Q_2_Response.pdf

PDF 7 KB Posted

Attached to
2015 MTA on USNS YUKON
Solicitation number
N32205-15-R-1000
Issued by

About this file

Response to Question 2

View the file

Other files

File Type Posted
J-10_Interport_Differential_Revised.doc DOC document
Amendment_0002_USNS_YUKON.doc DOC document
Q_4_Response.pdf PDF
Q_1_Response.pdf PDF
Q_3_Response.pdf PDF
Q_5_Response.pdf PDF
N32205-15-R-1000-0001_AMENDMENT.pdf PDF
J-14_NON_DISCLOSRE_AGREEMENT_FOR_GOVN'T_TECHNICAL_DATA_(V1.1 _2-27-14).docx DOCX document
J-9 Disclosure of Lobbying Activities SF-LLL.doc DOC document
J-12 Past Performance Data.docx DOCX document
N104-15-R-1000_J A_Redacted.pdf PDF
J-10 Interport Differential.doc DOC document
N32205-15-R-1000_SOLICITATION.pdf PDF
J-3 Category B Items.xls XLS spreadsheet
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J-8 Request for Spec Clarification.doc DOC document
J-6 WI 015 CDRL.pdf PDF
J-4 GFP - YUKON.pdf PDF
J-7 MSC Ship Repair Facility Survey.doc DOC document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-15-R-1000

USNS YUKON (T-AO 202)

ATTACHMENT J - 8

REQUEST FOR SPECIFICATION CLARIFICATION

11/12/14

NAME OF CONTRACTOR:

SPECIFICATION ITEM NO.: 201

PARAGRAPH / SECTION NO: 7.1.2.2

TITLE: PORT AND STBD MAIN ENGINE 72,000 HOUR OVERHAUL

QUESTION:

Paragraph 7.2.8 Requires Cylinder liners to be overhauled, but these were not listed in Paragraph 7.1.2.2

Paragraph 7.2.19 Requires intercoolers to be disassembled, cleaned and hydro tested, but these were also not listed in paragraph 7.1.2.2

Please clarify.

ANSWER:

1. The contractor is responsible to accomplish what is stated in both para 7.2. 8 and 7.1.2.2. There is no requirement to have the liners listed in both sections.

2. Same answer as above. The contractor is responsible to accomplish both para.