J-3 Category B Items USNS BIG HORN ROH.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USNS BIG HORN (T-AO 198) ROH/DD
- Solicitation number
- N32205-16-R-4010
About this file
J-3 Category B Work Items
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO | 1 | DAY | |||||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | |||||||||||||
| 7.13 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | |||||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO | 10 | DAY | |||||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 10 | DAY | |||||||||||||
| 7.13 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 10 | DAY | |||||||||||||
| WI 025 SUBTOTAL | ||||||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 7.1 | Overhaul Management Team | 15 | DAY | |||||||||||||
| 7.2 | General Services For The Ship | 15 | DAY | |||||||||||||
| 7.3 | Telephone Services | 15 | DAY | |||||||||||||
| 7.4 | Project Planning and Monitoring | 15 | DAY | |||||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | DAY | |||||||||||||
| 7.6 | Delivery, Care and Redelivery of the Vessel | 15 | DAY | |||||||||||||
| 7.7 | Shipboard Access and Security | 15 | DAY | |||||||||||||
| 7.8 | Gas Free Certificates | 15 | DAY | |||||||||||||
| WI 030 SUBTOTAL | ||||||||||||||||
| 114 | STEEL REPLACEMENT | |||||||||||||||
| 7.1.1 | Provide a unit price per pound for steel plate replacement, up to a maximum of 10,000 pounds of steel plate total for all grades. | 10,000 | Pounds | |||||||||||||
| 7.1.2 | Provide a unit price per pound for rolled steel structural shapes, up to a maximum of 5,000 pounds of rolled steel structural shapes total for all grades. | 5,000 | Pounds | |||||||||||||
| 7.2.1 | Provide a unit price to vee out and re-weld one (1) 6” long or less cracked fillet weld, up to a maximum of fifty (50) cracked fillet welds. | 50 | Welds | |||||||||||||
| 7.2.2 | Provide a unit price to vee out and re-weld one (1) 7”–12” long cracked fillet weld, up to a maximum of fifty (50) cracked fillet welds. | 50 | Welds | |||||||||||||
| 7.3.1 | Provide a unit price to replace one (1) sounding tube striker plate, up to a maximum of twenty (20) striker plates. | 20 | Plates | |||||||||||||
| 7.4.1 | Provide a unit price to clad weld one (1) pit up to a maximum of twenty (20) pits. | 20 | Pits | |||||||||||||
| WI 114 SUBTOTAL | ||||||||||||||||
| 914 | ZINC ANODES REPLACEMENT | |||||||||||||||
| 7.2 (a.) | Provide a unit price for zinc anode: Type ZSS-12; up to a maximum of twenty (20) anodes. | 20 | Anodes | |||||||||||||
| 7.2 (b.) | Provide a unit price for zinc anode: Type ZHC-23; up to a maximum of twenty (20) anodes | 20 | Anodes | |||||||||||||
| 7.2 (c.) | Provide a unit price for zinc anode: Type ZHC-47; up to a maximum of twenty (20) anodes. | 20 | Anodes | |||||||||||||
| 7.2 (d.) | Provide a unit price for zinc anode: Type ZEP Style B; up to a maximum of twenty (20) anodes. | 20 | Anodes | |||||||||||||
| WI 914 SUBTOTAL | ||||||||||||||||
| 915 | DRY DOCKING CONTINUATION | |||||||||||||||
| 7.1 | Submit unit price per day up to a maximum of fifteen (15) days to continue all services in accordance with parent item 901 if directed. | 15 | Days | |||||||||||||
| WI 915 SUBTOTAL | ||||||||||||||||
| TOTALS | Total CAT "B" |
| &14USNS BIG HORN (T-AO 198) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N32205-16-R-4010 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .