Attachment_T_-_Towing_Performance_Report.docx

DOCX document 18 KB Posted

Attached to
East Coast Towing & Salvage Tug Time Charter
Solicitation number
N32205-17-R-3505
Issued by

About this file

Attachment T - Towing Performance Report Template

View the file

Other files

File Type Posted
N32205-17-R-3505_Conformed_as_of_Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
Attachment_E_-PWS_-_Rev._3.docx DOCX document
Amendment_0002.pdf PDF
Q&A__2.pdf PDF
Attachment_E_-PWS_-_Rev._2.pdf PDF
Q&A__1.docx DOCX document
Attachment_B_-Basic_Pricing_Data_-_Rev._1.xlsx XLSX spreadsheet
Attachment_E_-PWS_-_Rev.1.docx DOCX document
Amendment_0001.pdf PDF
Attachment_P_-_Past_Performance.docx DOCX document
Attachment_I_-_CBR-D.docx DOCX document
Attachment_H_-_ATFP.docx DOCX document
Attachment_E_-PWS.docx DOCX document
Attachment_J_-_Ship_Security.docx DOCX document
Attachment_S_-_Tow_Plan.docx DOCX document
Attachment_D_-_DD_254.pdf PDF
Attachment__A_-GFP.docx DOCX document
Attachment_G_-_WD_2010-0147_Rev._5.pdf PDF
Attachment_R_-_CDRL.docx DOCX document
Attachment_B_-Basic_Pricing_Data.xlsx XLSX spreadsheet
Attachment_M_-_Boats_and_Craft_Dimensions.docx DOCX document
Attachment_F_-_SF_LLL.pdf PDF
Attachment_C_-_Crew_Complement.docx DOCX document
N32205-17-R-3505.pdf PDF
Attachment_Q_-_Tech_Submission.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT T

N32205-17-R-3505

TOWING PERFOMANCE REPORT

1. Towing Ship:

1. Departure Information – DTG / Location

1. Completion Information – DTG / Location

1. Actual Distance Towed:

1. Average SOA:

1. Vessel Towed:

5. Length

5. Beam

5. Draft – FWD / AFT / Mean

5. Deep Draft (Propellers)

5. Air Draft

5. Displacement Tonnage

5. KG

5. Freeboard – FWD / Midships / AFT

5. Casualties

8. Equipment

8. Personnel

5. Following in case of Casualty

1. Tow Course

1. Tow SOA

1. Ships RPM

1. Sea Direction

1. Sea Height

1. Wind Speed / Dir

1. Tow Wire Out

1. Catenary

1. Towline Tension prior to incident

1. Towing Rig

15. Bridles / Pendant / Number

15. Size of Wire / Chain and length

15. Connection Type

1. Secondary Tow Material / Size

16. Bridles / Pendant / Number

16. Size of Wire / Chain and length

16. Connection Type

1. Towing Machine

17. Type

17. Automatic / Manual

17. Average Line Pull

17. Scope of Wire / Hawser

17. Maximum Line Pull

17. Scope of Wire / Hawser at Max Pull

17. Post tow maintenance conducted on tow wire / hawser

17. Post tow maintenance conducted on tow machine

1. Recommendations for improving rigging of future tows, use of equipment or procedures.

1. Unfavorable weather conditions (conditions causing towing ship to deviate more than 40 degrees from base course)

1. General Comments

Military Sealift Command, Government Operations Safety Management Procedures Manual

7.12-001-ARS/ATF

Revision 2.1

Towing Procedures
Page 2 of 2

File details come from the government source that posted it. Updated .