J - 2 Category A Items.xls
XLS spreadsheet 70 KB Posted
- Solicitation number
- N32205-14-R-1001
About this file
Category A Excel Pricing Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GRUMMAN_AMEND_0004.doc | DOC document | |
| 0601B_A___Annual_Fire_Fighting_Recert.doc | DOC document | |
| Questions_and_Answers_No._2.docx | DOCX document | |
| J_-_2_Category_A_Items_-Revised_18_Dec.xls | XLS spreadsheet | |
| J_-_3_Category_B_Items_-_Revised_18_Dec.xls | XLS spreadsheet | |
| 0107B_B__Kingpost_Support_Bracket_TALT_0819_-_13.doc | DOC document | |
| Questions_and_Answers_No._1.docx | DOCX document | |
| 0909A_-_CRP_Propeller_Maintenance_and_15_Year_Tail_Shaft_Radius_Inspection_.doc | DOC document | |
| N32205-14-R-1001-0001.pdf | ||
| J-6 WI 015 CDRL.pdf | ||
| J -12 Past Performance Data.doc | DOC document | |
| J - 9 Disclosure of Lobbying Activities SF-LLL.doc | DOC document | |
| J - 8 Request for Spec Clarification.doc | DOC document | |
| J-13 PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| USNS GRUMMAN ROH 2014 J4 FORM.pdf | ||
| J - 14 Dry Dock Evaluation Form.docx | DOCX document | |
| J - 3 Category B Items .xls | XLS spreadsheet | |
| J - 7 MSC Ship Repair Facility Survey.doc | DOC document | |
| J - 10 Interport Differential.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL CONDITIONS, AND DEFINITIONS | NSP | ||||||||||
| 002 | TECHNICAL REPRESENTATIVES | NSP | ||||||||||
| 003 | APPROACH BERTH MOORING | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN | NSP | ||||||||||
| 007 | COLD WEATHER PAN | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | - 0 | $ - 0 | $0 | ||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | - 0 | $ - 0 | $0 | ||||||||
| 012 | TELEPHONE SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS | - 0 | $ - 0 | $0 | ||||||||
| 014 | WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIP'S STORES | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | - 0 | $ - 0 | $0 | ||||||||
| 022 | DOCK AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | - 0 | $ - 0 | $0 | ||||||||
| 024 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| HULL STRUCTURES | ||||||||||||
| 101 | NON-DESTRUCTIVE TESTING (NDT) KINGPOST AREAS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 102 | TANK RAFTING & INSPECTIONS (ABS INTERMEDIATE SURVEY) | - 0 | $ - 0 | $0 | ||||||||
| 103 | ULTRASONIC THICKNESS GAUGING (ABS INTERMEDIATE SURVEY) | - 0 | $ - 0 | $0 | ||||||||
| 106 | AFTER PEAK BALLAST TANK RECOAT | - 0 | $ - 0 | $0 | ||||||||
| 107 | RAS AND FAS KINGPOST SUPPORT BRACKETS | - 0 | $ - 0 | $0 | ||||||||
| 108 | DECK NON-SKID REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 109 | PUMP ROOM BILGE AND TANK TOP PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 110 | COFFERDAM STEEL REPLACEMENT MAIN DECK FRAME 60 | - 0 | $ - 0 | $0 | ||||||||
| 111 | ENGINE ROOM BILGE PRESERVATION | - 0 | $ - 0 | $0 | ||||||||
| 112 | STEEL DECK REPAIRS 06 WEATHER DECK | - 0 | $ - 0 | $0 | ||||||||
| 113 | PRIME AND PAINT TANK DECK OVERHEAD FRAME 47-60 | - 0 | $ - 0 | $0 | ||||||||
| 114 | PRIME AND PAINT SPARE HOSE RACK FRAMES 47-51 | - 0 | $ - 0 | $0 | ||||||||
| 115 | NO. 7 ROLLER CURTAIN DOOR REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 116 | ESCAPE SCUTTLE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201 | MAIN ENGINE FUEL PUMP OVERHAUL (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 202 | STARBOARD MAIN ENGINE CLUTCH AND COUPLING OVERHAUL (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 203 | MAIN ENGINE FUEL INJECTOR OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 204 | REPLACE PME & SME EXHAUST PIPE END THRUST STUD REPLACE | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | CIRCUIT BREAKER INSPECTION AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 302 | SWITCH BOARD & MCC CLEANING | - 0 | $ - 0 | $0 | ||||||||
