AMENDMENT 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0601B_A___Annual_Fire_Fighting_Recert.doc | DOC document | |
| Questions_and_Answers_No._2.docx | DOCX document | |
| J_-_2_Category_A_Items_-Revised_18_Dec.xls | XLS spreadsheet | |
| J_-_3_Category_B_Items_-_Revised_18_Dec.xls | XLS spreadsheet | |
| 0107B_B__Kingpost_Support_Bracket_TALT_0819_-_13.doc | DOC document | |
| Questions_and_Answers_No._1.docx | DOCX document | |
| 0909A_-_CRP_Propeller_Maintenance_and_15_Year_Tail_Shaft_Radius_Inspection_.doc | DOC document | |
| N32205-14-R-1001-0001.pdf | ||
| J-6 WI 015 CDRL.pdf | ||
| J -12 Past Performance Data.doc | DOC document | |
| J - 2 Category A Items.xls | XLS spreadsheet | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 8 Request for Spec Clarification.doc | DOC document | |
| J-13 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| USNS GRUMMAN ROH 2014 J4 FORM.pdf | ||
| J - 14 Dry Dock Evaluation Form.docx | DOCX document | |
| J - 3 Category B Items .xls | XLS spreadsheet | |
| J - 7 MSC Ship Repair Facility Survey.doc | DOC document | |
| J - 10 Interport Differential.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0011 is added as follows:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Category "B" Work Item |
FFP
WI 107B - King Post Support Bracket (T-ALT T-AO 0819)
FOB: Destination
NET AMT
The following have been modified:
Section B - Supplies or Services and Prices
PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
CLIN 0001: CAT A Items – Complete Attachment J-2
CLIN 0002: AGR - The Offeror shall indicate the fully loaded man-hour Labor rate (including profit, QA, supervision, support functions). This rate will be used in evaluating the offeror's proposal and shall be the rate for pricing changes negotiated under the "Additional Requirements" clause up to the maximum number of man-hours specified herein. The contractor agrees that the number of manhours included in its price proposal for such AGR shall include only direct production manhours. For these purposes, direct production manhours are for skilled labor at the journeyman level expended in direct production as exemplified by the following functions:
Abrasive cleaning/blasting
Tank cleaning
Welding
Machinists (inside and outside)
Burning
Brazing
Carpentry
Electrical Work
Electronic Work
Shipfitting
Lagging
Painting
Boilermaking
Pipefitting
Sheetmetal Work
Engineering
Rigging
Staging/scaffolding
General Labor
Fire Watch
Direct production manhours will not include those functions (whether charged directly or indirectly by the offeror's accounting system) which are herein defined as support for production functions. Necessary support functions shall be considered to be included in the offeror's fully burdened rate for direct production manhours. Examples of support functions include:
Testing
Quality Assurance
Planning
Cleaning (except tank cleaning)
Material handling & Warehousing
Security
Surveying
Administration
Transportation
Purchasing staff
Lofting
Other indirect support
Supervision
CLIN 0003: - Other Direct Cost (ODCs): The rates proposed for profit and G&A on CLIN 0003 above shall be the same rates used by the Contractor in its responses to RFPs issued under the contract. The Contracting Officer will apply these rates to the ODCs for each RFP when it is negotiated and / or settled.
The base cost does not include the profit or G&A rates. Include the final figure that results when proposed G&A and profit rates are applied to the base price in your total price for offer evaluation purposes. (This does not include any material cost for Category “A” items. The material cost for Category “A” should be included under CLIN 0001).
