J-2 Category A Items USNS BIG HORN ROH.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- USNS BIG HORN (T-AO 198) ROH/DD
- Solicitation number
- N32205-16-R-4010
About this file
J-2 Category A Work Items
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | |||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | |||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | ||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | ||||||||||
| 012 | TELEPHONE SERVICES | ||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | ||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | ||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | ||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | ||||||||||
| 017 | HANDLING SHIP'S STORES | ||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | ||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | ||||||||||
| 020 | GAS FREE CERTIFICATES | ||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | ||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | ||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | ||||||||||
| 100 | HULL STRUCTURES | ||||||||||
| 101 | NDT KINGPOSTS | ||||||||||
| 103 | WEATHER DECK WATERTIGHT DOORS | ||||||||||
| 104 | INTERIOR DOORS AND FRAMES REPLACE | ||||||||||
| 105 | CARGO GEAR QUADRENNIAL SURVEY | ||||||||||
| 107 | NON-SKID DECK RESURFACING | ||||||||||
| 108 | TANKS VENT PROTECTIVE DEVICE INSPECT | ||||||||||
| 109 | TANK INSPECTION FOR SHS 5 | ||||||||||
| 110 | UT GAUGING FOR SHS 5 | ||||||||||
| 111 | STRUCTURAL STEEL REPLACEMENT | ||||||||||
| 200 | MAIN PROPULSION | ||||||||||
| 201 | MAIN ENGINE SPARE PARTS OVERHAUL | ||||||||||
| 202 | REPLACE MAIN ENGINE TURBO CHARGERS | ||||||||||
| 203 | PROPULSION SHAFT BRAKE OVERHAUL | ||||||||||
| 300 | ELECTRICAL | ||||||||||
| 301 | CLEANING SWITCHBOARDS AND CONTROLLERS | ||||||||||
| 302 | GENERATOR MAINTENANCE | ||||||||||
| 303 | PTO TECHNICAL REPRESENTATIVE | ||||||||||
| 304 | P&S PTO CLUTCH/COUPLING OVERHAUL | ||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | ||||||||||
| 401 | RADAR/ECDIS MAINTENANCE | ||||||||||
| 402 | NAVIGAT X GYRO SYSTEM PM | ||||||||||
| 403 | GMDSS SAFETY RADIO CERTIFICATE | ||||||||||
| 404 | SVDR RUTTER RECERTIFICATION | ||||||||||
| 405 | RENEW ELECTRICAL SAFETY MATTING | ||||||||||
| 406 | TV/DTS STUFFING TUBE TO MCT REPLACE | ||||||||||
| 407 | DOPPLER SPEED LOG PM | ||||||||||
| 408 | FATHOMETER PM | ||||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||
| 501 | AUXILIARY BOILER MAINTENANCE | ||||||||||
| 502 | SHIPS SERVICE AIR COMPRESSOR SERVICE | ||||||||||
| 503 | SCBA COMPRESSOR/REFILL STATION SERVICE | ||||||||||
| 504 | ER OWS AND CARGO OCM GROOM | ||||||||||
| 505 | CONNEX BOX SERVICE | ||||||||||
| 506 | A/C & REFRIG COMPRESSOR OVERHAUL | ||||||||||
| 507 | PRESSURE VESSEL AND RELIEF VALVE TESTING | ||||||||||
| 508 | REPLACE HOT WATER HEATER | ||||||||||
| 509 | RENEW 14 INCH CARGO EXPANSION JOINTS | ||||||||||
| 510 | T-AO CLASS FUEL SENSOR INSTALLATION | ||||||||||
| 511 | VARIOUS PUMP OVERHAULS | ||||||||||
| 512 | CARGO BALLAST AND ER FIRE/BALLAST PUMP OVERHAUL | ||||||||||
| 513 | EDG REPAIRS | ||||||||||
| 514 | INSTALLATION OF NEW LO PURIFIERS | ||||||||||
| 600 | HABITABILITY | ||||||||||
| 601 | FIREFIGHTING EQUIPMENT RECERTIFICATION | ||||||||||
| 602 | ELEVATOR RECERTIFICATION | ||||||||||
| 603 | LIFERAFT RECERTIFICATION | ||||||||||
| 604 | RESCUE BOAT RECERTIFICATION | ||||||||||
| 605 | RESCUE BOAT WINCH & DAVIT INSPECT | ||||||||||
| 606 | LIFEBOAT RECERTIFICATION | ||||||||||
| 607 | LIFEBOAT WINCH & DAVIT INSPECTION | ||||||||||
| 608 | INSPECTION OF FIRE HOSES | ||||||||||
| 609 | INSPECTION OF AFFF HOSES | ||||||||||
| 610 | STATEROOM CARPET/TILE REPLACEMENT | ||||||||||
| 611 | HEAD AND SHOWER TERRAZZO REPLACE | ||||||||||
| 612 | SCBA EQUIPMENT ANNUAL RECERT | ||||||||||
| 613 | ACCOMMODATION LADDER WEIGHT TEST | ||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | ||||||||||
| 801 | LAUNDRY VENTILATION SYSTEM CLEANING | ||||||||||
| 802 | GALLEY VENTILATION SYSTEM CLEANING | ||||||||||
| 803 | BRIDGE, 06 LEVEL AND RADIO AIR HANDLER OVERHAULS | ||||||||||
| 804 | CREWS MESS AIR HANDLER OVERHAUL |
| 900 | DRYDOCKING AND UNDOCKING |
| 901 | DOCKING AND UNDOCKING |
| 902 | PROPELLER SHAFT WEARDOWN |
| 903 | RUDDER AND STERN EXAMINATION |
| 904 | BILGE KEEL INSPECTION |
| 905 | PROPELLER SYSTEM MAINTENANCE |
| 906 | STERN TUBE SEALS |
| 907 | UNDERWATER HULL CLEANING AND PAINTING |
| 908 | CATHODIC PROTECTION SYSTEM |
| 909 | ANCHOR CHAIN AND LOCKERS |
| 910 | OVERHAULING SEA VALVES |
| 911 | FREEBOARD PRESERVATION |
| 912 | MARINE GROWTH INHIBITOR ANODES |
| 913 | STERN, TAILSHAFT AND PROPELLER REPLACEMENT |
| 1000 | UNREP EQUIPMENT |
| 1001 | WINCH CONTROL BOOTH WINDOW REPLACEMENT |
| 1002 | SADDLE WINCH SEAL REPLACEMENT |
| 1003 | BAND BRAKE STATIONS 3 & 4 |
| 1004 | SADDLE WINCH FOUNDATION REFURBISHMNET |
| 1005 | HAULING WINCH BLOWER |
| 1006 | SLIDING BLOCK PLASTIC BUMPER |
| TOTAL |
| USNS BIG HORN (T-AO 198) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-16-R-4010 |
ATTACHMENT J-2
File details come from the government source that posted it. Updated .