Amendment 3_Sec J Att 27_NCTAMS RFP_Site Visit QA_09June2023_No.2.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
NCTAMS PACIFIC COMMUNICATIONS SYSTEMS OPERATIONS AND MAINTENANCE REQUEST FOR PROPOSAL (RFP) NOTICE
Solicitation number
N0060423R0002
Issued by

View the file

Other files

File Type Posted
Amendment 4_Sec J Att 28_NCTAMS RFP_Site Visit QA_09June2023_No.3.xlsx XLSX spreadsheet
N0060423R0002-0004 SF33 CONFORM COPY.pdf PDF
N0060423R0002-0004 SF30.pdf PDF
Amendment 3_Sec J Att 22_SBParticipationCommitmentDocTemplate.docx DOCX document
N0060423R0002-0003 SF30.pdf PDF
Amendment 3_Sec J Att 11_PACRIM PWS.pdf PDF
Amendment 3_Sec J Att 2_DD Form 254.pdf PDF
N0060423R0002-0002 SF30.pdf PDF
Amendment 1_Sec J Att 2-13_15_17-23.zip ZIP file
Amendment 1_Sec J Att 26_NCTAMS Site Visit Materials.pdf PDF
Amendment 1_Sec J Att 11_PACRIM PWS.pdf PDF
Amendment 1_Sec J Att 25_NCTAMS Synopsis Draft RFP QA_23May2023_No.1.xlsx XLSX spreadsheet
N0060423R0002-0001 SF30.pdf PDF
Sec J Att 14_Site Inventories.zip ZIP file
Sec J Att 14_Master GFE Inventory PACRIM.pdf PDF
Sec J Att 16_SATCOM Safety HEMP Maintenance.zip ZIP file
Sec J Att 16_SATCOM Maintenance.zip ZIP file
Sec J Att 16_Antenna Maintenance.zip ZIP file
Sec J Att 16_IA Maintenance.zip ZIP file
Sec J Att 2-13_15_17-23.zip ZIP file
N0060423R0002 Request for Proposal (RFP)_SF33.pdf PDF
Sec J Att 24_NCTAMS Instructions.zip ZIP file
Sec J Att 16_IM_NRFTLualualei_SATCOM_MIPsLOEPs.zip ZIP file
Sec J Att 14_ Site Inventories.zip ZIP file
Sec J Att 1_CDRLs.zip ZIP file
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP & Post-Site Visit Questions N0060423R0002 - NCTAMS PAC Communications Systems O&M Questions & Answers RFP issued: 09Jun2023 & Site Visit 27-28 June 2023

Question #Document/Section/PageQuestion/CommentRecommended Change if applicableGovernment Response
1Section J, Att 2, DD Form 254Section J, Att 2, DD Form 254 section 1.b indicates the level of Safeguarding for classified information material required at the contractors facility is Top Secret.

DD Form 254 section 13.6 states "All access to classified information will be in Government operated facilities."

Would the Government please confirm that contractors are not required to store Top Secret material at their contractor facility? If this is correct, will the Government update the DD Form 254 to indicate "None" in Section 1.b?DD254 updated to state NONE. All access to classified material/information will be in Government operated facilities. NCTAMS PAC security has concurred with this change.
2Section M, paragraph M.1.D.7, page 150Section M, paragraph M.1.D.7 on page 150 states: "In accordance with FAR 52.217-8, “Option to Extend Services”, the Government may require continued performance of any services within the limits and at the rates specified in the contract. The value of the performance extension will be equal to half (1/2) the value of the immediately preceding period of performance. For evaluation purposes, the Government will evaluate ½ of the value of Option Period 4."
Would the Government please clarify if offerors are to include extension data within Section B, and if so, which CLIN should offerors use?Offerors are not to include extension data within Section B or in any CLIN.
3PWS, paragraph 2.4.2.6 on page 27Are there any Contractor-provided property required to support the NCTAMS PAC contract?Government has provided all requirements and the full GFE list with the RFP release on 6/9/23. It is at the vendor's discretion to determine what Contractor Property, in addition to the GFE that will be provided, is necessary to complete the provided requirements. Government does not intend to disclose any details on Contractor provided property.
4Section L.1.B.2.m.3.d on page 138Section L.1.B.2.m.3.d (Volume II - Price Proposal) on page 138 states "Offerors and their subcontractors that fail to follow the above instructions and/or provide all of the required submissions may not be considered for award."