| 303 | DG PTO GENERATOR REVERSE POWER RELAYS MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 304 | RECONDITION VENTILATION FANS AND MOTORS | - 0 | $ - 0 | $0 | ||||||||
| 305 | RECONDITION VARIOUS ELECTRICAL MOTORS | - 0 | $ - 0 | $0 | ||||||||
| 306 | GE MAIN ENGINE CONSOLE GROOM | - 0 | $ - 0 | $0 | ||||||||
| 307 | ERC UPS REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 308 | CARGO SYSTEM CABLE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 309 | CARGO CONSOLE SYSTEM MECHANICAL SUPPORT | - 0 | $ - 0 | $0 | ||||||||
| 310 | CARGO CONSOLE SYSTEM PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 311 | RECONDITION NO. 4 PORTSIDE TOPPING WINCH MOTOR | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | RADAR /ECDIS PREVENTIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 402 | GYRO SYSTEM PREVENTIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 403 | GMDSS ANNUAL CERTIFICATION (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 404 | S-VDR RECERTIFICATION (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 405 | MAGNETIC COMPASS INSPECTION AND ALIGNMENT (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 406 | ANTENNA GROOM | - 0 | $ - 0 | $0 | ||||||||
| 407 | OE-82 ANTENNA GROOM | - 0 | $ - 0 | $0 | ||||||||
| 408 | URT-23 RADIO OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 409 | WSC-3 SATELLITE TRANSMITTER GROOM | - 0 | $ - 0 | $0 | ||||||||
| 410 | AIM S MK XII IFF SYSTEM UP-GRADE | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501 | SSDG NO. 3 & 4 PREVENTATIVE MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 502 | OIL MIST DETECTOR UPGRADE | - 0 | $ - 0 | $0 | ||||||||
| 503 | ZONE 1 AFFF PIPING REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 504 | HELO FOAM PIPING REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 505 | OIL CONTENT MONITOR CALIBRATION AND SURVEY | - 0 | $ - 0 | $0 | ||||||||
| 506 | CLAYTON BOILER ANNUAL MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 507 | STEERING GEAR OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 508 | GRAY WATER SYSTEM INSTALLATION | - 0 | $ - 0 | $0 | ||||||||
| 509 | NO. 4 LUBE OIL COOLER CLEAN AND REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 510 | OVERHAUL TANK VENT VALVES (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 511 | RELIEF VALVE OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 512 | REPLACE NO. 1 AND NO. 2 BOILER EXHAUST EXPANSION JOINTS | - 0 | $ - 0 | $0 | ||||||||
| 513 | NO. 1 JACKET WATER PUMP OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| 514 | INCINERATOR MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 516 | OVERHAUL NO. 1 AND NO. 2 ANCHOR WINDLASSES PUMPS AND MOTORS | - 0 | $ - 0 | $0 | ||||||||
| 517 | CONEX BOX REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 518 | REFRIGERATION REPAIR & AIR CONDITIONING SYSTEMS REPAIR AND GROOM | - 0 | $ - 0 | $0 | ||||||||
| 520 | OILY WASTE STEAM HEATER COIL REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 521 | MAIN REDUCTION GEAR INSPECTION | - 0 | $ - 0 | $0 | ||||||||
| 522 | STARBOARD SIDE CT FAIRLEAD OVERHAUL | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | ANNUAL INSPECTION OF FIRE FIGHTING EQUIPMENT | - 0 | $ - 0 | $0 | ||||||||
