Amendment_0002.docx
DOCX document 38 KB Posted
- Attached to
- USNS BIG HORN (T-AO 198) ROH/DD
- Solicitation number
- N32205-16-R-4010
About this file
Amendment 0002
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-16-R-4010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
USNS BIG HORN (T-AO 198)
ITEM NO. TITLE CATEGORY
SECTION 000- GENERAL REQUIREMENTS
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS AND DEFINITIONS | “NSP” | |||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | “NSP” | |||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | “NSP” | |||||||
| 004 | TESTING AND QUALITY ASSURANCE | “NSP” | |||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | “NSP” | |||||||
| 006 | HEAVY WEATHER PLAN | “NSP” | |||||||
| 007 | COLD WEATHER PLAN | “NSP” | |||||||
| 008 | NOT USED | ||||||||
| 009 | NOT USED | ||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | “A” | |||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | “A” | |||||||
| 012 | TELEPHONE SERVICES | “A” | |||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | “A” | |||||||
| 014 | PREPERATION OF WEIGHT AND MOMENT REPORT | “A” | |||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | “A” | |||||||
| 016 | FIRE PROTECTION AND SHIP’S SAFETY PROGRAM | “A” | |||||||
| 017 | HANDLING SHIP’S STORES | “A” | |||||||
| 018 | DELIVERY AND REDELIVERY OF THE VESSEL | “A” | |||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | “A” | |||||||
| 020 | GAS FREE CERTIFICATES | “A” | |||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | “A” | |||||||
| 022 | DOCK TRIALS AND SEA TRIALS | “A” | |||||||
| 023 | HAZARDOUS WASTE DISPOSAL | “A” | |||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | “NSP” | |||||||
| 025 | PHYSICAL SECUIRTY AT PRIVATE CONTRACTOR’S FACILITY | “B” | |||||||
| 030 | CONTINUATION OF SERVICES | “B” |
SECTION 100- HULL STRUCTURE
| 101 | NDT KING POSTS | “A” | ||||
| 103 | WEATHER DECK WATERTIGHT DOORS REV A | “A” | ||||
| 104 | INTERIOR DOORS AND FRAMES; REPLACE | “A” | ||||
| 105 | CARGO GEAR QUADRENNIAL RECERTIFICATION | “A” | ||||
| 107 | NON-SKID DECK RESURFACING | “A” | ||||
| 108 | TANK VENT PROTECTIVE DEVICE INSPECTION | “A” | ||||
| 109 | TANK INSPECTION FOR SHS 5 | “A” | ||||
| 110 | UT GAUGING FOR SHS 5 | “A” | ||||
| 111 | STRUCTURAL STEEL PLATE REPLACEMENT | “A” | ||||
| 114 | STEEL REPLACEMENT | “B” |
ITEM NO. TITLE CATEGORY
SECTION 200- MACHINERY, PROPULSION
| 201 | MAIN ENGINE SPARE PARTS OVERHAUL | “A” |
| 202 | REPLACE MAIN ENGINE TURBO CHARGERS | “A” |
| 203 | PROPULSION SHAFT BRAKE OVERHAUL | “A” |
SECTION 300- ELECTRICAL
| 301 | CLEANING SWITCHBOARDS AND CONTROL CENTERS | “A” | |||
| 302 | GENERATOR MAINTENANCE | “A” | |||
| 303 | PTO TECHNICAL REPRESENTATIVE | “A” | |||
| 304 | PORT AND STARBOARD PTO CLUTCH AND COUPLING OVERHAUL | “A” |
SECTION 400- COMMUNICATIONS AND NAVIGATIONAL AIDS
| 401 | RADAR/ECDIS MAINTENANCE | “A” | |||||
| 402 | NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | “A” | |||||
| 403 | GMDSS SAFETY RADIO CERTIFICATE | “A” | |||||
| 404 | SVDR RUTTER RECERTIFICATION | “A” | |||||
| 405 | RENEW ELECTRICAL SAFETY MATTING | “A” | |||||
