ATTACHMENT_II_-_SMART_Test_Plan_Format.pdf

PDF 2 MB Posted

Attached to
Ship Inspection & Engineering Services
Solicitation number
N3220518R0055
Issued by

About this file

SMART Test Plan Format

View the file

Other files

File Type Posted
N3220518R0055U0006_FINAL.pdf PDF
N3220518R0055U0006.pdf PDF
Attachment_VIII_-_Pricing_Spreadsheet_-_Amendment_0005.xls XLS spreadsheet
N3220518R0055U0005.pdf PDF
N3220518R0055U0004.pdf PDF
Attachment_VIII_-_Pricing_Spreadsheet_REV_1.xls XLS spreadsheet
Amendment_0003.docx DOCX document
N3220518R0055U0002.pdf PDF
N3220518R0055U0001.pdf PDF
N3220518R0055.pdf PDF
ATTACHMENT_VII_-_QASP.pdf PDF
ATTACHMENT_IV_-_Past_Performance_Data_Sheet.pdf PDF
Exhibit_A_-_CDRLs.pdf PDF
ATTACHMENT_III_-_Sample_Tasks.pdf PDF
ATTACHMENT_IX_-_DD_254.pdf PDF
N3220518R0055.pdf PDF
ATTACHMENT_VIII_-_Pricing_Spreadsheet.xls XLS spreadsheet
ATTACHMENT_I_-_Sample_SMS-IA_Assessment_Report.pdf PDF
ATTACHMENT_V_-_Past_Performance_Questionnaire.pdf PDF
ATTACHMENT_VI_-_NDA.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 of 9 SWBS TEST NO. 20001

SHIP MATERIAL ASSESSMENT & READINESS TESTING

SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.

MCLEAN (T-AKE 12) FULL POWER TRIAL FULL AHEAD 20001

REVISION DATE

05/02/2016

ASSESSMENT/

TEST DATE

ORGANIZATION PERFORMING

ASSESSMENT/TEST

SENIOR INSPECTOR

(PRINT NAME)

ABSTRACT: This test memo records and assesses numerous system and component operating parameters while underway with the ship making full ahead power for one hour. Readings of parameters are obtained in 20-minute intervals.

DOCUMENTATION (REFERENCES)

REFERENCE PUBLICATION NO. TITLE

A T9233-CF-IMC-010 DIESEL ENGINES, MAIN POWER GENERATION MODELS 9L 48/60

AND 8L 48/60 VOLUME B1, ENGINE OPERATING INSTRUCTIONS

B T9235-AN-MMC-010 T-AKE PROPULSION CONTROL SYSTEM

C T9AKE-AA-MAN-010 ENGINEER’S OPERATING MANUAL VOLUME 1

D T9AKE-AA-MAN-020 ENGINEER’S OPERATING MANUAL VOLUME 2

E MSC 310-7488776 ELECTRIC POWER LOAD ANALYSIS

ASSOCIATED SWBS TESTS/INSPECTIONS

SWBS NUMBER SWBS TEST TITLE

20002 FULL POWER TRIAL FULL ASTERN

20301 DIESEL GENERATOR 80% LOAD TEST

20302 DIESEL GENERATOR BLACKOUT RECOVERY (PRE-UNDERWAY)

20303 MAIN PROPULSION ELECTRIC MOTOR

20204 MAIN PROPULSION - DIESEL AUTOMATION

20205 MAIN PROPULSION - DIESEL LUBE OIL SYSTEM

20206 MAIN PROPULSION - DIESEL FUEL OIL SYSTEM

20207 MAIN PROPULSION - DIESEL COOLING WATER SYSTEMS

30011 ELECTRICAL PANEL INSPECTION AND THERMOGRAPHY - LISTS

30104 EMERGENCY DIESEL GENERATOR

30401 PROPULSION TRANSFORMERS

30404 SYNCH COMPENSATORS & STATIC FREQ CONVERTERS

30405 POWER COVERSION EQUIPMENT HARMONIC FILTERS

30701 ABT AND ELECTRICAL INTERLOCK

COMMENTS:

VESSEL REPAIR REQUESTS (VRR)

Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.

PARAMETER YES/NO EQPT: EQPT: EQPT:

Are there unresolved VRRs prior to testing? If “Yes,” list them.

VRR: VRR: VRR:

Were VRRs generated after testing? If “Yes,” list them.

VRR: VRR: VRR:

Do any of the above listed

VRRs limit operation? If

“Yes,” list them.

VRR: VRR: VRR:

ATTACHMENT II

2 of 9 SWBS TEST NO. 20001

COMMENTS:

SPECIAL INSTRUCTIONS

No condition should be present that would prevent safe operation of the machinery. Before getting underway 50% of all machinery must be cleared unless a waiver is obtained from the Commander and SMART Coordinator. All necessary safety, pre-underway or pre-operating checks must have been performed before beginning this demonstration. Equipment on-line during Full Power Trial.

PARAMETER QTY IN USE,

REQUIRED

QYT IN USE,

OBSERVED

REFERENCE

NOTE NO.

SAT/UNSAT

Propulsion Motor (at MCR) 2 (in tandem)

Propulsion Motor Bearing Jacking Pumps 2

Propulsion Transformer 4

Propulsion Frequency Converters 4

Propulsion Motor Exciters 2

SS/Distribution Transformer 2

Harmonic Filters 2

Main Diesel Generator Sets 4

MDG L.O. Purifiers, incl. feed pumps and heaters 4

MDG Lube Oil Cooler 4

Distilling Plant 1

Distiller Feed Pump 1

Distiller Distillate Pump 1

Proportioning Brominator 1

Recirculating Brominator 1

MDG Fuel Service Pump 2

Fuel Purifiers, incl. feed pumps and heaters 1

Central Seawater Cooling Pump 2

Central LT F.W. Cooling Pump 2

Central LT F.W. Cooler 2

MDG HT F.W. Cooling Pump 2

MDG HT F.W. Cooler 2

MDG HT Cooling Water Pre-Heater Units 2 1

Emergency Fire Pump 1

Starting Air Compressor 2 1

Ship Service / Control Air Compressor 2 1

Control Air Dehydrator 2

Cargo Refrigeration Control Air Dehydrator 1

EOS A/C Unit 2

Main A/C Plants 4

Cargo Refrigeration Plants 2

Brine Refrigeration Plants 2

Potable Water Pump 3 1

Hot Water Circ Pump 2

PARAMETER QTY IN USE,

REQUIRED

QYT IN USE,

OBSERVED

REFERENCE

NOTE NO.

SAT/UNSAT

Potable Water Heater 3

Machinery Rooms Bilge Housekeeping Pumps 2 1

Cargo Hold Bilge Housekeeping Pumps 2 1

Cargo Pump Room Bilge Housekeeping Pumps 2 1

Main Machinery Room Port Supply Fans 1

Main Machinery Room Stbd Supply Fans 1

Exhaust Fans, Main Machinery Room 1

Supply Fans, Propulsion Motor Room 2

Exhaust Fans, Propulsion Motor Room 2

Supply Fans, Aux. Machinery Room 2

Exhaust Fans, Aux. Machinery Room 2

Purifier Room Exhaust Fan 1

Engineer’s Workshop Supply Fan 1

3 of 9 SWBS TEST NO. 20001

Purifier Room, Elec Workshop & EOS Supply Fan 1

Ship Service Refrigeration Plants 1

Marine Sanitation Device (incl. pumps and compressor)

Accommodation Air Handling Unit 4

Misc. Ventilation Fans and Heaters 4

NOTES:

1. Under automatic control.

2. The electrical load is to be adjusted to the extent that each genset is loaded to approximately 32,341 kW total connected load, to simulate the design full propulsion power summer condition.

3. Full propulsion power is defined as the rated 22,524 kW combined output power of the tandem Propulsion Motors.

Design shaft speed is 120 rpm.

