J - 3 Category B Items .xls
XLS spreadsheet 52 KB Posted
- Solicitation number
- N32205-14-R-1001
About this file
Category B Excel Pricing Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GRUMMAN_AMEND_0004.doc | DOC document | |
| 0601B_A___Annual_Fire_Fighting_Recert.doc | DOC document | |
| Questions_and_Answers_No._2.docx | DOCX document | |
| J_-_2_Category_A_Items_-Revised_18_Dec.xls | XLS spreadsheet | |
| J_-_3_Category_B_Items_-_Revised_18_Dec.xls | XLS spreadsheet | |
| 0107B_B__Kingpost_Support_Bracket_TALT_0819_-_13.doc | DOC document | |
| Questions_and_Answers_No._1.docx | DOCX document | |
| 0909A_-_CRP_Propeller_Maintenance_and_15_Year_Tail_Shaft_Radius_Inspection_.doc | DOC document | |
| N32205-14-R-1001-0001.pdf | ||
| J-6 WI 015 CDRL.pdf | ||
| J -12 Past Performance Data.doc | DOC document | |
| J - 2 Category A Items.xls | XLS spreadsheet | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 8 Request for Spec Clarification.doc | DOC document | |
| J-13 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| USNS GRUMMAN ROH 2014 J4 FORM.pdf | ||
| J - 14 Dry Dock Evaluation Form.docx | DOCX document | |
| J - 7 MSC Ship Repair Facility Survey.doc | DOC document | |
| J - 10 Interport Differential.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | - 0 | $ - 0 | $0 | ||||||||||||
| 7.11 - CONDITION BRAVO - Cost to Establish | 1 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 7.11 - CONDITION BRAVO - Cost Per Day to Maintain | 10 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 7.12 - CONDITION CHARLIE - Cost to Establish | 1 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 7.12 - CONDITION CHARLIE - Cost Per Day to Maintain | 10 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 7.13 - CONDITION DELTA - Cost to Establish | 1 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 7.13 - CONDITION DELTA - Cost Per Day to Maintain | 10 | Day | - 0 | $ - 0 | $0 | |||||||||||
| 030 | CONTINUATION OF SERVICES | - 0 | $ - 0 | $0 | ||||||||||||
| 7.1 Overhaul Management Team Services | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.2 General Services for the Ship | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.3 Telephone Services | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.4 Project Planning and Monitoring | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.5 Fire Protection and Ship's Safety | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.6 Delivery, Care and Redelivery of the Vessel | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.7 Shipboard Access and Security | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| 7.8 Gas Free Certification | 15 | Days | - 0 | $ - 0 | $0 | |||||||||||
| SUBTOTAL: | - 0 | $ - 0 | $0 | |||||||||||||
| 100 | HULL STRUCTURE | |||||||||||||||
| 104 | ULTRASONIC THICKNESS GAUGING (ADDITIONAL READINGS) | 7,500 | EA | - 0 | $ - 0 | $0 | ||||||||||
| 105 | STRUCTURAL STEEL REPAIRS | - 0 | $ - 0 | $0 | ||||||||||||
| 7.1.1 Steel Plate Replacement | 10,000 | LBS | - 0 | $ - 0 | $0 | |||||||||||
| 7.1.2 Rolled Steel Structural Shapes | 5,000 | LBS | - 0 | $ - 0 | $0 | |||||||||||
| 7.2.1 6"Long or Less Cracked Filled Welds | 50 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.2.2 7"-12" Long Cracked Fillet Welds | 50 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.3.1 Sounding Tube Striker Plate | 25 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.4.1 2" X 2" Clad Welds | 50 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.4.2 4" X 4" Clad Welds | 50 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.4.3 6" X 6" Clad Welds | 50 | EA | - 0 | $ - 0 | $0 | |||||||||||
| SUBTOTAL: | - 0 | $ - 0 | $0 | |||||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||||||
| 913 | ZINC ANODE REPLACEMENT 7.2 | - 0 | $ - 0 | $0 | ||||||||||||
| (a.) Type ZSS-12 Anodes | 200 | EA | - 0 | $ - 0 | $0 | |||||||||||
| (b.) Type ZHC-23 Anodes | 100 | EA | - 0 | $ - 0 | $0 | |||||||||||
| (c.) Type ZHC-47 Anodes | 200 | EA | - 0 | $ - 0 | $0 | |||||||||||
| (d.) Type ZEP Style B Anodes | 100 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 914 | DRY-DOCKING AND UNDOCKING SHIP | 15 | DAYS | - 0 | $ - 0 | $0 | ||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||||||
| 1003 | FLIGHT DECK SAFETY NET FRAMES REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||||||
| 7.3.1 Safety Net Frame Without Opening on Bottom Edge | 27 | EA | - 0 | $ - 0 | $0 | |||||||||||
| 7.3.2 Safety Net Frame With Opening on Bottom Edge | 2 | EA | - 0 | $ - 0 | $0 | |||||||||||
| SUBTOTAL: | - 0 | $ - 0 | $0 | |||||||||||||
| TOTAL: CAT "B" | - 0 | $ - 0 | $0 |
&L&14USNS LEROY GRUMMAN (T-AO 195)&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS&R&14N32205-14-R-1001
&CATTACHMENT J-3
File details come from the government source that posted it. Updated .