Q_4_Response.pdf

PDF 74 KB Posted

Attached to
2015 MTA on USNS YUKON
Solicitation number
N32205-15-R-1000
Issued by

About this file

Response to Question 4

View the file

Other files

File Type Posted
J-10_Interport_Differential_Revised.doc DOC document
Amendment_0002_USNS_YUKON.doc DOC document
Q_1_Response.pdf PDF
Q_3_Response.pdf PDF
Q_2_Response.pdf PDF
Q_5_Response.pdf PDF
N32205-15-R-1000-0001_AMENDMENT.pdf PDF
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1.1 _2-27-14).docx DOCX document
J-9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J-12 Past Performance Data.docx DOCX document
N104-15-R-1000_J A_Redacted.pdf PDF
J-10 Interport Differential.doc DOC document
N32205-15-R-1000_SOLICITATION.pdf PDF
J-3 Category B Items.xls XLS spreadsheet
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-8 Request for Spec Clarification.doc DOC document
J-6 WI 015 CDRL.pdf PDF
J-4 GFP - YUKON.pdf PDF
J-7 MSC Ship Repair Facility Survey.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-15-R-1000

USNS YUKON (T-AO 202)

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION

11/12/14

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: page 1 SF 33

PARAGRAPH / SECTION NO: 9

TITLE: Solicitation

QUESTION:

Please note that this solicitation was posted on Tuesday, October 28 th

. The bid due date is listed as Friday, November 28 th

. November 27 th and 28 th are Contractor’s holidays. Due to contractor’s mail room issues, contractor did not receive specifications, drawings and references until November 6 th

. Additionally, contractors on the West Coast must mail their proposals two business days before due date to ensure timely arrival.

This gives us 13 business days in which to accomplish a pre-proposal site visit on the

USNS Yukon in San Diego, review specifications and submit bidder’s questions, review amendment responses and assemble our proposal.

Contractor respectfully requests at minimum a one week extension to the request for clarification date and the submission due date.

ANSWER:

Solicitation was amended on 14 November 2014 to change submission due date as well as specification clarification question request date.