4. Fans, heaters and air handling units for miscellaneous accommodation and machinery spaces are to be aligned in accordance with that listed in MSC Dwg No. 310-7488776, Electric Load Analysis, under the “Transit 20 Knot” operating condition.

FULL POWER TRIAL - (BRIDGE AND DRAFT DATA)

Instructions: Record data every 20 minutes during Full Power Trial.

PARAMETER DESIGN SET 1

OBSERVED

SET 2

OBSERVED

SET 3

OBSERVED

SAT/UNSAT

Time

Barometric pres., mbar

Air temperature, °F

Speed through water, knots

Speed over ground, knots

Ship’s heading true °

Relative wind speed, knots

Relative wind direction, °

Wave height, ft

Relative wave direction, °

Swell height, ft

Relative swell direction, °

Water depth, ft

Prop RPM, Bridge tachometer 120 RPM

Forward, ft

Aft, ft

Mean, ft

Displacement, long tons 40,880

FULL POWER TRIAL DATA – (EOS CONSOLE)

Instructions: Print three sets of the following Mimic screens in 20 minute intervals. Use table below to help keep track of printing. If printer is down, photos should be taken of the Mimic screens; enter photo # in the cells below. Average the results and enter the data in the corresponding boxes. Source locations for data are shown in brackets [ ]. Number values = corresponding MCCS MIMIC. PC = Propulsion

Control Screen. VC = Vessel Control Screen.

MIMIC SCREEN NAME

MIMIC LOCATION FULL POWER SAT/

UNSAT SET 1 SET 2 SET 3

Gen. 1 Loading & Control

VC / MCCS MIMIC No. 12

Gen. 2 Loading & Control

Gen. 3 Loading & Control

Gen. 4 Loading & Control

Diesel Engine No. 1 F-1 / MCCS MIMIC No. 1

Diesel Engine No. 2 F-2 / MCCS MIMIC No. 2

4 of 9 SWBS TEST NO. 20001

Diesel Engine No. 3 F-3 / MCCS MIMIC No. 3

Diesel Engine No. 4 F-4 / MCCS MIMIC No. 4

Diesel Engine Exhaust Gas VC / MCCS MIMC No. 16

Generator 1 VC / MCCS MIMIC No. 5

Generator 2 VC / MCCS MIMIC No. 6

Generator 3 VC / MCCS MIMIC No. 7

Generator 4 VC / MCCS MIMIC No. 8

Transformer 1A VC / MCCS MIMIC No. 51

Transformer 1B PC / MCCS MIMIC No. 41

Transformer 2A PC / MCCS MIMIC No. 31

Transformer 2B PC / MCCS MIMIC No. 21

Converter 1A / 1B PC / MCCS MIMIC No. 62

Converter 2A / 2B PC / MCCS MIMIC No. 61

Harmonic filters VC / MCCS MIMIC No. 14

Propulsion Motor 1A PC / MCCS MIMIC No. 54

Propulsion Motor 1B PC / MCCS MIMIC No. 44

Propulsion Motor 2A PC / MCCS MIMIC No. 34

Propulsion Motor 2B PC / MCCS MIMIC No. 24

Motor shaft PC / MCCS MIMIC No. 25

Bow thruster & line shaft brg VC / MCCS MIMIC No. 166

Fuel Meter Screen – Gen. 1

VC / MCCS MIMIC No. 103

Fuel Meter Screen – Gen. 2

Fuel Meter Screen – Gen. 3

Fuel Meter Screen – Gen. 4

COCOS - Overview Pg. – Gen 1

COCOS Computer

COCOS - Overview Pg. – Gen 2

COCOS - Overview Pg. – Gen 3

COCOS - Overview Pg. – Gen 4

Throttle lever position 120 RPM

Prop speed reference [MCCS] 120 RPM

Prop speed measured [MCCS] 120 RPM

Shaft speed, indicated [MCCS] 120 RPM

Prop limit set pt [MCCS] 100%

Prop product limit [MCCS] 100%

Prop motor, MW to motor

(Indicated on Analog meter in

EOS)

22.524 MW

Prop motor, MW to motor

(Indicated on MCCS)

22.524 MW

Temp. torsion meter (shaft power after motor and bearing losses)

21.376 MW

MDG FULL POWER DESIGN

PARAMETER DESIGN MDG 1 MDG 2 MDG 3 MDG 4 SAT/UNSAT

Voltage [12] 6.6 kV ± 264 V

Current

(1&4/2&3) [12]

714 / 803 amps

Power

(1&4/2&3) [12]

8.16 / 9.18 MW

Frequency [12] 60 Hz

MVAR [12] 2.3-2.9 MVAR

5 of 9 SWBS TEST NO. 20001

TRANSFORMERS FULL POWER DESIGN

PARAMETER DESIGN 1A 1B 2A 2B SAT/UNSAT

Phase A temperature

[21, 31, 41, 51]

150-200 ºF

Phase B temperature

[21, 31, 41, 51]

150-200 ºF

Phase C temperature

[21, 31, 41, 51]

150-200 ºF

Transformer cold air temp.

No.1

[21, 31, 41, 51]

100-105 ºF

Transformer cold air temp.

No.2

[21, 31, 41, 51]

100-105 ºF

CONVERTERS FULL POWER DESIGN

PARAMETER DESIGN 1A 1B 2A 2B SAT/UNSAT

Voltage to converter

[61, 62]

2000-2030 V

Converter amperage

[61, 62]

2450-2500 A

Voltage from converter

[61, 62]

2070-2080 V

CONVERTERS/EXCITERS FULL POWER DESIGN

Voltage supply to exciter

[61, 62]

465-470 V

Voltage from exciter [61, 62]

195-200 V

Amperage from exciter [61, 62]

300-310 A

HARMONIC FILTERS FULL POWER DESIGN

PARAMETER DESIGN 1 2 SAT/UNSAT

Water temperature [14] 90-95 °F

6 of 9 SWBS TEST NO. 20001

PROPULSION MOTOR FULL POWER DESIGN

Phase A temp. [24, 34, 44, 54] 185-205 ºF

Phase B temp. [24, 34, 44, 54] 15-205 ºF

Phase C temp. [24, 34, 44, 54] 185-205 ºF

Port cold air temp. [24, 34, 44, 54] 105-115 ºF

Stbd cold air temp. [24, 34, 44, 54] 105-115 ºF

PARAMETER DESIGN STBD

FWD

STBD

AFT

PORT

FWD

PORT

AFT

SAT/UNSAT

LTFW to cooler (IR) [LOCAL] 85-90 ºF / / / / / / / /

LTFW from cooler [LOCAL] 85-95 ºF / / / / / / / /

Max FW temp rise across cooler 5 ºF / / / / / / / /

Air temp to motor air cooler (IR) 100-115 ºF / / / / / / / /

Air cooler air temp from motor air cooler (IR)

190-205 ºF / / / / / / / /

MDE HYDRAULIC SYSTEM FULL POWER DESIGN

PARAMETER DESIGN SET 1 SET 2 SET 3 AVERAGE SAT/

UNSAT

Motor D.E. bearing temp. [25] 120-130 ºF

D.E. lift pump hyd. press. [25] 720-730 PSIG

D.E. lift pump temp. [25] 100-110 ºF

Motor N.D.E. bearing temp. [25] 120-130 ºF

N.D.E. lift pump hyd. press. [25] 920-930 PSIG

N.D.E. lift pump temp. [25] 100-110 ºF

MDE LUBE OIL TEMPERATURE FULL POWER DESIGN

UNSAT

Motor D.E. Lube Oil Cooling Water temp. inlet (IR) [LOCAL]

85-95 ºF

Motor D.E. Lube Oil Cooling Water temp. outlet (IR) [LOCAL]

90-110 ºF

Motor N.D.E. Lube Oil Cooling

Water temp. inlet (IR) [LOCAL]

85-95 ºF

Motor N.D.E. Lube Oil Cooling

Water temp. outlet (IR) [LOCAL]

90-110 ºF

THRUST BEARING FULL POWER DESIGN

UNSAT

Thrust bearing oil temp. (IR)

[LOCAL]

120-130 ºF

Cooling water temp. inlet (IR)

[LOCAL]

90-100 ºF

Cooling water temp. outlet (IR)

[LOCAL]

90-100 ºF

7 of 9 SWBS TEST NO. 20001

LINE SHAFT BEARINGS FULL POWER DESIGN

UNSAT

Thrust bearing ahead pad temp. [166] 140-150 ºF

Thrust bearing astern pad temp. [166] 140-150 ºF

Thrust bearing journal temp. [166] 140-150 ºF

Thrust bearing oil temp. [166] 130-140 ºF

Line shaft bearing temp. [166] 110-120 ºF

FUEL SERVICE FULL POWER DESIGN

UNSAT

F.O. pump suction press.

[Pump Room]

5-25 PSIG

F.O. pump discharge press.

[Pump Room]

90-110 PSIG

LUBE OIL TEMPERATURE FULL POWER DESIGN

UNSAT

Port F.O. inlet temp to cooler

[at cooler]

80- 90 ºF

Port F.O. out temp from cooler

[at cooler]

80- 90 ºF

Port F.O return cooler LTFW out

[at cooler]

80- 90 ºF

Stbd F.O. inlet temp to cooler

[at cooler]

80- 90 ºF

Stbd F.O. out temp from cooler

[at cooler]

80- 90 ºF

Stbd F.O return cooler LTFW out

[at cooler]

80- 90 ºF

FUEL OIL CONSUMPTION FULL POWER

PARAMETER DESIGN MDG 1 MDG 2 MDG 3 MDG 4 SAT/UNSAT

Fuel Supply Meter (STOP) [MCCS]

Fuel Return Meter (STOP) [MCCS]

Meter Start Time

Fuel Supply Meter (START) [MCCS]

Fuel Return Meter (START) [MCCS]

Meter Stop Time

Fuel Consumption, kg/hr

8 of 9 SWBS TEST NO. 20001

COOLING WATER – CENTRAL SEA WATER

PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT

Suction pressure [at pump] 3-5 PSIG

Discharge pressure [at pump] 40-45 PSIG

High Sea Suction DP [suction inlet] 1.5 PSID

Low Sea Suction DP [suction inlet] 0.5 PSID

Sea Water temperature

COOLING WATER – L.T.F.W.

PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT

Suction pressure [at pump] 15-20 PSIG

Discharge pressure [at pump] 74-93 PSIG

L.T.F.W. temp to coolers [at cooler] 80-100 ºF

L.T.F.W. temp from coolers [at cooler] < 108 ºF

Final LT.F.W. temp outlet [at cooler] 70-90 ºF

S.W. temp to cooler (IR) [at cooler or at sea chest]

S.W. temp from cooler [at cooler] 70-90 ºF

COOLING WATER – H.T.F.W.

PARAMETER DESIGN NO. 1 NO. 2 NO. 3 NO. 4 SAT/UNSAT

Suction pressure [at pump] 10-15 PSIG

Discharge pressure [at pump] ~64 PSIG

H.T.F.W. temp to coolers [at cooler] 80-100 ºF

H.T.F.W. temp from coolers [at cooler] 100-120 ºF

S.W. temp to cooler [at cooler]

S.W. temp from cooler [at cooler] 90-110 ºF

THIRD PARTY INSPECTOR

YES/NO 3RD PARTY INSPECTOR

(PRINT NAME)

EXAM TYPE

(e.g. monthly, annual, 36 month, etc.)

Was this a third party inspection?

COMMENTS (Inspector’s Command; Contact Info; etc.):

MAJOR DEFICIENCIES

Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.

Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.

DEFICIENT ITEM,

CONDITION OR

FUNCTION

IMPACT: (SAFETY,

REGULATION, MISSION,

OR MATERIAL READINESS)

POTENTIAL CAUSE RECOMMENDED

CORRECTIVE ACTION

OVERALL ASSESSMENT

OPERATOR (PRINT NAME) SIGNATURE

9 of 9 SWBS TEST NO. 20001

INSPECTOR (PRINT NAME) SIGNATURE SAT/UNSAT ACTION

INSPECTOR’S COMMENTS:

1 of 10 SWBS TEST NO. 30011

SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.

MCLEAN (T-AKE 12) ELECTRICAL PANEL INSPECTION

AND THERMOGRAPHY - LISTS

30011

REVISION DATE

05/02/2016

ASSESSMENT/

TEST DATE

ORGANIZATION PERFORMING

ASSESSMENT/TEST

SENIOR INSPECTOR

ABSTRACT: This test memo provides a list of electrical panels, load centers and switchboards to be inspected and thermographically surveyed during this visit. The thermographic component of this memo requires surveyed equipment to be operational and under load prior to and during the survey.

DOCUMENTATION (REFERENCES)

REFERENCE PUBLICATION NO. TITLE

A MIL-STD-2194 INFRARED THERMAL IMAGING SURVEY PROCEDURE FOR

ELECTRICAL EQUIPMENT

ASSOCIATED SWBS TESTS/INSPECTIONS

SWBS NUMBER SWBS TEST TITLE

20001 FULL POWER TRIAL FULL AHEAD

20303 MAIN PROPULSION ELECTRIC MOTOR

30104 EMERGENCY DIESEL GENERATOR

30401 PROPULSION TRANSFORMERS

30402 SHIP’S SERVICE TRANSFORMERS

30501 SHORE POWER CABLES AND BREAKERS

30701 ABT AND ELECTRICAL INTERLOCK

50501 PUMPS, MISCELLANEOUS

50801 STEERING GEAR

VESSEL REPAIR REQUESTS (VRR)

Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.

PARAMETER YES/NO EQPT: EQPT: EQPT:

Are there unresolved VRRs prior to testing? If “Yes,” list them.

VRR: VRR: VRR:

Were VRRs generated after testing? If “Yes,” list them.

VRR: VRR: VRR:

Do any of the above listed

VRRs limit operation? If

“Yes,” list them.

2 of 10 SWBS TEST NO. 30011

WARNING

SHIP’S ELECTRICAL SAFETY PROCEDURES

SHALL BE FOLLOWED AT ALL TIMES

LOCATION OF EQUIPMENT

Note 1: Perform thermal imaging survey per Reference A using below table for location of ship’s equipment.

Note 2: Coordinate survey with ship’s force and other SMART inspectors to minimize impact on equipment and personnel.

Note 3: Equipment to be surveyed shall be under normal loading conditions and in service for a minimum of ½ hour prior to being surveyed.

Note 4: List of all deficiencies identified during survey will be provided to SMART Team leader and ship for corrective action.

Note 5: Equipment not available for survey shall be listed with explanation as to why it was not available.