Would the Government please clarify if only major subcontractors are required to submit pricing data, or if all subcontractors are to provide complete pricing data?

NOTE: The statement "Offerors and their subcontractors that fail to follow the above instructions and/or provide all of the required submissions may not be considered for award." is not included in section Section L.1.B.2.m.3.d.

ANSWER: The statement is found in L.1.A.3.d Under section titled "IMPORTANT NOTES" and it is in reference to all the instructions contained within Section L.1. Offerors (Prime and any Subcontractors) shall submit prices for all CLINs and for all performance periods. Subcontractors need not separately submit cost or pricing data that is reflected in the Prime’s prices.

5 Section L.1.B.2.m.(i)(1) on page 138 Section L.1.B.2.m.(i)(1) on page 138 requests offerors to provide "(1) Complete and Sign Offer Standard Form (SF) 33."

Would the Government please clarify if offerors are to provide only the signed SF33 and Section B? Or does the Government request the offeror provide additional solicitation sections? NOTE: RFP Section L.1.B.2.m.(i)(3) revised to remove " and accompanying attachments in Section J" as there are no Section J attachments applicable to Volume II - Price Proposal.

ANSWER: Government confirms offerors are to provide only the signed SF33 and completed Section B and no other Section J solicitation sections as it applies to RFP Section L.1.B.2.m.(i)(1).

6 Section L.1.A.2.i on page 126 Section L.1.A.2.i on page 126 states "Only spreadsheet pages may be formatted to be printed on ledger paper size (11 x 17) in lieu of the standard page size (8.5 x 11)."

Would the Government please clarify if this reference is to the spreadsheet pages in Volume II - Price Proposal? If so, are offerors limited to using 11 x 17 spreadsheets in the Volume II - Price Excel spreadsheets?Spreadsheets submitted as part of any element of an offeror's proposal may be formatted as ledger paper size (11 x 17) in lieu of the standard page size (8.5 x 11). If 8.5 x 11 is preferred an offeror may format as such.
7L.1 Vol. II - Price Proposal, (vii)

Page 137 States: "Offeror and any subcontractor(s) shall be responsible for ensuring compliance with the Collective Bargaining Agreement and/or Service Contract Act (SCA) for all applicable labor categories." Question: The current CBA expires 3/31/2025. The period of performance for the new contract would extend well into 2028. Question: Understanding that a new CBA will be re-noegotiated and ratified during the execution of this contract, how should biddrs apply labor rates that extend beyond the expiration of the current CBA? Provide clear guidance so bidders utilize the same approach in bidding for the years beyond the current CBA. Typically, in this situation, bid rates are held constant through the bid period, and an equitable adjustment is made at the time a new CBA is negotiated and ratified. Interested parties shall submit a price proposal in accordance with the offeror's accounting practices.

When the CBA based Wage Determination changes via contract modification following the renegotiation or ratification of a CBA, the contractor will be able submit a request for wage adjustment effective as of the beginningof the next option period in accordance with FAR 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts).

8 Section J, Att 11, PACRIM PWS Draft Page 66, Para 3.2.4 Para 3.2.4 states "The VLF watch shall monitor the activities at Building 1 (HFGCS Transmitter site) and respond to any alarm situations". Does remote alarm monitoring capability exist to monitor the HFGCS Alarms in Building 1 from the Building where the VLF withstander is located? Adjust RFP/PWS to include details on how the alarms are monitored and if not done remotely, provide the required periodicity for the monitoring (e.g how often the VLF watch travels to Building 1) The VLF watchstander shall have capabilities to receive remote notifications for security and facility systems. Periodic inspections of the interior and exterior of the HFGCS Transmitter building (BLDG 1) and its systems are required, at a minimum of every 8 hours no matter the status of the remote monitoring capabilities. Please refer to revised PWS section 3.2.4.8.