| 406 | TV-DTS STUFFING TUBE TO MCT REPLACEMENT | “A” | |||||
| 407 | DOPPLER SPEED LOG PM | “A” | |||||
| 408 | FATHOMETER PM | “A” |
SECTION 500- MACHINERY, AUXILIARY SYSTEM
| 501 | AUXILIARY BOILER MAINTENANCE | “A” | ||||||
| 502 | SHIPS SERVICE AIR COMPRESSOR SERVICE GROOM | “A” | ||||||
| 503 | SCBA COMPRESSOR/REFILL STATION SERVICING/INSPECTION | “A” | ||||||
| 504 | ER OWS AND CARGO OCM GROOM | “A” | ||||||
| 505 | CONNEX BOX SERVICE | “A” | ||||||
| 506 | A/C AND REFRIGERATOR COMPRESSOR OVERHAUL | “A” | ||||||
| 507 | PRESSURE VESSEL AND RELIEF VALVE TESTING | “A” | ||||||
| 508 | REPALCE HOT WATER HEATER | “A” | ||||||
| 509 | RENEW 14 INCH CARGO EXPANSION JOINTS | “A” | ||||||
| 510 | T-AO CLASS FUEL SENSOR INSTALLATION | “A” | ||||||
| 511 | VARIOUS PUMP OVERHAUL | “A” | ||||||
| 512 | CARGO BALLAST AND ER FIRE/BALLAST PUMP OVERHAUL | “A” | ||||||
| 513 | EDG REPAIRS | “A” | ||||||
| 514 | INSRALLATION OF NEW LO PURIFIERS | “A” |
SECTION 600-OUTFIT, FURNISHING AND HABITABILITY
| 601 | FIREFIGHTING EQUIPMENT RECERTIFICATION | “A” | |||
| 602 | ELEVATOR RECERTIFICATION | “A” | |||
| 603 | LIFERAFT RECERTIFICATION | “A” | |||
| 604 | RESCUE BOAT RECERTIFICATION | “A” | |||
| 605 | RESCUE BOAT WINCH & DAVIT INSPECTION | “A” | |||
| 606 | LIFEBOAT RECERTIFICATION | “A” | |||
| 607 | LIFEBOAT WINCH & DAVIT INSPECTION | “A” | |||
| 608 | INSPECTION OF FIRE HOSES | “A” |
ITEM NO. TITLE CATEGORY
| 609 | INSPECTION OF AFFF HOSES | “A” | ||
| 610 | STATEROOM CARPET/TILE REPLACEMENT | “A” | ||
| 611 | HEAD AND SHOWER TERRAZZO REPLACEMENT | “A” | ||
| 612 | SCBA EQUIPMENT ANNUAL RECERTIFICATION | “A” | ||
| 613 | ACCOMMODATION LADDER WEIGHT TEST | “A” |
SECTION 800- HEATING, VENTILATION AND AIR CONDITIONING
| 801 | LAUNDRY VENTILATION SYSTEM CLEANING | “A” | |
| 802 | GALLEY VENTILIATION SYSTEM CLEANING | “A” | |
| 803 | BRIDGE, 06 LEVEL AND RADUI AIR HANDLER OVERHAULS | “A” | |
| 804 | CREWS MESS AIR HANFLER OVERHAUL | “A” |
SECTION 900- DRYDOCKING AND UNDOCKING
| 901 | DOCKING AND UNDOCKING | “A” | ||||
| 902 | PROPELLER SHAFT WEARDOWN | “A” | ||||
| 903 | RUDDER AND STERN EXAMINATION | “A” | ||||
| 904 | BILGE KEEL INSPECTION | “A” | ||||
| 905 | PROPELLER SYSTEM MAINTENANCE | “A” | ||||
| 906 | STERN TUBE SEALS | “A” | ||||
| 907 | UNDERWATER HULL CLEANING AND PAINTING | “A” | ||||
| 908 | CATHODIC PROTECTION SYSTEM | “A” | ||||
| 909 | ANCHOR CHAIN AND LOCKERS | “A” | ||||
| 910 | OVERHAULING SEA VALVES | “A” | ||||
| 911 | FREEBOARD PRESERVATION | “A” | ||||
| 912 | MARINE GROWTH INHIBITOR ANODES REV A | “A” | ||||
| 913 | STERN TAILSHAFT AND PROPELLER REPLACEMENT | “A” | ||||
| 914 | ZINC ANODES REPLACEMENT | “B” | ||||
| 915 | DRY DOCKING CONTINUATION | “B” |
SECTION 1000- UNREP EQUIPMENT
| 1001 | WINCH CONTROL BOOTH WINDOW REPLACEMENT | “A” | ||
| 1002 | SADDLE WINCH SEAL REPLACEMENT | “A” | ||
| 1003 | BAND BRAKE STATIONS 3 & 4 | “A” | ||
| 1004 | SADDLE WINCH FOUNDATION REFURBISHMENT | “A” | ||
| 1005 | HAULING WINCH BLOWER | “A” | ||
| 1006 | SLIDING BLOCK PLASTIC BUMBERS | “A” |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .