J-2 _CAT_A.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Mid Term Availabilty USNS JOHN LENTHALL Federal contract opportunity
- Solicitation number
- N32205-16-R-4006
About this file
J-2 CAT A
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-2, CAT A
| CATEGORY “A” ITEMS | Prime Labor Rate | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | |||||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | SUB Rate | LABOR PRICE | MATERIAL PRICE | OTHER COSTS | ODC | TOTAL LABOR HOURS | TOTAL MATERIAL | TOTAL PRICE |
| CATEGORY "A" | |||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | ||||||||||||
| 002 | Technical and Manufacture’s Representatives | ||||||||||||
| 003 | Approach, Berth, and Mooring Requirements | ||||||||||||
| 004 | Testing and Quality Assurance | ||||||||||||
| 005 | Electrical Safety Procedure Requirements | ||||||||||||
| 006 | Heavy Weather Plan | ||||||||||||
| 010 | Furnish Office for Overhaul Management Team (OMT) | ||||||||||||
| 011 | Furnish General Services (TAO) | ||||||||||||
| 012 | Telephone Services | ||||||||||||
| 013 | Project Planning and Production Status Monitoring Reports | ||||||||||||
| 014 | Preparation of Weight and Moment Report | ||||||||||||
| 015 | Integrated Logistics and GFM Support Requirements | ||||||||||||
| 016 | Fire Protection and Ship’s Safety Program | ||||||||||||
| 017 | Handling Ship’s Stores | ||||||||||||
| 018 | Delivery and Redelivery of the Vessel | ||||||||||||
| 019 | Shipboard Access and Security | ||||||||||||
| 020 | Gas Free Certificates | ||||||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams, and Spaces | ||||||||||||
| 022 | Dock and Sea trials | ||||||||||||
| 023 | Hazardous Waste Disposal at a Contractor’s Facility | ||||||||||||
| 024 | Physical Security at Private Contractor’s Facility | ||||||||||||
| 100 | HULL STRUCTURES | ||||||||||||
| 101 | Non-Destructive Testing (NDT) Kingpost Areas (ABS) | ||||||||||||
| 102 | Deck Non-Skid Renewal | ||||||||||||
| 104 | JP-5 Settler Tank Blasting & Recoating | ||||||||||||
| 106 | Tank Deck Overhead Mechanical Cleaning & Recoating | ||||||||||||
| 109 | AFT Mooring Main Deck Steel Replacement (ABS CS2941485-F) | ||||||||||||
| 110 | Pipe Outlet Steel Replacement | ||||||||||||
| 111 | Jacket Water Room Steel Deck Replacement | ||||||||||||
| 200 | MACHINERY, PROPULSION | ||||||||||||
| 201 | PME AND SME Connecting Rod Studs Replacement | ||||||||||||
| 202 | Main Engine Fuel Injection Pumps Overhaul | ||||||||||||
| 203 | Port Main Engine Clutch and Coupling | ||||||||||||
| 300 | ELECTRICAL | ||||||||||||
| 301 | Switchboards and Motor Controllers Cleaning | ||||||||||||
| 302 | Circuit Breaker Inspection & Repair | ||||||||||||
| 303 | Recondition AC Motors | ||||||||||||
| 304 | Weather deck Kick Pipe Repairs | ||||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | ||||||||||||
| 401 | RADAR-ECDIS Preventive Service (ABS) | ||||||||||||
| 402 | Gyro Compass Repeater System Annual | ||||||||||||
| 403 | GMDSS Recertification | ||||||||||||
| 404 | SVDR Replace and Certification | ||||||||||||
| 405 | Magnetic Compass Inspection & Alignment | ||||||||||||
| 408 | OE-82 UHF SATCOM Antenna Overhaul | ||||||||||||
| 409 | UHF SATCOM & LOS Transceiver Groom | ||||||||||||
| 410 | AN/WRN-6 GPS Removal | ||||||||||||
| 411 | NGW FBB Antenna Mount Renewal | ||||||||||||
| 412 | Collision Avoidance Radar Detector (CARD) Removal | ||||||||||||
| 413 | TVDTS System & Distribution Groom | ||||||||||||
| 414 | SAAB Automatic Identification System (AIS) Replacement T-ALT 16-0948 | ||||||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||||
| 501 | No. 4 SSDG Overhaul | ||||||||||||
| 502 | No. 4 SSDG Turbocharger Overhaul | ||||||||||||
| 503 | Port PTO CLUTCH AND COUPLING OVERHAUL | ||||||||||||
| 504 | NR. 2 & 3 Main Salt water Circulation Pump Overhaul | ||||||||||||
| 505 | Pressure Vessel Inspection and Hydro (ABS) | ||||||||||||
| 506 | Relief Vessel Relief Valve Overhaul | ||||||||||||
| 507 | Clayton Boiler Replacement | ||||||||||||
| 508 | Re- Gasket Jacket Water Coolers | ||||||||||||
| 509 | Cargo Oil Content Monitor Calibration | ||||||||||||
| 510 | Refrigeration & Air Conditioning Systems Repair & Groom | ||||||||||||
| 511 | Engine Room Oil Content Monitor Calibration | ||||||||||||
| 512 | Main Engine 1 &3 Lube Oil Pump Overhaul | ||||||||||||
| 515 | Incinerator Inspection and Maintenance | ||||||||||||
| 516 | Boiler Uptake Inspection Plates and Cleaning | ||||||||||||
| 517 | Gauge, Meter, Test& Measuring Equipment Calibration | ||||||||||||
| 600 | OUTFIT, FURNISHING AND HABITABILITY | ||||||||||||
| 601 | Annual Inspection & Repair of Fire Fighting Equipment | ||||||||||||
| 602 | Annual Inspection of Fire and AFFF Hoses | ||||||||||||
| 603 | Annual Life Raft Recertification | ||||||||||||
| 604 | Inspection & Repair of Lifeboats | ||||||||||||
| 605 | Inspection & Repair of Rescue Boats | ||||||||||||
| 606 | Port RHIB Davit Annual Servicing | ||||||||||||
| 607 | Annual SCBA Compressor/Refill Station Servicing | ||||||||||||
| 608 | Annual Inspection of SCBA Equipment | ||||||||||||
| 609 | Annual Personnel Elevator Recertification | ||||||||||||
| 610 | Annual Servicing Of Immersion Suites | ||||||||||||
| 615 | Annual Inspection of Accommodation Ladders | ||||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | ||||||||||||
| 801 | Ventilation Systems Cleaning | ||||||||||||
| 1000 | UNREP EQUIPMENT | ||||||||||||
| 1001 | Removal and Repair Of Saddle Winch Foundation & Motor Overhaul | ||||||||||||
| 1002 | Saddle winch frame require repair station 6 number 1 saddle winch | ||||||||||||
| 1003 | ASD, Ram Tensioner and Spanwire winch foundation repair sta. 1 and 2 | ||||||||||||
| 1004 | Spanwire winch ASD air module mounting frame replacement sta. 1 | ||||||||||||
| 1005 | Calibrate, inspect Ram tensioner and air flask relief valves | ||||||||||||
| 1006 | Overhaul ASD fan motors sta. 4 Highline sta. 6, 7 Spanwire winch and one spare | ||||||||||||
| 1007 | Saddle Winch Refurbishment | ||||||||||||
| 1008 | Station 4 High Line Winch Main and Replenishment Pump Overhaul | ||||||||||||
| 1009 | Manufacture ASD Shroud Assemble and Install | ||||||||||||
| 1010 | Replace ram tensioner accumulator support brackets bolts | ||||||||||||
| 1011 | Manufacture or Repair Winch Booth Door ,Door Hinges and Door Frame Jump Hinges |
TOTAL CAT "A"
| USNS HENRY J. KAISER FY 16 MTA | INDEPENDENT GOVERNMENT ESTIMATE |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-15-R-1008 |
USNS HENRY J. KAISER FY 16 MTA
File details come from the government source that posted it. Updated .