PWS Section 3.2.4.8 revised to state, “The Contractor shall monitor all controlled and restricted areas via remote monitoring tools (where applicable) and perform periodic security and safety inspections of all areas, at a minimum of every 8 hours. These inspections shall be logged in the Master Station Log.

9 Volume I: Factor 4, Subfactor 1 page 148 States: "The small business concerns (SBC) as defined in FAR Part 19 that are to be used in your proposed approach to satisfying the requirements of this solicitation for the entire performance period, including company name, business category(ies), description of products or services and NAICS code to be provided by each SBC and the nature of the commitment with the SBC (e.g., letter of commitment, joint ventures, mentor protégé agreements, others). Binding commitments shall become enforceable, contractual requirements".

QUESTION: Would the USG please confirm that fully executed Teaming Agreements with SBCs are acceptable documentation to satisfy that requirement?

QUESTION: Can the Government provide a sample of an acceptable “letter of commitment”? Question answered on Draft RFP responses released on 6/30/23.

Answer 1: Yes, fully executed Teaming Agreements with SBCs are acceptable documentation.

Answer 2: Yes, see RFP Section J, Attachment 23 for Sample Letter of Commitment template.

10 PWS 2.4.2.1 page 24 This paragraph states: "All GFP is to be provided in an 'as is' condition per FAR 52.245-1(d)(2)(iii). The Contractor will be given the opportunity to inspect such property prior to the property being provided. The Government makes no warranty with respect to the serviceability and/or suitability of the property for contract performance. Any repairs, replacement, and /or refurbishment shall be at the Contractor’ expense."

Would the USG please provide a list of this GFP to enable bidders to assess the risk involved with the potential repair, replacement, and/or refurbishment?Government has provided the full GFE list with the RFP release on 6/9/23. Reference RFP Section J, Attachment 14_Site Inventories for GFP listing.
11Section M, 3. Factor 3 – Past Performance, d, ii, 2, page 145
This section states: "2.International Business Experience – The contractor/sub-contractor must demonstrate capability in successfully conducting business operations in Australia, include type of work, scope, and duration. " Will the USG please consider removing or amending the Australia-specific language in this requirement?

We understand the critical importance of an organization demonstrating its experience in successfully conducting effective and efficient technical business operations in host/foreign nations to eliminate risk in the successful staffing and execution of the requirements at Detachment Kojarena, Australia; however, limiting international business operations experience to those conducted solely in Australia presents a barrier to competition, particularly in regard to this solicitation’s type of work.

Many companies, such as ours, possess extensive overseas business operations experience, which demonstrates a proven ability to successfully operate within, and adhere to, country- specific requirements (i.e., taxes, business licensing, visas, etc.). However, given there are not currently many US DOD contracting opportunities in Australia, it is highly likely that only the incumbent Prime and subcontractors will be able to satisfy the USG's requirement as currently written, particularly for projects similar in scope to the NCTAMS PAC requirements at Det Kojarena. This may create an unfair advantage that prohibits companies other than the incumbents from being awarded a contract, which could result in the appearance that only the incumbents need to submit a proposal. This could have the adverse effect of severely limiting competitive choices that could produce great value for the USG.

Recommendation: Remove the Australia-specific language from the Past Performance requirement or, alternatively, consider modifying the current wording to expand the requirement to include Internaltional Business Experience in any non-US nation. Example: “The contractor/subcontractor’s experience in successfully recruiting qualified staff and conducting business operations in Australia or similar foreign countries, while adhering to host nation requirements such as labor laws, corporate tax regulations, visa requirements, etc. Include type of work, scope, and duration."

Rationale: Doing business overseas comes with a unique set of requirements regardless of the country in which business is being conducted. As such, industry must be flexible and experienced in their corporate operations and adapt to each country’s specific laws and regulations. Any bidder that can demonstrate, through Corporate Experience and Past Performance, a successful track record of conducting business/corporate operations in similar regions and foreign countries would logically be able to identify and adapt to satisfy all requirements to successfully do business in Australia, and satisfy the overall Det Kojarena scope of work.