CLINs 0004 to 0010 CAT B Items – Complete Attachment J-3
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
GENERAL REQUIREMENTS
Intent, Scope, General Conditions and Definitions
Technical Representatives
Approach Berth Mooring
Testing and Quality Assurance
Electrical Safety Procedure Requirements
Heavy Weather Plan
Cold Weather Plan
Furnish Office for Overhaul Management Team (OMT)
Furnish General Services (TAO)
Telephone Services
Project Planning and Production Status Monitoring Reports
Weight and Moment Report
Integrated Logistics and GFM Support Requirements
Fire Protection and Ship’s Safety Program
Handling Ship’s Stores
Delivery and Redelivery of the Vessel
Shipboard Access and Security
Gas Free Certificates
Clean and Gas Free Tanks, Voids, Cofferdams, and Spaces
Dock and Sea trials
Hazardous Waste Disposal at a Contractor’s Facility
Physical Security at Contractor’s Facility Physical Security at Contractor’s Facility (Category “B” work item)
030 Continuation of Services (Category “B” work item)
HULL STRUCTURE
Non-Destructive Testing (NDT) Kingpost Areas (ABS)
Tank Rafting & Inspections (ABS Intermediate Survey)
Ultrasonic Thickness Gauging (ABS Intermediate Survey)
Ultrasonic Thickness Gauging (Additional Readings) (Category “B” work item)
Structural Steel Repairs (Category “B” work item)
After Peak Ballast Tank Recoat RAS And FAS Kingpost Support Brackets (T-ALT T-AO 0819) (Revised)
110 Cofferdam Steel Replacement Main Deck Frame 60
Steel Deck Repairs 06 Weather Deck
113 Prime and Paint Tank Deck Over Head Frame 47-60 114 Prime and Paint Spare Hose Rack Frames 47-51
115 No.7 Roller Curtain Door Replacement
Escape Scuttle Replacement
MACHINERY, PROPULSION
202 STBD Main Engine Clutch and Coupling Overhaul (ABS)
Main Engine Fuel Injector Overhaul
Replace PME & SME Exhaust Pipe End Thrust Stud Replace
ELECTRICAL
Circuit Breaker Inspection and Repair
DG PTO Generator Reverse Power Relays Maintenance Recondition Ventilation Fans and Motors Recondition Various Electrical Motors (Revision A) GE Main Engine Console Groom ERC UPS Replacement
Recondition NO.4 Portside Topping Winch Motor
COMMUNICATION AND NAVIGATION EQUIPMENT
RADAR/ECDIS Preventive Maintenance
Gyro System Preventive Maintenance GMDSS Annual Certification (ABS)
S-VDR Recertification (ABS)
Magnetic Compass Inspection and Alignment (ABS)
Antenna Groom (Revision A)
OE-82 Antenna Groom
URT-23 Radio Overhaul
WSC-3 Satellite Transmitter Groom
AIM S MK XII IFF System Up-Grade
MACHINERY, AUXILIARY
SSDG No. 3 & 4 Preventative Maintenance Oil Mist Detector Upgrade
Zone 1 AFFF Piping Replacement
Helo Foam Piping Replacement Oil Content Monitor Calibration and Survey
Clayton Boiler Annual Maintenance
Steering Gear Overhaul
No.4 Lube Oil Cooler Clean and Repair Overhaul Tank Vent Valves (ABS)
Relief Valve Overhaul
512 Replace No.1 and No.2 Boiler Exhaust Expansion Joints
No.1 Jacket Water Pump Overhaul
Incinerator Maintenance Overhaul No.1 and No.2 Anchor Windlasses Pumps and Motor’s (Revision B) CONEX Box Replacement
Refrigeration Repair & Air conditioning Systems Repair and Groom
Oily Waste Steam Heater Coil Replacement
Main Reduction Gear Inspection
STBD Side CT fairlead Overhaul
OUTFIT, FURNISHING AND HABITABILITY
Annual Inspection of Fire Fighting Equipment (Revision B)
Annual Inspection of Fire & AFFF Hoses (ABS)
Annual Life Raft Recertification(ABS)
Annual Personnel Elevator Recertification & PLC Upgrade
Inspection & Repair of Lifeboats(ABS)
Fall Blocks and Fairlead Sheaves
Inspection & Repair of Rescue Boats
(ABS)
Service and Inspect Allied Rescue Boat Davit(ABS)
Annual SCBA Compressor / Refill Station Servicing
Annual Inspection of SCBA Equipment
Visual Inspection of Accommodation Ladders (ABS)
Joiner Bulkhead Panel Replacement
Terrazzo Deck Covering Replacement (Revision A)
Carpet & Tile Replacement
MRD 5850 Davit Inspection/Repair and Preservation (Revision A)
HEATING, VENTILATION AND AIR CONDITIONING
Galley Range Exhaust System Cleaning
DRYDOCKING AND UNDOCKING
Dry-Docking and Undocking Ship
Hull Cleaning And Painting
Anchors and Chains Cleaning and Painting
Overhauling Sea Valves
Marine Growth Inhibit Anode Replacement
Rudder and Stern Frame Examination
Inspection of Bilge Keels
Cathodic Protection System Maintenance
CRP Propeller Maintenance
Stern Tube Seal Maintenance
Spur Line & Net Cutter
912 Port and STBD Rudder Bearing, Replacement Zinc Anode Replacement (Category “B” work item)
Dry-Docking and Undocking Ship (Category “B” work item)
UNREP EQUIPMENT
Un-Rep Probe Refurbishment
Flight Deck Safety Nets & Frame Repair
Flight Deck Safety Net Frames Replacement (Category “B” work item) Flight Deck Non-Skid Renewal
Sliding Block Upper Drive Sprockets and Pillow Block Bearings
1006 Manufacture /Replace Hauling Winch Labyrinth Rings
Refurbish Saddle Winch Electric Motor/ Brake Repair Gypsy Winch Electric Motor Power Cable Kick Pipe and Cable
1009 Replace Winch Booth Windows
Replace Saddle Winch Foundation Fitted Bolts Replace Saddle Winch Foundation Non- Fitted Bolts Saddle Winch Electric Motor Repairs
Replace Span Wire Winch Drum Band Brake
Hauling Winch ASD Cooling Fan Motor Overhaul and Shroud Replacement
The following have been deleted:
REVSION TO WORK ITEM 613
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0011:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
The following have been modified:
SUMMARY OF ATTACHED DOCUMENTS
WORK ITEM ATTACHMENTS:
WORK ITEM 0107 B (REVISED) – King Post Support Bracket (T-ALT T-AO 0819 – Changed to a Category “B” work item – See attached work item (1).
WORK ITEM 0601 B (REVISED) – Annual Inspection of Fire Fighting Equipement – Change to CFM - See attached work item (2).
WORK ITEM 0516 B (REVISED) – Overhaul Anchor Windlass Pumps and Motors – Note paragraph 5.4 – See attached work item (3).
REVISED J-2 to delete and revise listed work items – See attached document (4).
REVISED J-3 to include correct pricing for Work Item 025 and add Work Item 107 B– See attached document (5).
Section J - List of Documents, Exhibits & Other Attachments
CLAUSES INCORPORATED BY FULL TEXT
The following documents, exhibits, and other attachments that will form a part of this contract are as follows:
ATTACHMENT
NUMBER
TITLE/DESCRIPTION
NO. OF PAGES
J-1 Work Item Package (Specifications) Separate Attachment
J-2 Contractor Price Breakdown - Category A Items 5 (Revised)
J-3 Contractor Price Breakdown – Category B Items 2 (Revised)
J-4
Government Furnished Material List
J-5
Reserved
J-6
Contract Data Requirements List (CDRL) WI 015
J-7
MSC Ship Repair Facility Survey
J-8
Request for Specification Clarification
J-9
Disclosure of Lobbying Activities (SF-LLL)
J-10
Interport Differential
J-12
Past Performance Data Sheet
J-13
Past Performance Questionaire
J-14
MSC Drydock Evaluation Form
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS
The following have been modified:
L –2
REQUIREMENTS FOR SUBMISSION OF PROPOSALS
The offeror shall submit a technical and a price proposal that shall include, at a minimum:
(a) General: Separate sealed volumes must be submitted with your offer: (1) Price/Past Performance and the Solicitation/Offeror, signed and completed, and (2) Technical. Submit original and four (4) copies each of the Technical Proposal. Submit original and one (1) copy each of the Price Proposal and the Past performance submittal. Offeror shall submit one (1) original, marked “Original” and one (1) copy, each in a separate three ring binder with the following:
1.
Signed SF33, to include acknowledgement of amendments, as applicable
2.
Section B – Supplies or Services and Prices
3.
Itemized breakdown of price on the form(s) provided in Attachments J-2 and J-3
4.
Subcontracting Plan (applicable if the offeror is a large business (Attachment J-8)
Additionally, offerors shall submit one (1) copy of the Technical Proposal and one (1) copy of the Price Proposal and Past Performance submittal on CD-ROM disc. Offerors shall ensure that proposal disks are virus free, and free of password protection. If access to proposal data is prohibited due to viruses, passwords, wrong format, the offer may be considered unacceptable.
(b) Offerors shall submit complete Representations and Certifications, including those incorporated by reference.
(c) Facsimile proposals will not be accepted.
(d) All questions concerning the solicitation shall be addressed to the Contracting Specialist identified below via email:
Melanie.Barrett@navy.mil
(e) Offerors shall submit their proposals to the following address:
Military Sealift Command
Attn: Melanie.Barrett (N104-5)
471 C Street, Bldg SP 64
Naval Station Norfolk, VA 23511-2419
Volume I: Price / Past Performance / and Subcontracting (as applicable)
Offerors shall submit prices in the format specified on the Contractor Price Breakdown forms of this solicitation, Attachment J-2 and J-3. Each specification Item Number must be either priced or marked “Not Separately Priced (NSP)”.
Overall Price. Unit prices and extended prices must be submitted as indicated, except “Not Separately Priced” items.