MODEL/NOMENCLATURE/TYPE LOCATION

E-POWER PANEL EP101 BRIDGE 07-58-1

BILGE/BALLAST PUMP NO1 AUX MACHINERY ROOM

BILGE / BALLAST PUMP NO2 AUX MACHINERY ROOM

CARGO HOLD OILY WASTE TRANSFER PUMP NO1 AUX MACHINERY ROOM

CARGO HOLD OILY WASTE TRANSFER PUMP NO2 AUX MACHINERY ROOM

DEWATERING PUMP NO1 AUX MACHINERY ROOM

DEWATERING PUMP NO2 AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO1 ABT ALT AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO1 ABT NORM AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO2 ABT (ALT) AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO2 ABT (NORM) AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO3 ABT (ALT) AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO3 ABT (NORM) AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO4 ABT (ALT) AUX MACHINERY ROOM

FIRE / SPRINKLING PUMP NO4 ABT (NORM) AUX MACHINERY ROOM

LT CHILLED WATER CIRC PUMP NO1 AUX MACHINERY ROOM

LT CHILLED WATER CIRC PUMP NO2 AUX MACHINERY ROOM

LT CHILLED WATER CIRC PUMP NO3 AUX MACHINERY ROOM

LT CHILLED WATER CIRC PUMP NO4 AUX MACHINERY ROOM

LT CHILLED WATER CIRC PUMP NO5 AUX MACHINERY ROOM

OILY WASTE TRANSFER PUMP NO1 AUX MACHINERY ROOM

OILY WASTE TRANSFER PUMP NO2 AUX MACHINERY ROOM

EMERGENCY FIRE PUMP NO1 CARGO & AUX PUMP ROOM

MAIN CARGO F-76 TRANSFER PUMP NO1 CARGO & AUX PUMP ROOM

MAIN CARGO F-76 TRANSFER PUMP NO2 CARGO & AUX PUMP ROOM

AFT FOAM CONCENTRATE PUMP FOAM ROOM

DIESEL FUEL SERVICE PUMP NO3 FUEL SERVICE ROOM

GAYLORD HOOD BOOSTER PUMP GALLEY

AUX DIESEL FUEL TRANSFER PUMP MAIN MACHINERY ROOM

CENT SW CLG PUMP NO1 MAIN MACHINERY ROOM

CENT SW CLG PUMP NO2 MAIN MACHINERY ROOM

CENT SW CLG PUMP NO3 MAIN MACHINERY ROOM

CENTRAL LT FW PUMP NO1 MAIN MACHINERY ROOM

CENTRAL LT FW PUMP NO3 MAIN MACHINERY ROOM

CENTRAL HT FW PUMP NO1 MAIN MACHINERY ROOM

CENTRAL HT FW PUMP NO2 MAIN MACHINERY ROOM

CENTRAL HT FW PUMP NO3 MAIN MACHINERY ROOM

CENTRAL LT FW PUMP NO2 MAIN MACHINERY ROOM

HT CHILLED WATER CIRC PUMP NO1 MAIN MACHINERY ROOM

HT CHILLED WATER CIRC PUMP NO2 MAIN MACHINERY ROOM

LUBE OIL TRANSFER PUMP NO1 MAIN MACHINERY ROOM

LUBE OIL TRANSFER PUMP NO2 MAIN MACHINERY ROOM

MAIN DIESEL FUEL TRANSFER PUMP MAIN MACHINERY ROOM

MAIN ENGINE 1 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM

MAIN ENGINE 2 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM

MAIN ENGINE 3 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM

3 of 10 SWBS TEST NO. 30011

MAIN ENGINE 4 LUBE OIL PRIMING PUMP MAIN MACHINERY ROOM

PROPULSION CONVERTER 1A DEIONIZED C/W

PUMP NO1

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION CONVERTER 1A DEIONIZED C/W

PUMP NO2

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION CONVERTER 1B DEIONIZED C/W

PUMP NO1

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION CONVERTER 1B DEIONIZED C/W

PUMP NO2

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1A COOLING FAN

NO1

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1A COOLING FAN

NO2

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1A COOLING FAN

NO3

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1A COOLING FAN

NO4

PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1B COOLING FAN NO1 PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1B COOLING FAN NO2 PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1B COOLING FAN NO3 PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION TRANSFORMER 1B COOLING FAN NO4 PROPULSION MOTOR EQUIPMENT ROOM NO1

PROPULSION CONVERTER 2A DEIONIZED C/W

PUMP NO1

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION CONVERTER 2A DEIONIZED C/W

PUMP NO2

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION CONVERTER 2B DEIONIZED C/W

PUMP NO1

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION CONVERTER 2B DEIONIZED C/W

PUMP NO2

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2A COOLING FAN

NO1

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2A COOLING FAN

NO2

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2A COOLING FAN

NO3

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2A COOLING FAN

NO4

PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2B COOLING FAN NO1 PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2B COOLING FAN NO2 PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2B COOLING FAN NO3 PROPULSION MOTOR EQUIPMENT ROOM NO2

PROPULSION TRANSFORMER 2B COOLING FAN NO4 PROPULSION MOTOR EQUIPMENT ROOM NO2

CARGO POTABLE WATER PUMP NO1 PROPULSION MOTOR ROOM

CARGO POTABLE WATER PUMP NO2 PROPULSION MOTOR ROOM

EMERGENCY FIRE PUMP NO2 PROPULSION MOTOR ROOM

PROPULSION MOTOR 1 COOLING FAN NO. 1 PROPULSION MOTOR ROOM

PROPULSION MOTOR 1 COOLING FAN NO. 2 PROPULSION MOTOR ROOM

PROPULSION MOTOR 1 COOLING FAN NO. 3 PROPULSION MOTOR ROOM

PROPULSION MOTOR 1 COOLING FAN NO. 4 PROPULSION MOTOR ROOM

PROPULSION MOTOR 2 COOLING FAN NO. 1 PROPULSION MOTOR ROOM

PROPULSION MOTOR 2 COOLING FAN NO. 2 PROPULSION MOTOR ROOM

PROPULSION MOTOR 2 COOLING FAN NO. 3 PROPULSION MOTOR ROOM

PROPULSION MOTOR 2 COOLING FAN NO. 4 PROPULSION MOTOR ROOM

DIESEL FUEL SERVICE PUMP NO1 PURIFIER ROOM

DIESEL FUEL SERVICE PUMP NO2 PURIFIER ROOM

FUEL OIL PURIFIER DO 1 PURIFIER ROOM

HAULING WINCH REPL PUMP STATION 1

HIGHLINE WINCH REPL PUMP STATION 1

HIGHLINE WINCH REPL PUMP STATION 2

4 of 10 SWBS TEST NO. 30011

STATION 2 HAULING WINCH REPL PUMP STATION 2

SPANWIRE REPL PUMP STATION 3

STATION 4 SPANWIRE REPL PUMP STATION 4

HAULING WINCH REPL PUMP STATION 5

HIGHLINE WINCH REPL PUMP STATION 5

STATION 6 HAULING WINCH REPL PUMP STATION 6

STATION 6 HIGHLINE WINCH REPL PUMP STATION 6

HAULING WINCH REPL PUMP STATION 8

HIGHLINE WINCH REPL PUMP STATION 8

STEERING GEAR MOTOR #2 STEERING GEAR ROOM

STEERING GEAR MOTOR NO1 STEERING GEAR ROOM

HOT WATER CIRC PUMP NO1 WATER HEATER SPACE

HOT WATER CIRC PUMP NO2 WATER HEATER SPACE

AUX CARGO F-44 TRANSFER PUMP 1 CARGO AND AUX PUMP RM, 5-35-0,

AUX CARGO F-44 TRANSFER PUMP 2 CARGO AND AUX PUMP RM, 5-35-0,

AUX CARGO F-76 TRANSFER PUMP CARGO AND AUX PUMP RM, 5-35-0,

AVIATION F-44 SERVICE PUMP 3-82.5-4 JP-5 PUMP RM

AVIATION F-44 STRIPPING PUMP

AVIATION F-44 TRANSFER PUMP 3-82.5-4 JP-5 PUMP RM

CARGO F-44 STRIPPING PUMP 4-38.5-0

CARGO F-76 STRIPPING PUMP 4-38.5-0

CARGO OCM SAMPLE PUMP

CARGO PUMP ROOM OILY WASTE TRANSFER PUMP CARGO PUMP RM 2-13-0

DEWATER/BALLAST PUMP NO1 CARGO & AUX PUMP RM

DIST PLANT METERING PUMP MN MCHRY RM 5-66-0

PROPULSION MOTOR DE JACKING PUMP NO. 1

PROPULSION MOTOR DE JACKING PUMP NO. 2

PROPULSION MOTOR NDE JACKING PUMP NO. 1

PROPULSION MOTOR NDE JACKING PUMP NO. 2

LIST OF MOTOR CONTROL CENTERS

EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION

A01 MCC A01 AUX. MACHINERY ROOM 5-58-1

A02 MCC A02 AUX. MACHINERY ROOM 5-58-1

F03 MCC F03 STA. 3 MOTOR CONTROL ROOM 01-49-1

F04 MCC F04 STA.4 MOTOR CONTROL ROOM 01-49-2

HV01 MCC HV01 FAN ROOM 07-62-4

HV02 MCC HV02 CTRL FAN ROOM 02-71-0

HV03 MCC HV03 FAN ROOM 03-71-0

M01 MCC M01 MAIN MACHINERY ROOM 5-67-1

M02 MCC M02 MAIN MACHINERY ROOM 5-67-1

M03 MCC M03 POT WTR / SS AIR COMP #2 ROOM 4-76-4

M04 MCC M04 PROPULSION MOTOR ROOM 4-76-0

M05 MCC M05 SEWAGE TREATMENT ROOM 3-75-6

M08 MCC M08 POT WTR / SS COMP #2 ROOM 4-76-4

M09 MCC M09 POT WTR / SS COMP #2 ROOM 4-76-4

M10 MCC M10 PROPULSION MOTOR EQUIPMENT ROOM

#1 3-75-1

M11 MCC M11 PROPULSION MOTOR EQUIPMENT ROOM

#1 3-75-1

M12 MCC M12 PROPULSION MOTOR EQUIPMENT ROOM

#1

M13 MCC M13 PROPULSION MOTOR EQUIPMENT ROOM

#1 3-75-1

M14 MCC M14 JP-5 PUMP ROOM 3-82.5-4

MV01 MCC MV01 ENGINE ROOM 10M LVL / 3-70-2

MV02 MCC MV02 ENGINE ROOM 10M LVL / 3-71-2

5 of 10 SWBS TEST NO. 30011

P01 MCC P01 CARGO & AUX PUMP ROOM

5-34-0 / 5-34-1

P02 MCC P02 CARGO & AUX PUMP ROOM

5-34-0 / 5-35-1

R01 MCC R01 STA. 1 MOTOR CONTROL ROOM 01-36-1

R02 MCC R02 STA. 2 MOTOR CONTROLLER ROOM 01-36-

R05 MCC R05 STA 5 MOTOR CONTROL ROOM

01-53.5-1

R06 MCC R06 STA 6 MOTOR CONTROL ROOM 01-54-2

R08 MCC R08 STA 8 MOTOR CONTROL ROOM

02-76-2

V01 MCC V01 ELECTRICAL SUBSTATION LC01 1-18-01

V03 MCC V03 ELECTRICAL SUBSTATION LC03 (2-39-1)

V04 MCC V04 ELECTRICAL SUBSTATION LC04 2-39-4

V05 MCC V05 FAN ROOM 02-32-0

V07 MCC V07 FAN ROOM 01-51.5-3

V08 MCC V08 FAN ROOM 01-51.5-4

V09 MCC V09 FAN ROOM 2-70-2

V10 MCC V10 AVIATION OFFICE 01-71-3

LIST OF ELECTRICAL SWITCHBOARDS

MODEL/NOMENCLATURE/TYPE LOCATION

MAIN SWBD 1 3-72-0

MAIN SWBD 2 3-72-0

EMERGENCY SWITCHBOARD 480V EDG ROOM 02-73-1

S/S SWBD 1 120V SECTION MAIN MACHINERY ROOM 3-66-1

MAIN SWBD 1 120V MINI BUS MAIN SWITCHBOARD

MAIN SWBD 2 120V MINI BUS MAIN SWITCHBOARD

S/S SWBD 2 120V SECTION EOS

SHIP'S SERVICE SWITCHBOARD 2 EOS

SHIP'S SERVICE SWITCHBOARD 1 EOS 3-66-2

LIST OF ELECTRICAL LOAD CENTERS

EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION

LC01 POWER SUBSTATION ELECTRICAL SUBSTATION LC01 (1-08-01)

LC02 POWER SUBSTATION ELECTRICAL SUBSTATION LC02 (1-33-2)

LC03 POWER SUBSTATION ELECTRICAL SUBSTATION LC03 (2-38-1)

LC04 POWER SUBSTATION ELECTRICAL SUBSTATION LC04 (2-38-2)

LC05 POWER SUBSTATION ELECTRICAL SUBSTATION LC05 (01-39.5-1)

LC06 POWER SUBSTATION ELECTRICAL SUBSTATION LC06 (01-39.5-2)

LC07 POWER SUBSTATION ELECTRICAL SUBSTATION LC07 (01-56-1)

LC08 POWER SUBSTATION ELECTRICAL SUBSTATION LC08 (01-56-2)

LC09 POWER SUBSTATION ELECTRICAL SUBSTATION LC09 (5-58-01)

LC10 POWER SUBSTATION ELECTRICAL SUBSTATION LC10 (5-58-01)

LC11 POWER SUBSTATION ELECTRICAL SUBSTATION LC11

LC12 POWER SUBSTATION ELECTRICAL SUBSTATION LC12 (5-58-01)

LIST OF ELECTRICAL PANELS

EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION

P101 120 VAC POWER DISTRIBUTION PANEL GALLEY 01-58-1

P102 120 VAC POWER DISTRIBUTION PANEL SCULLERY 01-62-5-1

P103 120 VAC POWER DISTRIBUTION PANEL CREW MESS 01-64-2

P104 120 VAC POWER DISTRIBUTION PANEL OFFICER MESS 01-61-2

P105 120 VAC POWER DISTRIBUTION PANEL AVIATION WORKSHOP 01-74-1

P106 120 VAC POWER DISTRIBUTION PANEL MATERIAL HANDLING EQUIPMENT

(MHE) 10 METER LEVEL 1-24-0

6 of 10 SWBS TEST NO. 30011

P107 120 VAC POWER DISTRIBUTION PANEL GENERAL MAINTENANCE

WORKSHOP 5-66-0

P108 120 VAC POWER DISTRIBUTION PANEL MAIN MACHINERY ROOM (MMR) 10

METER LEVEL 5-66-0

P109 120 VAC POWER DISTRIBUTION PANEL MMR 10 METER LEVEL VL (P) 5-66-0

P110 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-

60-0

P111 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 04-

60-0

P112 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 06-

60-0

P113 120 VAC POWER DISTRIBUTION PANEL NETWORK MANAGEMENT CENTER

07-62-0

P114 120 VAC POWER DISTRIBUTION PANEL NETWORK MANAGEMENT CENTER

07-62-0

P116 120 VAC POWER DISTRIBUTION PANEL STAIR TOWER 01

LEVEL 5-57-0

P117 120 VAC POWER DISTRIBUTION PANEL AUXILIARY MACHINERY ROOM

(AMR) 5-58-01

P118 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-

60-0

P119 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER

07-62-1

P120 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER

07-62-1

P121 120 VAC POWER DISTRIBUTION PANEL NAVAL COMMUNICATIONS CENTER

07-62-1

P203 120 VAC POWER DISTRIBUTION PANEL 01 AND 02 LEVEL AND

2ND DECK HEATING ELECTRICAL

SUBSTATION LC08 01-56-2

P205 120 VAC POWER DISTRIBUTION PANEL 02 LEVEL HEATING ELECTRICAL

EQUIPMENT ROOM 01-56-2

P206 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 03

LEVEL HEATING 03-60-0

P207 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 04

LEVEL HEATING 04-60-0

P208 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 05

LEVEL HEATING 05-60-0

P209 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM

06/07 LEVEL HEATING 06-60-0

P210 120 VAC POWER DISTRIBUTION PANEL MILDET CREW LAUNDRY 02-62-0

P211 120 VAC POWER DISTRIBUTION PANEL CIVILIAN CREW LAUNDRY 03-62-0

P212 120 VAC POWER DISTRIBUTION PANEL CIVILIAN CREW LAUNDRY 04-73.5-0

P213 120 VAC POWER DISTRIBUTION PANEL CPO LAUNDRY 05-62.5

P214 120 VAC POWER DISTRIBUTION PANEL OFFICER LAUNDRY 06-62-0

P215 120 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 02-

60-0

P401 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC02 1-

42-2

P402 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC05 01-

39.5-1

P403 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL SUBSTATION LC06 01-

39.5-2

P404 480 VAC POWER DISTRIBUTION PANEL AMR 5-58-01

P405 480 VAC POWER DISTRIBUTION PANEL GALLEY 01-58-3

P406 480 VAC POWER DISTRIBUTION PANEL SCULLERY 01-62.5-1

P407 480 VAC POWER DISTRIBUTION PANEL ENGINEER’S WORKSHOP 4-69-1

P408 480 VAC POWER DISTRIBUTION PANEL MMR 2 METER LEVEL 5-66-0

7 of 10 SWBS TEST NO. 30011

P409 480 VAC POWER DISTRIBUTION PANEL MMR10 METER LEVEL 5-66-0

P410 480 VAC POWER DISTRIBUTION PANEL PURIFIER ROOM 4-70-2

P411 480 VAC POWER DISTRIBUTION PANEL PURIFIER ROOM 4-70-2

P412 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL

ELECTRIC EQUIPMENT ROOM 1-62-1

P413 480 VAC POWER DISTRIBUTION PANEL GENERAL MAINTENANCE

WORKSHOP 01-36-0

P414 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 03-

60-0

P415 480 VAC POWER DISTRIBUTION PANEL STAIR TOWER 3RD DECK 3-84.5-2

P416 480 VAC POWER DISTRIBUTION PANEL IC RADAR AND GYRO ROOM 07-61.5-

P417 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL

ELECTRIC SUBSTATION 01-56-1

P418 480 VAC POWER DISTRIBUTION PANEL DEGAUSSING POWER PANEL STAIR

TOWER 3RD DECK 3-84.5-2

P419 480 VAC POWER DISTRIBUTION PANEL STAIR TOWER MOTOR OPERATED

VALVE (MOV) 2ND DECK 3-66-2

P420A 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2

ND

DECK

5-39.5-2

P420B 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2

ND

DECK

5-39.5-2

P420C 480 VAC POWER DISTRIBUTION PANEL MOV PUMP ROOM ACCESS 2

ND

DECK

5-39.5-2

P421 480 VAC POWER DISTRIBUTION PANEL ELECTRICAL EQUIPMENT ROOM 06-

60-0

P422 480 VAC POWER DISTRIBUTION PANEL SOLID WASTE PROCESSING ROOM

01-68.5-5

P423 480 VAC POWER DISTRIBUTION PANEL SHIP’S LAUNDRY 2-68.5-2

P424 480 VAC POWER DISTRIBUTION PANEL PROPULSION MOTOR ROOM 5-75-0

P425 480 VAC POWER DISTRIBUTION PANEL MMR HEATERS 5-58-01

P426 480 VAC POWER DISTRIBUTION PANEL AMR HEATERS AMR 5-58-01

EP101 120 VAC EMERGENCY POWER PANEL NAVIGATION BRIDGE 07-58-0

EP102 120 VAC EMERGENCY POWER PANEL EOS 3-66-02

EP103 120 VAC EMERGENCY POWER PANEL MAIN MACHINERY ROOM 6 METERS

ABL 5-66-0

EP105 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3

EP106 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC

RADAR AND GYRO ROOM 07-61.5-2

EP107 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC

RADAR AND GYRO ROOM 07-61.5-2

EP108 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3

EP109 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3

EP110 120 VAC EMERGENCY POWER PANEL ELECTRONICS AND NAVIGATION IC

RADAR AND GYRO ROOM 07-61.5-2

EP111 120 VAC EMERGENCY POWER PANEL TRANSMITTER ROOM 07-66-3

EP403 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0

EP404 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0

EP405 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-48-0

EP406 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0

EP407 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2

EP408A 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0

EP408B 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-58-0

EP409 480 VAC EMERGENCY POWER PANEL MMR 10 METER LEVEL FR 74P 5-66-0

EP411 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2

EP412 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 4-77.5-2

EP413 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 5-57-0

8 of 10 SWBS TEST NO. 30011

EP414 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 2-38.5-0

EP415 480 VAC EMERGENCY POWER PANEL STAIR TOWER MAIN DECK 3-66-01

EP416 480 VAC EMERGENCY POWER PANEL IC RADAR AND GYRO ROOM

07-61.5-2

EP417 480 VAC EMERGENCY POWER PANEL HEATING/VENTILATION

/AIR CONDITIONING (HVAC) WATER

TIGHT CLOSURES

EP418 480 VAC EMERGENCY POWER PANEL HVAC WATER TIGHT CLOSURES

L100 120 VAC LIGHTING PANEL BOSUN LOCKER 1-K-0

L101 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 1-

34-2

L102 120 VAC LIGHTING PANEL ELECTRICAL SUBSTATION LC5 01-

39.5-1

L103 120 VAC LIGHTING PANEL STAIR TOWER 01 LEVEL 5-57-0

L104 120 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-58-0

L105 120 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-58-0

L106 120 VAC LIGHTING PANEL AUXILIARY MACHINERY ROOM 2

METER FLAT 5-58-01

L107 120 VAC LIGHTING PANEL STAIR TOWER 01 LEVEL 3-66-01

L108 120 VAC LIGHTING PANEL STAIR TOWER MAIN DECK

3-66-01

L109 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02

LEVEL 02-60-0

L110 120 VAC LIGHTING PANEL MMR 10.35 METER FLAT 5-66-0

L111 120 VAC LIGHTING PANEL MMR 6 METER FLAT 5-66-0

L112 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02-

60-0

L113 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 02-

60-0

L114 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-

60-0

L115 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-

60-0

L116 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-

60-0

L117 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-

60-0

L118 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-

60-0

L119 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-

60-0

L120 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-

60-0

L121 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-

60-0

L122 120 VAC LIGHTING PANEL STAIR TOWER 07 LEVEL 01-61-2

L123 120 VAC LIGHTING PANEL STEERING GEAR ROOM 3-85-0

L124 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 03-

60-0

L125 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 04-

60-0

L126 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 05-

60-0

L127 120 VAC LIGHTING PANEL ELECTRICAL EQUIPMENT ROOM 06-

60-0

L401 480 VAC LIGHTING PANEL STAIR TOWER MAIN DECK 5-48-0

L402 480 VAC LIGHTING PANEL

L403 480 VAC LIGHTING PANEL STAIR TOWER 2ND DECK 5-48-0

9 of 10 SWBS TEST NO. 30011

L404 480 VAC LIGHTING PANEL ELECTRICAL SUBSTATION

01-56-2

L405 480 VAC LIGHTING PANEL STAIR TOWER MAIN DECK

3-66-01

EL100 120 VAC EMERGENCY LIGHTING PANEL ELECTRICAL SUBSTATION LC2

1-24-2

EL101 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 5-48-0

EL102 120 VAC EMERGENCY LIGHTING PANEL

EL103 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 5-48-0

EL104 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 2ND DECK 5-57-0

EL105 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 01 LEVEL 01-61-2

EL106 120 VAC EMERGENCY LIGHTING PANEL MMR 10M METER FLAT 5-66-0

EL107 120 VAC EMERGENCY LIGHTING PANEL STAIR TOWER 2ND DECK 3-66-01

EL108 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 02 LEVEL 2-67.5-0

EL109 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 04 LEVEL

2-67.5-0

EL110 120 VAC EMERGENCY LIGHTING PANEL SERVICE TRUNK 06 LEVEL

2-67.5-0

EL111 120 VAC EMERGENCY LIGHTING PANEL AVIATION CONTROL STATION

02-77-2

VMS POWER PANEL VMS IC RADAR & GYRO ROOM, 07-61.5-2

PRE-OPERATIONAL CHECKLIST

PARAMETER YES/NO OBSERVATION

Nameplates installed?

Local Instrument?

Calibration?

Is preservation providing corrosion protection?

Any faults or alarms noted?

THERMOGRAPHIC SURVEY

Instructions: Perform Thermographic survey of equipment listed in Table above. In the observed column provide amplification regarding any findings or discrepancies identified during survey. If any single surveyed item does not meet the design value indicate “UNSAT”. Make as many copies of this page as necessary prior to filling in.

PARAMETER DESIGN OBSERVED SAT/UNSAT

Electrical connections Mechanically tight

Electrical connections Clean and free of corrosion

Fasteners Proper material and size

Connections Properly insulated as applicable

Insulation Good condition, intact and free of visible damage

ELECTRICAL PANEL INSPECTION

Instructions: Ensure electrical panels listed in above Equipment Location table meet the following parameters. In the Observed column, provide amplification regarding any findings or discrepancies. If any one single location observed value does not meet the design value, indicate “UNSAT”. Make as many copies of these pages as necessary prior to filling in.

PARAMETER DESIGN OBSERVED SAT/UNSAT

Circuit Label plates Installed

Breakers rating Matches label plate

Connecting bars ( gang bar) Properly installed on multiphase breakers

10 of 10 SWBS TEST NO. 30011

Panel Clean, no signs of water intrusion, dirt, rust or mechanical failure

Proper cable penetration devices Installed (watertight tubes installed on watertight or drip proof enclosures)

All cable penetrations Tight, no empty tubes left unpacked

All cables Properly installed, cable outer insulation/cable jacket well within panel

All breakers Properly installed and functional

All cover screws and fasteners Properly installed

Electrical cables Good physical condition, insulation is not cracked, cut, damaged or showing signs of overheating

EXAM TYPE

(e.g. monthly, annual, 36 month, etc.)

Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.

Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.

DEFICIENT ITEM,

CONDITION OR

FUNCTION

IMPACT: (SAFETY,

REGULATION, MISSION,

OR MATERIAL READINESS)

1 of 10 SWBS TEST NO. 50102

SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.

MCLEAN (T-AKE 12) A/C CHILL WATER UNITS 50102

ORGANIZATION PERFORMING

ASSESSMENT/TEST

ABSTRACT: This test memo assesses the condition and operation of A/C Chill Water Units. This test memo can be performed concurrent with Test Memo 50103.

DOCUMENTATION (REFERENCES)

REFERENCE PUBLICATION NO. TITLE

A T9516-BB-MMC-010 REFRIGERATION PLANT, AIR CONDITIONING

B MSC 514-7488755 SRD: A/C CHILLED WATER SYSTEM DIAGRAM

ASSOCIATED SWBS TESTS/INSPECTIONS

SWBS NUMBER SWBS TEST TITLE

50103 AIR CONDITIONING CHILL WATER PUMPS

Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.

PARAMETER YES/NO EQPT: EQPT: EQPT:

Are there unresolved VRRs prior to testing? If “Yes,” list them.

VRR: VRR: VRR:

Were VRRs generated after testing? If “Yes,” list them.

VRR: VRR: VRR:

Do any of the above listed

VRRs limit operation? If

“Yes,” list them.

LOCATION OF EQUIPMENT

EQUIPMENT NO. MODEL/NOMENCLATURE/TYPE LOCATION

NOS. 1 THRU 4 A/C CHILL WATER UNITS AMR 5-58-1

PRE-OPERATIONAL CHECKLIST

PARAMETER YES/NO OBSERVATION

Nameplates installed?

2 of 10 SWBS TEST NO. 50102

Local instrument?

Calibration?

Is preservation providing corrosion protection?

Any faults or alarms noted?

MATERIAL INSPECTION

PARAMETER DESIGN

OBSERVED

DESIGN

OBSERVED

DESIGN

OBSERVED

DESIGN

OBSERVED

SAT/UNSAT

AC 4 (NO. 1) AC 5 (NO. 2) AC 6 (NO. 3) AC 7 (NO. 4)

Flange shields No leaks No leaks No leaks No leaks

Piping No leaks No leaks No leaks No leaks

Insulation Intact Intact Intact Intact

Labeling Legible Legible Legible Legible

Gauges Legible Legible Legible Legible

Foundation Not damaged

Not damaged

Not damaged

Not damaged

SAFETY DEVICES AND CONTROLS

Instructions: Use the applicable note(s) below to complete testing. All software set points for each unit to be verified.

Notes:

(1) Denotes testing to be performed for all units. (Random testing will be performed for remaining devices.)

(2) Where a hot pot is indicated but unavailable for testing, the device may be demonstrated by opening the device contacts. Verify hot pot calibration: (Calibration Due Date)

(3) Electronic trips are conducted by changing the set point in the software. Ensure original set point is restored after trip is demonstrated.

(4) Set points for all devices to be verified by checking software.

PARAMETER ALARM

MESSAGE

PARAMETER

ON MIMIC

DESIGN AC 4

(NO. 1)

AC 5

(NO. 2)

AC 6

(NO. 3)

AC 7

(NO. 4)

SAT/

UNSAT

Unit will not start with

Control Panel

Door open

(1)(4)

External stop N/A Unit should not start

Local

Emergency

Stop

(Compressor stops) (1)(4)

ESTOP N/A CCU Control

Panel (CCU)

Local

Emergency

Stop

(Compressor stops) (1)(4)

ESTOP N/A Compressor

Starter (CS)

High Press

Monitor Cut-

Out, Electronic

(1) (3) (4)

High condensing pressure

Discharge

Saturated

122º F +/-

1.8º

(50º C +/-1º)

High Press

Out, Mechanical (1)

(4)

High discharge pressostat

Discharge

Saturated

124.9º F-

127.4º F

(51.6º C-53º

C)

191.PSIG

+0/-8

3 of 10 SWBS TEST NO. 50102

(13.2bar +0/-

0.5)

Low Press

Monitor Cut-

Out, Electronic

(3) (4)

LOW EVAP

TEMP

Evaporating

Saturated

15.8º F +/-2º

Low Press

Out, Mechanical (1)

(4)

LOW

SUCTION

PRESSOSTA

T

Evaporating

Saturated

9º F -11.5° F

(-12.8 to -

11.4ºC)

11.6 PSIG

+1.5/-0 (0.8 bar +0.1/-0)

Discharge Gas

Superheat

Monitor, Liquid

Chiller Stops

(1) (3) (4)

LOW

DISCHARG

E

SUPERHEA

T

Superheat >59º F +/-2º

(>15º C +/-

1º)

Discharge Gas

Temp., Electronic Trip

(3) (4)

HIGH

DISCHARG

E TEMP.

Discharge Gas 176º F +0º/-

5.4º (80º C

+0º/-3º)

High Discharge

Gas Temp, Mechanical

Trip (Need Hot

Pot) (1) (2) (4)

HIGH

DISCHARG

E TEMP.