If the Government chooses not to remove the Australia specificity in the Past Peformance requirement, recommend the Government revise the evaluation criteria for this requirement and allow any Past Peformance citation that demonstrates International Busness Experience in Australia, while not necessarily having the same technical scope, to achieve a rating higher than Not Relevant as having the International Business Experience in Australia is one of two evaluation criteria described in Section M. Revised RFP Section M as follows: "For purposes of assessing capability, the Government will consider all international business experience to be potentially relevant and may rate business experience in Australia more favorably."

12 Section M, 3. Factor 3 – Past Performance, d, ii, 2 on page 145 Will the Government allow bidders to submit Past Performance Citations and Past Performance Questionnaires via JWICS? Or, alternatively, offer a method for providing relevant, Australia-specific past performance that is on a classified contract? This section states: "2. International Business Experience – The contractor/sub-contractor must demonstrate capability in successfully conducting business operations in Australia, include type of work, scope, and duration. " There are an extremely limited number of US Government contracts whose place of perfomance is Australia and and also have a scope that is technically relelvant to the NCTAMS PACRIM PWS requirements. A good portion, if not most/all, of those efforts are on contracts that are considered classified in nature and prevent industry from using them as Past Performance to be submitted through unclassified channels. By allowing bidders to submit Past Peformance Citations and Past Performance Questionnaires via JWICS the Government would enhance competition by increasing the pool of qualified potential bidders. Not allowing the submission of Past Performance information via classified channels decreased the likelihood of adequate competition. Allow bidders to submit Past Performance Citations and Past Performance Questionnaires via JWICS. Or, alternatively, offer a method for providing relevant, Australia-specific past performance that is on a classified contract. Government will not allow bidders to submit Past Performance Citations and Past Performance Questionnaires via JWICS.

Please provide only unclassified information (including, if available, a client point of contact who can respond to an unclassified Past Performance Questionnaire) as it relates to past performance information for contracts considered to be relevant.

13 Section L.1.A.2.i on page 126 The RFP states, "Only spreadsheet pages may be formatted to be printed on ledger paper size (11 x 17) in lieu of the standard page size (8.5 x 11)."

Would the Government consider allowing 11 x 17 foldouts for the Organization chart? Doing so would allow the Government to see all aspects requested on a single sheet of paper.Allow 11 x 17 foldouts for the Organization Chart.Government does not intend to allow 11 x 17 foldouts for Organization Charts at this time.
14L.1.A.1.i (1) &

L.1.A.1.v Pages 130 & 131 Will the Government provide clear direction on these two items from the RFP that appear to be in conflict with one another?

1) The RFP States: "If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers."

2) The RFP also states: "(v) Submissions. Offerors are discouraged from providing points of contact with another contractors’ facility, i.e., in case an offeror (or one of his/her team members) is in a subcontract with another contractor who has submitted a proposal on the same requirement. Offerors shall provide and submit the prime contract number and all Governmental agency POCs in lieu of subcontract numbers or prime contract POCs in situations as described above."

De-conflict these two requirements so that industry has clear direction. RFP Section L.1.A.1.i (1) revised to remove "If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers)."

15 Factor 3 (vi) & Factor 4, Subfactor 1, (3) Pages 132 & 133 Request the Government provide clarification on the referenced requirements, where it is stated that bidders are to provide notice on whether or not there has been any negative information regarding Small Business utilization reported in the past six years but then requests the same informtion for the past five years.

(vi) Small Business Participation Past Performance. All Offerors shall submit information substantiating the Offerors’ past performance in complying with FAR 52.219-8, Utilization of Small Business Concerns, maximizing opportunities for U.S. small business subcontractors. Offerors shall also provide a statement indicating whether any negative information has been reported in the past six years concerning the Offerors’ past compliance with FAR 52.219-8, Utilization of Small Business Concerns. If any such negative information has been reported, the Offeror may submit explanations or comments responding to such negative information. Offerors with no prior contracts containing FAR 52.219-8 shall certify the same.