| 602 | ANNUAL INSPECTION OF FIRE & AFFF HOSES (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 603 | ANNUAL LIFE RAFT RECERTIFICATION (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 604 | ANNUAL PERSONNEL ELEVATOR RECERTIFICATION & PLC UPGRADE | - 0 | $ - 0 | $0 | ||||||||
| 605 | INSPECTION & REPAIR OF LIFEBOATS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 606 | FALL BLOCKS AND FAIRLEAD SHEAVES | - 0 | $ - 0 | $0 | ||||||||
| 607 | INSPECTION & REPAIR OF RESCUE BOATS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 608 | SERVICE AND INSPECT ALLIED RESCUE BOAT DAVIT (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 609 | ANNUAL SCBA COMPRESSOR / REFILL STATION SERVICING | - 0 | $ - 0 | $0 | ||||||||
| 610 | ANNUAL INSPECTION OF SCBA EQUIPMENT | - 0 | $ - 0 | $0 | ||||||||
| 611 | VISUAL INSPECTION OF ACCOMMODATION LADDERS (ABS) | - 0 | $ - 0 | $0 | ||||||||
| 612 | JOINER BULKHEAD PANEL REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 613 | TERRAZZO DECK COVERING REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 614 | CARPET & TILE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | GALLEY RANGE EXHAUST SYSTEM CLEANING | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 900 | DRYDOCKING AND UNDOCKING | |||||||||||
| 901 | DRY-DOCKING AND UNDOCKING SHIP | - 0 | $ - 0 | $0 | ||||||||
| 902 | HULL CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 903 | ANCHORS AND CHAINS CLEANING AND PAINTING | - 0 | $ - 0 | $0 | ||||||||
| 904 | OVERHAULING SEA VALVES | - 0 | $ - 0 | $0 | ||||||||
| 905 | MARINE GROWTH INHIBIT ANODE REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| 906 | RUDDER AND STERN FRAME EXAMINATION | - 0 | $ - 0 | $0 | ||||||||
| 907 | INSPECTION OF BILGE KEELS | - 0 | $ - 0 | $0 | ||||||||
| 908 | CATHODIC PROTECTION SYSTEM MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 909 | CRP PROPELLER MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 910 | STERN TUBE SEAL MAINTENANCE | - 0 | $ - 0 | $0 | ||||||||
| 911 | SPUR LINE & NET CUTTER | - 0 | $ - 0 | $0 | ||||||||
| 912 | PORT AND STARBOARD RUDDER BEARING REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| - 0 | $ - 0 | $0 | ||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | UN-REP PROBE REFURBISHMENT | - 0 | $ - 0 | $0 | ||||||||
| 1002 | FLIGHT DECK SAFETY NETS & FRAME REPAIR | - 0 | $ - 0 | $0 | ||||||||
| 1004 | FLIGHT DECK NON-SKID RENEWAL | - 0 | $ - 0 | $0 | ||||||||
| 1005 | SLIDING BLOCK UPPER DRIVE SPROCKETS AND PILLOW BLOCK BEARINGS | - 0 | $ - 0 | $0 | ||||||||
| 1006 | MANUFACTURE / REPLACE HAULING WINCH LABYRINTH RINGS | - 0 | $ - 0 | $0 | ||||||||
| 1007 | REFURBISH SADDLE WINCH ELECTRIC MOTOR / BRAKE | - 0 | $ - 0 | $0 | ||||||||
| 1008 | REPAIR GYPSY WINCH ELECTRIC MOTOR POWER CABLE KICK PIPE AND CABLE | - 0 | $ - 0 | $0 | ||||||||
| 1009 | REPLACE WINCH BOOTH WINDOWS | - 0 | $ - 0 | $0 | ||||||||
| 1010 | REPLACE SADDLE WINCH FOUNDATION FITTED BOLTS | - 0 | $ - 0 | $0 | ||||||||
| 1011 | REPLACE SADDLE WINCH FOUNDATION NON-FITTED BOLTS | - 0 | $ - 0 | $0 | ||||||||
| 1012 | SADDLE WINCH ELECTRIC MOTOR REPAIRS | - 0 | $ - 0 | $0 | ||||||||
| 1013 | REPLACE SPAN WIRE WINCH DRUM BAND BRAKE | - 0 | $ - 0 | $0 | ||||||||
| 1014 | HAULING WINCH ASD COOLING FAN MOTOR OVERHAUL AND SHROUD REPLACEMENT | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&LUSNS LEROY GRUMMAN (T-AO 195)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-14-R-1001
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .