bar
Chilled Water
Outlet Temp
Alarm (3) (4)
LOW
ALARM
N/A >41ºF
(>5 ºC)
Inlet High
Temp Alarm
(3) (4)
HIGH
ALARM
N/A 68ºF +0º/-
1.8º (20ºC
+0º/-1º)
Inlet Low
Temp Alarm
(3) (4)
LOW
ALARM
N/A 39.2ºF
+1.8º/-0º
(4ºC +1º/-0º)
Low Oil Temp
Start Block
(1) (3) (4)
START NOT
ALLOWED
LOW OIL
TEMP
OIL 32ºF-86ºF
Disch Gas
Temp., Electronic
Alarm (3) (4)
HIGH
ALARM
Discharge Gas 167ºF +0º/-
5.4º (75ºC
Condenser
Water Inlet
High Temp
Alarm (3) (4)
HIGH
ALARM
N/A 105.8ºF
+1.8º/-3.6º
(41ºC +1º/-
2º)
Condenser
Water Outlet
High Temp
HIGH
ALARM
N/A 111ºF
(44ºC)
4 of 10 SWBS TEST NO. 50102
Alarm
(3) (4)
Condenser
Water Outlet
Low Temp
Alarm
(3) (4)
LOW
ALARM
N/A 66.2ºF
Oil Reservoir
Heater Operates while on
Standby
(3) (4)
N/A OIL MIN 86°F
(30°C)
A/C Plant does not start w/o
Condenser
Cooling Water
Flow (1) (4)
NO CW
FLOW
N/A Operates as intended
A/C Plant shuts down when
Condenser
Cooling Water stops (1) (4)
START NOT
ALLOWED
NO COND
FLOW
A/C Plant shuts down when
Chill Water
Flow to the
Evaporator stops (1) (4)
NOT
ENOUGH
FLOW
EVAP
A/C Chill
Water Pump
Interlock stops plant startup w/o Chill Water flow to
Evaporator
(1)(4)
START NOT
ALLOWED
NO EVAP
FLOW
Check status of
R134A
Refrigerant leak detection
(1) (4)
N/A N/A Bilge Sensors operate as
Check status of
R134A
Refrigerant leak detection
(1) (4)
N/A N/A Console indicates as
Demonstrate operation of
Manual
Capacity
Increase/Decrea se Controls on
Control Cabinet and on top of
Compressor
(1) (4)
N/A CAPACITY Operates as intended on increase and decrease
Summary
Alarm at
N/A N/A Summary alarm
5 of 10 SWBS TEST NO. 50102
MCCS
(1) (4) indicates as
OPERATING DATA
PARAMETER INDICATION DESIGN AC 4
(NO. 1)
AC 5
(NO. 2)
AC 6
(NO. 3)
AC 7
(NO. 4)
Load AC/MIMIC
Suction Pressure LOCAL 30-40 psig
Suction Temperature AC/MIMIC 45-55 ºF
Suction Superheat AC/MIMIC 10-15 ºF
Discharge Pressure LOCAL 85-95 psig
Discharge Temperature AC/MIMIC 145-155 ºF
Discharge Superheat AC/MIMIC 45-55 ºF
Refrigerant Temperature at TXV LOCAL (IR)
Oil Pressure AC/MIMIC 110-140 psig
Oil Temperature AC/MIMIC 145-155 ºF
Oil Differential Pressure AC/MIMIC 5-7 psi
Oil Level LOCAL SAT
Oil Flow LOCAL SAT
LTFW Temperature to Condenser AC/MIMIC 80-90 ºF
LTFW Temperature from
Condenser
AC/MIMIC 85-95 ºF
LTCW Inlet Pressure LOCAL 90-110 psig
LTCW Temperature to Evaporator AC/MIMIC 50-60 ºF
LTCW Water Temp from
Evaporator
AC/MIMIC 45-55 ºF
LTCW Outlet Pressure LOCAL 90-110 psig
Refrigerant Level LOCAL 6-9 in.
Motor Free End Bearing Oil Level LOCAL SAT
Motor Comp End Bearing Oil
Level
LOCAL SAT
EXAM TYPE
(e.g. monthly, annual, 36 month, etc.)
Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.
Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.
DEFICIENT ITEM,
CONDITION OR
FUNCTION
IMPACT: (SAFETY,
REGULATION, MISSION,
OR MATERIAL READINESS)
6 of 10 SWBS TEST NO. 50102
7 of 10 SWBS TEST NO. 50102
Figure 1. CHILL WATER SYSTEM
8 of 10 SWBS TEST NO. 50102
CHART 1 REFRIGERANT LOW TEMPERATURE DATA - PRESSURE CHART
9 of 10 SWBS TEST NO. 50102
CHART 2 REFRIGERANT LOW TEMPERATURE DATA – PRESSURE CHART
10 of 10 SWBS TEST NO. 50102
Figure 2. MIMIC PRINT SCREEN
1 of 3 SWBS TEST NO. 80206
SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.
MCLEAN (T-AKE 12) PULPER 80206
ORGANIZATION PERFORMING
ASSESSMENT/TEST
ABSTRACT: This test memo assesses the condition and operation of the pulper. This test memo requires the pulper to be operated at sea.
DOCUMENTATION (REFERENCES)
REFERENCE PUBLICATION NO. TITLE
A S9593-C2-MMM-010 PULPER, LARGE NS DWG 593-6960300
B
ASSOCIATED SWBS TESTS/INSPECTIONS
SWBS NUMBER SWBS TEST TITLE
Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.
PARAMETER YES/NO EQPT: EQPT: EQPT:
Are there unresolved VRRs prior to testing? If “Yes,” list them.
VRR: VRR: VRR:
Were VRRs generated after testing? If “Yes,” list them.
VRR: VRR: VRR:
Do any of the above listed
VRRs limit operation? If
“Yes,” list them.
PULPER CHECKS
GENERAL CHECKS
PARAMETER DESIGN OBSERVED SAT/UNSAT
Are operating placards posted on equipment
MARPOL 73/78 Annex V placard is posted nearby equipment
Is use of unit prevented in port? Signs posted to prevent use in port
Unit cleanliness Clean and good condition
2 of 3 SWBS TEST NO. 80206
Preservation Good condition
SAFETY DEVICES CHECKS
LOCAL STATUS INDICATOR
PARAMETER DESIGN OBSERVED SAT/UNSAT
“Don’t feed” red indicator light Operational
“Wait” amber indicator light Operational
“Feed” green indicator light Operational
Emergency stop push button Operational
Large pulper local status indicator Operational
MESSAGE DISPLAY UNIT:
Function status and control keys Operational
ELECTRICAL CONTROL ENCLOSURE:
Hours meter Operational
Timed start push button Operational
Timed stop push button Operational
Alarm acknowledge push button Operational
Emergency stop push button Operational
Audible alarm Operational
Motor current ammeter Operational
Power on white indicator Operational
Gauges Operational
OPERATION – AT SEA ONLY
PARAMETER DESIGN OBSERVED SAT/UNSAT
Pulper Processes 83.3 lbs of food waste in 5 minutes or less (999.6 lbs per hour)
Pulper Processes a 200 lb mix (100 lbs of food waste) in 20 minutes or less
Shutdown of pulper upon loss of firemain Verify
EXAM TYPE
(e.g. monthly, annual, 36 month, etc.)
Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.
Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.
DEFICIENT ITEM,
CONDITION OR
FUNCTION
IMPACT: (SAFETY,
REGULATION, MISSION,
OR MATERIAL READINESS)
3 of 3 SWBS TEST NO. 80206
File details come from the government source that posted it.