Past performance information to demonstrate compliance with the requirements of FAR 52.219-8, Utilization of Small Business Concerns, including the extent to which small business performance objectives/requirements were met for the contracts that required submission of a Small Business Participation Plan or other small business participation/utilization document. Copies of contractual reports may be submitted to validate compliance with requirements of FAR 52.219-8. Explanation of efforts where minimum quantitative requirements and/or goals were not met should be provided. Supporting documentation shall be relevant to the requirements of this solicitation and shall be within the past five years.Will the government clarify the requirement is either for the past 5 or the past 6 years?Factor 3 (vi) revised to change "past six years" to "past five years".
16Section L, 2 Proposal Content, d. Certifications and Representations
Page 125This section states: "Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 33 and all certifications requiring original signature. An Acrobat PDF file shall be created to capture the signatures for submission.
Can the Government clarify if "(without modification to the file)" means the contractor cannot pull out Section K Representations and Certifications in a seperate file or if without modification to the file means without modification to the wording of the file?Section L, 2 Proposal Content, d, revised as follows: from "without modification to the file" to "without modification to the wording on the file."
17Section L, 2 Proposal Content, k. Proposal Page Limitations
page 126This section provides a table of the Volumes and Documents to be submitted along with page limits.
There is not a section shown for where the completed Certifications and Representations should be submitted under (Vol I or Vol II).Can the Government clarify which Volume the Certifications and Representations should be included in?Revised RFP Section L, 2 Proposal Content, k. Proposal Page Limitation to include volume location and page limitation for certification and representations.

"Page count is excluded from Volume I and shall be limited to only the pages provided via SAM.gov FAR & DFARS Report or Representations and Certifications found within SF 33."

18MECSP_Factor 2, Sub-Factor 2 - Management PlanThe Draft RFP requires offerors to provide a Mission-Essential Contractor Services Plan per the requirements of CDRL AC04, which will require significant page count. To ensure offerors are able to fully address all Section L requirements recommend excluding the MECSP from page count limitations or increasing the Factor 2 page limit to 100 pages.RFP Proposal Page Limitations for Factor 2 revised from "50 page limit, excluding Mission-Essential Contractor Services Plan per the requirements of CDRL AC04." to "75 page limit, excluding Mission-Essential Contractor Services Plan per the requirements of CDRL AC04."
19Hazardous Waste Disposa_Attachment 11 PACRIM PWS 2.2.2.2 Hazardous Waste DisposalThe PWS states that the offeror "may be responsible for disposal of waste generated by other organizations". Will this include financial responsibility for disposition of hazardous waste, and if so how should offerors account for this cost in their proposals.Question answered on Draft RFP responses released on 6/30/23.

The contractor may be responsible for the removal of general waste and disposition of government property generated by outside organizations as stated in PWS section 2.2.2.2, but the outside organization will be responsible for the removal of all of their hazardous waste (not the contractor).

Sentence added to PWS section 2.2.2.2 to state "The contractor will not be responsible for the disposal of hazardous waste generated by other organizations on site."

20 Security Escorts_Attachment 11 PACRIM PWS; 3.0 Deliverables Matrix; 3.1.27.3 Physical Security The PWS states that "The contractor shall provide escorts for uncleared personnel". This direction conflicts with the NCTAMS PAC Command Security Instruction 5510. Request Government clarification. Question answered on Draft RFP responses released on 6/30/23.

Perform as specified in the PWS. Command instruction under revision.

21CSWF_Attachment 11 PACRIM PWS 2.8.2.1 thru 2.8.2.7; Attachment 15 CyveSecWorkForceReqThe Draft PWS and CSWF Attachments have conflicting CSWF codes and references. Request Government clarification.Corrected CSWF attachment provided during RFP released on 6/9/23
22Past Performance Page Count_Factor 3 - Past PerformanceThe RFP language allows for 3 past performance citations however the page count wasn't adjusted for additional content in this volume. Recommend increasing the page count in this section from 25 to 50 pages.No change. The current page limit is 25 pages for the prime, plus 5 pages for each major subcontractor, excluding Past Performance Questionnaire Forms, Contractor Performance Assessment Report (CPAR), and written consent letters.
23Key Personnel Resumes_Draft RFPThe updated Draft RFP removed the previous requirement for Key Personnel resumes. Without these resumes, the Government’s risk in execution increases significantly as the Government will not be able to assess an offeror’s capability to staff key positions with qualified personnel. An offeror’s approach of re-badging incumbent personnel may not be a guaranteed path of success. Will the Government add the requirement for Key Personnel resumes to mitigate execution risk?Question answered on Draft RFP responses released on 6/30/23.