Offerors shall include any costs associated with third party access to the contractor’s facility, including costs for badges, safety orientation instruction, and/or parking, in the price proposal under the Shipboard Access and Security Item. For estimating purposes, offerors shall assume that (1) the Government will require access, to include safety orientation instruction and parking at the shipyard facility, for thirty individuals for the entire duration of the performance period; and (2) 20% of the badges issued to the government and third party personnel will be lost/misplaced and will require replacement.
Offerors shall include the Hazardous Waste Handling Fee rate per SWI 0023 Hazardous Waste Disposal at a Contractor’s Facility; and the unit price per Kilowatt Hour for electrical power, the unit price per gallon potable water, and the unit price per gallon of distilled water per work item 011 on the Section B part of the solicitation.
The contractor agrees that its manhour rate for the 10,000 manhours of the “Additional Government Requirements” includes the complete and full compensation to which it is entitled, including, but not limited to, compensation for all the direct labor costs, (e.g. straight time, overtime, premium time, shift differential, holiday time, standby time, etc.) for performing the Additional government Requirements, as well as compensation for acceleration, delay and disruption and other impact, if any, to the aforementioned work items, to work performed under any other Government contract and to any work in progress for the Government. The contractor further agrees that it is not entitled to a time extension to the delivery date of any ship under a Government contract by reason or as of a result of the ordering of the 10,000 manhours of “Additional Government Requirements”.
“Additional Government Requirements” does not include work performed pursuant to the clause of this contract entitled “Inspection of and Manner of doing work”, “Guarantees”, or other contract provision relating to the correction of defects.
Past Performance
Offerors are requested to provide information up to three (3) previous Government contacts whose effort is/was recent and relevant to the effort required by this solicitation.
a.
“Recent” is defined as a contract in-progress or completed within the last three (3) years. If the offeror has not had three (3) Government contracts within the last three (3) years, information on recent and relevant subcontracts and/or commercial contracts may be submitted.
b.
“Relevant” is defined as a contract that is of similar scope, magnitude, complexity to the requirements as set forth in this solicitation.
i.
Scope: Experience in the areas defined in the PWS.
ii.
Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the PWS.
iii.
Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the effors in its submitted contracts to the PWS. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).
A Past Performance Data Sheet (Attachment J-12) is requested to be submitted for each contract to be considered as past performance. Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract; and the role performed, including whether the offeror acted as a prime contractor or a subcontractor. Offeors are responsible for the accuracy of all data provided. Past performance information regarding predecessor companies, key personnel who have relevant experience and subcontractors that will perform major or critical aspects of the requirement may be provided as past performance submissions.
For each of the contracts the offeror describes in a Performance Data Sheet (Attachment J-12), the offeror is request to provide a Past Performance Questionnaire (Attachment J-13) to a reference at the organization that awarded the contractor. It is requested that the reference, not the offeror, email or fax the completed past performance Questionnaire BEFORE THE DUE DATE FOR PROPOSALS directly to Melanie Barrett, Military Sealift Command, 471 East C Street, Naval Station Norfolk, VA 23511-2419, email to Melanie.Barrett@navy.mil or fax to 757-443-5982. The offeror, NOT THE GOVERNMENT, is responsible for ensuring the Government receives a sufficient number of questionnaires.
All offerors are required to address historical compliance with the requirements of FAR Part 52.219-8 Utilization of Small Business Concerns) in the Performance Data Sheet.
Volume II: Technical Proposal
The technical proposal will be the basis for assessing the offeror’s ability to understand and perform the tasks in the solicitation. Section M of the solicitation outlines the evaluation factors and defines the source selection evaluation criteria for evaluating the technical proposal. The technical proposal is limited to fifty (50) pages excluding appendices. A legible, neat, orderly and comprehensive proposal is required. Data should be presented in Evaluation Factor sequence (1.0-3.0) and paragraph numbering in the proposal submitted should coincide with the numbering system set forth in Section M. Failure to respond to any one of the evaluation factors may result in disqualification of the proposal.
The technical proposal must demonstrate an understanding of and an ability to meet all of the requirements covered in the specification. The proposal should be sufficiently complete to demonstrate how the offeror will comply with government directions and requirements throughout the performance period. Data previously submitted, or presumed to be known, i.e., descriptions of previous projects performed for the government, cannot be considered as a part of the proposal unless physically incorporated in the proposal.
All information must be presented in sufficient depth for the government to make a comprehensive evaluation of the offeror’s understanding of the work package and of the offeror’s capability to successfully perform the work package.
The proposal should demonstrate this understanding and capability in a concise, logical manner and should not contain superfluous material not directly related to the solicitation.
(End of Summary of Changes)