Discharge Gas 212º F +0º/-

6º (100º C

Low Oil

Pressure Trip

PT03=Oil Press

PT01=Disch

Press (1) (3)

(4)

LUBRICATI

ON OIL

FAILURE

Oil Pressure PT03-PT01

<1 bar &

PT03 <18

bar, or PT03-

PT01 >5 bar

& PT03<18

bar

Chilled Water

Outlet Temp

Alarm (3) (4)

LOW

ALARM

N/A >41ºF

(>5 ºC)

Inlet High

Temp Alarm

(3) (4)

HIGH

ALARM

N/A 68ºF +0º/-

1.8º (20ºC

+0º/-1º)

Inlet Low

Temp Alarm

(3) (4)

LOW

ALARM

N/A 39.2ºF

+1.8º/-0º

(4ºC +1º/-0º)

Low Oil Temp

Start Block

(1) (3) (4)

START NOT

ALLOWED

LOW OIL

TEMP

OIL 32ºF-86ºF

Disch Gas

Temp., Electronic

Alarm (3) (4)

HIGH

ALARM

Discharge Gas 167ºF +0º/-

5.4º (75ºC

Condenser

Water Inlet

High Temp

Alarm (3) (4)

HIGH

ALARM

N/A 105.8ºF

+1.8º/-3.6º

(41ºC +1º/-

2º)

Condenser

Water Outlet

High Temp

HIGH

ALARM

N/A 111ºF

(44ºC)

4 of 10 SWBS TEST NO. 50102

Alarm

(3) (4)

Condenser

Water Outlet

Low Temp

Alarm

(3) (4)

LOW

ALARM

N/A 66.2ºF

Oil Reservoir

Heater Operates while on

Standby

(3) (4)

N/A OIL MIN 86°F

(30°C)

A/C Plant does not start w/o

Condenser

Cooling Water

Flow (1) (4)

NO CW

FLOW

N/A Operates as intended

A/C Plant shuts down when

Condenser

Cooling Water stops (1) (4)

START NOT

ALLOWED

NO COND

FLOW

A/C Plant shuts down when

Chill Water

Flow to the

Evaporator stops (1) (4)

NOT

ENOUGH

FLOW

EVAP

A/C Chill

Water Pump

Interlock stops plant startup w/o Chill Water flow to

Evaporator

(1)(4)

START NOT

ALLOWED

NO EVAP

FLOW

Check status of

R134A

Refrigerant leak detection

(1) (4)

N/A N/A Bilge Sensors operate as

Check status of

R134A

Refrigerant leak detection

(1) (4)

N/A N/A Console indicates as

Demonstrate operation of

Manual

Capacity

Increase/Decrea se Controls on

Control Cabinet and on top of

Compressor

(1) (4)

N/A CAPACITY Operates as intended on increase and decrease

Summary

Alarm at

N/A N/A Summary alarm

5 of 10 SWBS TEST NO. 50102

MCCS

(1) (4) indicates as

OPERATING DATA

PARAMETER INDICATION DESIGN AC 4

(NO. 1)

AC 5

(NO. 2)

AC 6

(NO. 3)

AC 7

(NO. 4)

Load AC/MIMIC

Suction Pressure LOCAL 30-40 psig

Suction Temperature AC/MIMIC 45-55 ºF

Suction Superheat AC/MIMIC 10-15 ºF

Discharge Pressure LOCAL 85-95 psig

Discharge Temperature AC/MIMIC 145-155 ºF

Discharge Superheat AC/MIMIC 45-55 ºF

Refrigerant Temperature at TXV LOCAL (IR)

Oil Pressure AC/MIMIC 110-140 psig

Oil Temperature AC/MIMIC 145-155 ºF

Oil Differential Pressure AC/MIMIC 5-7 psi

Oil Level LOCAL SAT

Oil Flow LOCAL SAT

LTFW Temperature to Condenser AC/MIMIC 80-90 ºF

LTFW Temperature from

Condenser

AC/MIMIC 85-95 ºF

LTCW Inlet Pressure LOCAL 90-110 psig

LTCW Temperature to Evaporator AC/MIMIC 50-60 ºF

LTCW Water Temp from

Evaporator

AC/MIMIC 45-55 ºF

LTCW Outlet Pressure LOCAL 90-110 psig

Refrigerant Level LOCAL 6-9 in.

Motor Free End Bearing Oil Level LOCAL SAT

Motor Comp End Bearing Oil

Level

LOCAL SAT

EXAM TYPE

(e.g. monthly, annual, 36 month, etc.)

Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.

Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.

DEFICIENT ITEM,

CONDITION OR

FUNCTION

IMPACT: (SAFETY,

REGULATION, MISSION,

OR MATERIAL READINESS)

6 of 10 SWBS TEST NO. 50102

7 of 10 SWBS TEST NO. 50102

Figure 1. CHILL WATER SYSTEM

8 of 10 SWBS TEST NO. 50102

CHART 1 REFRIGERANT LOW TEMPERATURE DATA - PRESSURE CHART

9 of 10 SWBS TEST NO. 50102

CHART 2 REFRIGERANT LOW TEMPERATURE DATA – PRESSURE CHART

10 of 10 SWBS TEST NO. 50102

Figure 2. MIMIC PRINT SCREEN

1 of 3 SWBS TEST NO. 80206

SHIP & HULL NUMBER TEST MEMO SWBS TEST NO.

MCLEAN (T-AKE 12) PULPER 80206

ORGANIZATION PERFORMING

ASSESSMENT/TEST

ABSTRACT: This test memo assesses the condition and operation of the pulper. This test memo requires the pulper to be operated at sea.

DOCUMENTATION (REFERENCES)

REFERENCE PUBLICATION NO. TITLE

A S9593-C2-MMM-010 PULPER, LARGE NS DWG 593-6960300

B

ASSOCIATED SWBS TESTS/INSPECTIONS

SWBS NUMBER SWBS TEST TITLE

Instructions: If you respond “Yes” to any of the Parameter questions, enter the appropriate equipment identifier(s) in the Header Row. Attach copies of outstanding VRRs to this document.

PARAMETER YES/NO EQPT: EQPT: EQPT:

Are there unresolved VRRs prior to testing? If “Yes,” list them.

VRR: VRR: VRR:

Were VRRs generated after testing? If “Yes,” list them.

VRR: VRR: VRR:

Do any of the above listed

VRRs limit operation? If

“Yes,” list them.

PULPER CHECKS

GENERAL CHECKS

PARAMETER DESIGN OBSERVED SAT/UNSAT

Are operating placards posted on equipment

MARPOL 73/78 Annex V placard is posted nearby equipment

Is use of unit prevented in port? Signs posted to prevent use in port

Unit cleanliness Clean and good condition

2 of 3 SWBS TEST NO. 80206

Preservation Good condition

SAFETY DEVICES CHECKS

LOCAL STATUS INDICATOR

PARAMETER DESIGN OBSERVED SAT/UNSAT

“Don’t feed” red indicator light Operational

“Wait” amber indicator light Operational

“Feed” green indicator light Operational

Emergency stop push button Operational

Large pulper local status indicator Operational

MESSAGE DISPLAY UNIT:

Function status and control keys Operational

ELECTRICAL CONTROL ENCLOSURE:

Hours meter Operational

Timed start push button Operational

Timed stop push button Operational

Alarm acknowledge push button Operational

Emergency stop push button Operational

Audible alarm Operational

Motor current ammeter Operational

Power on white indicator Operational

Gauges Operational

OPERATION – AT SEA ONLY

PARAMETER DESIGN OBSERVED SAT/UNSAT

Pulper Processes 83.3 lbs of food waste in 5 minutes or less (999.6 lbs per hour)

Pulper Processes a 200 lb mix (100 lbs of food waste) in 20 minutes or less

Shutdown of pulper upon loss of firemain Verify

EXAM TYPE

(e.g. monthly, annual, 36 month, etc.)

Note: “Major” deficiencies are those that can significantly impact safety, regulation, mission, or the material readiness of the vessel.

Instructions: Provide a detailed description of the deficiency. Why it is considered “major.” The inspector’s professional opinion as to the cause of the deficiency. Recommended corrective actions.

DEFICIENT ITEM,

CONDITION OR

FUNCTION

IMPACT: (SAFETY,

REGULATION, MISSION,

OR MATERIAL READINESS)

3 of 3 SWBS TEST NO. 80206

File details come from the government source that posted it.