No. The Government does not intend to add the requirement for Key Personnel resumes at this time.

24 Staffing Plan_Sub-factor 2 - Management Plan With the omission of Key Personnel resume requirements, the Government has no method of assessing the risk of unspecificed personnel planned for critical contract positions. Recommend adding the requirement to include personnel names, clearance level, CSWF certification, and employment status (i.e. current employee, LOI signed, TBD) in the staffing chart currently required in Sub-Factor 2. Personally Identfiable Information (PII) can be protected through appropriate measures (i.e. encryption, password protection, etc.) Question answered on Draft RFP responses released on 6/30/23.

No. The Government does not intend to add the requirement to include personnel names, clearance level, CSWF certification, and employment status at this time.

25 Technical Capability_Factor 2 - Technical Approach The current Factor 2 requirement is constituted of Transition, Management, and QASP sub-factors. These factors don't allow the Government to evaluate offerors' technical capability necessary to perform the maintenance tasks required in the PWS. Recommend adding a Section L requirement for offerors to demonstrate they have the technical understanding, capability, and certifications to successfully perform NCTAMS maintenance tasks. Question answered on Draft RFP responses released on 6/30/23.

No. The Government does not intend to revise Factor 2 - Technical Approach evaluation criteria at this time.

26 LOI_Sub-factor 2 - Management Plan To ensure offerors proposed key personnel represent a realistic solution for project execution, recommend the Government require signed Letters of Intent (LOIs) for all Key Personnel that demonstrate employees will be 100% dedicated to the NCTAMS PAC contract for a minimum of 1 year of program execution. These LOI's should be included as an attachment to the Technical Volume and not count against page limitations. Question answered on Draft RFP responses released on 6/30/23.

No. The Government does not intend to add the requirement for Letters of Intent (LOI) at this time.

27 Past Performance Inconsistency_Factor 3 - Past Performance Section L and M requirements for recency and relevancy criteria for Factor 3 are inconsistent. Please clarify. Question answered on Draft RFP responses released on 6/30/23.

Request vendor provide more information (e.g. provide RFP pages where inconsistencies were found) to provide adequate answer to question or correction to RFP.

28Font_Section LTo ensure offerors can thoroughly address all proposal requirements, will the Government allow 9 point Times New Roman or Arial font in Headers and Footers and 8 point Times New Roman or Arial font for graphics and tables?No change. Font requirements will remain as stated in the RFP.
29PoP Start Date_RFP Section BPer Section B, the contract start date is 01 December 2023. The current incumbent contract ends 30 November. With the phased transition staffing described in Factor 2, the Government will only have partial coverage for the NCTAMS requirement from 30 November to 30 December 2023. In order to ensure full support during the transition, will the Government change the start date to 01 November?No change. The phase-in period duration is 01-31 December 2023. potential awardee must be fully staffed on the 30th day of the phase-in period. As such, a fully staffed workforce is expected on the first day of full performance 01 January 2023.
30MQR_Section L

Factor 4 - Small Business Participation Plan and Utilization Page 132:

a. The minimum Quantitative Requirements (MQR) Targets are as follows: SB 13.5%, SDB 5%, WOSB 5%, HUBZone 1%, VOSB 3%, and SDVOSB 3%.

Page 133:

(2) The SBCs (prime offerors and small business subcontractors) proposed quantitative participation in terms of the value of the total contract value.”

The RFP states that the goals should be in terms of Total Contract Value. Since the DoD Statutory HUBZone goal of 3%, based on Total Subcontract Value, continues to presents challenges for government and industry, is a 1% goal based on Total Contract Value an error? Please clarify if the socioeconomic goals should be in terms of Total Subcontract Value in accordance with the DoD Statutory goals (SDB 5%, WOSB 5%, HUBZone 3%, and SDVOSB 3%). The minimum Quantitative Requirements (MQR) Targets are as follows, based upon Total Contract Value: SB 13.5%, SDB 5%, WOSB 5%, HUBZone 1%, VOSB 3%, and SDVOSB 3%.

Example: Total Contract Value (TCV), $1,000,000; HUBZone 1% MQR equals $10,000. MQRs are based upon Total Contract Value; the statutory goals are based upon Total Subcontract Value.

Example:

Total Contract Value: $1,000,000 Total SubK Value: $270,000 SB MQR, 13.5%: $135,000 SB SubKtr Goal, 23%: $135,000 (50%) SDB MQR, 5%: $50,000 SDB SubKtr Goal, 5%: $50,000 (18.5%) WOSB MQR, 5%: $50,000 WOSB SubKtr Goal, 5%: $50,000 (18.5%) HUBZone MQR, 1%: $10,000 HUBZone SubKtr Goal, 3%: $10,000 (3.7%) VOSB MRQ, 3%: $30,000 VOSB SubKtr Goal, N/A: $30,000 (11.1%) SDVOSB MQR, 3%: $30,000 SDVOSB SubKtr Goal, 3%: $30,000 (11.1%) Other Than Small: $135,000 (50%)

31SB Subcontracting Plan_Factor 4To ensure a thorough subcontracting plan for eventual inclusion in the contract, recommend the Small Business Subcontracting Plan be excluded from page limitations.No change. Government does not intend to change the page limitations for Factor 4 - Subcontracting Plan.
32SB Volume_Factor 4Offerors must include price data to meet requirements of the Small Business Participation and Utilization Factor. This contradicts the instruction in L.A.1.g that "Cost/Price information shall not appear in the Technical proposal." Recommend moving Factor 4 to the Price volume to address this contradiction.Revised RFP SB Volume_Factor 4 "the Government request a version with dollar values redacted"
33Encryption_L.1.1 Proposal Submission RequirementsSection L.1.1 PROPOSAL SUBMISSION REQUIREMENTS para. f. states that Offerors may encrypt and/or password protect proprietary information as they see fit. However, if the Government is unable to access the documents, the proposal will not be considered. Para. m (i) Electronic Copy states that Files contained on the Volume II may not be password protected. Please provide clarification for this inconsistency regarding password protection.
RFP Section L.1.A.1.f revised as follows: "Offerors may encrypt proprietary information as they see fit. However, if the Government is unable to access the documents, the proposal will not be considered."
34Travel Costs_PWS 2.12PWS 2.12 Travel states that the Contractor shall be required to travel within and outside the Continental United States during the performance of this contract to attend meetings, conferences, training, and other duties, as required. Reimbursable travel expense pertains only to Government directed travel. All other travel expense incurred during normal operations and management duties under the contract remains the responsibility of the Contractor.

Section B Cost Reimbursement CLINs X023 MUOS Australia, X026 C2G2 Teleport Australia and X028 C2G2 Teleport GYC (AUS Terminal) note that the Governments estimated plug amounts as defined in Section L Volume II – Price Proposal para. (v), are for Repair Parts and Travel Cost.

Please confirm that travel reimbursable costs for AU assigned positions, including instances such as travel for potential replacement staff that could occur during the five year life of the contract and any travel associated with periodic visits to an employees’ home country, are not included in CLINs X023 and X026. Therefore such potential contractor incurred costs that an offeror deems necessary and recoverable would need to be included within the associated FFP CLIN prices.

The contractor shall be allowed to utilize CLINs X023 and X026 for travel costs incurred by required by Government action (i.e. CAC re-issuance, mandatory training). Vendors should factor travel costs incurred for Non-Government action into their FFP CLIN cost submissions.

*NOTE - The Government will NOT authorize the utilization of CLINs X023 and X026 for initial staffing if the vendor chooses to not utilize staff currently residing in Australia.

35 Plug Numbers_Volume II Price Proposal Reference Section L m. Volume II – Price Proposal paragraph (v) states: FOR COST REIMBURSEMENT CLINs IDENTIFIED IN THE TABLE ABOVE ONLY and in support of the proposed Indirect Expense Rates, Offeror and its subcontractor(s) shall provide documentation of the most recent Indirect Expense Rates, If the Prime proposes all of the Governments plug numbers provided in the table estimates, as Subcontractors are not expected to incur such expenses, is documentation of the most recent Indirect Expense Rates only required of the Prime and not its Subcontractors?

Information on Indirect Expense Rates is only required by parties (Prime or SubK) submitting price proposals associated with Cost Reimbursable CLINS.

If the Subcontractor is not expected to incur such expenses and will not submit a proposal associated with any of the cost-reimbursable CLINS then they do not have to submit Indirect Expense Rates information to the Government.

36ODC Pricing_PWS 2.1.6PWS paragraph 2.1.6 states “Contractors shall comply with host country laws for foreign country operations, i.e., Immigration (visas), tax and other applicable laws related to staffing and operation in the host country.” Will the Government please confirm that costs associated with this requirement, including processing visas, attorney fees, HOLA/COLA, travel reimbursement, OCONUS CAC renewal, etc., are not included in CLINs X023, X026 and X028, and therefore would need to be included within the associated FFP CLIN prices?Please refer to Question 34.
37Minor Facilities Maintenance and Repair_PWS 2.5.3.2PWS paragraph 2.5.3.2 Minor Facilities Maintenance and Repair states that the requirement is “NOT included as plug-in values in Cost Reimbursement CLIN’s” and that “The Contractor shall provide all minor maintenance and repairs to facilities ($2,000 per occurrence), the need for which may arise during the course of normal or abnormal operations at no additional expense to the Government. The Government will reimburse the Contractor for that portion of the parts and materials cost which exceeds the $2,000.00 threshold.”
Multiple occurrences which may arise could amount to significant cost requirements that need to be factored into offeror’s prices. Please provide information regarding the estimated number of occurrences and/or costs for which the Contractor is expected to bear the unknown needs and costs within their proposed firm-fixed prices.Minor Facilities Maintenance and Repair (PWS 2.5.3.2) - Historically, the annual cost for materials has been approximately $22,000.00 with 271 associated man hours per year.

Major Facilities Maintenance and Repair (PWS 2.5.3.3) - Historically, the annual cost for materials has been approximately $9200.00 with 30 associated man hours per year.

38Minor Facilities Maintenance and Repair_PWS 2.5.3.2PWS paragraph 2.5.3.2 Minor Facilities Maintenance and Repair states that the requirement is “NOT included as plug-in values in Cost Reimbursement CLIN’s” and that “The Contractor shall purchase and install, without reimbursement, all parts and material required for general facilities maintenance and repairs within the following thresholds; up to and including $2,000.00. Parts and materials are defined as raw materials, parts, subassemblies, components, and manufacturing supplies excluding General Administrative (G&A), combined, per item, per occurrence.”
Multiple occurrences which may arise could amount to significant cost requirements that need to be factored into offeror’s prices. Please provide information regarding the estimated number of occurrences and/or costs for which the Contractor is expected to bear the unknown needs and costs within their proposed firm-fixed prices.Please refer to Question 37.
39Cover Page Info_L.2.a.

a. The cover page should indicate the following:

Title of the proposal Volume Number (I or II) Proposal Category (Factor/Sub-factor) Request for Proposal Number Name and Address of Offeror, CAGE Code, SAM Unique Entity ID, and applicable Tax I.D. Number (TIN) Point of Contact name, telephone number, and email address

Proposal valid for 180 days after solicitation closingWill the Government please remove the requirement for "Proposal Category (Factor/Subfactor)" since this is a holdover from previous versions/drafts when files were borken down to a lower level that a volume?No change. This is still applicable as the proposal is required to be broken down into sections (i.e. Volume 1, Factor 1, Sub-Factor 1, or 2, etc.). Please reference RFP Section L.1.A.2.e. Proposals shall be prepared in two (2) separate and distinct volumes (attachments)
40NTE Plug Numbers_Section L, Volume II - Price ProposalSection L provides plug numbers for Repair, Travel, Supplies and Training costs. These numbers are described as “Not-To-Exceed” amounts. However, the instruction also allows offerors to add G&A and Overhead costs to the plug numbers. This appears to contradict with the “Not-To-Exceed” statement. Please clarify.RFP CLIN Plug-in values are the Government's estimates without proposed Indirect Expense Rates.

The CLIN will remain as a NTE, in the event an offeror proposes G&A and/or OH, the CLIN plug-in values will be revised prior to award to account for the winning offeror's proposed Indirect Expense Rates if applicable.

41DUNS vs. UEI_Section L, Factor 4 (iii).(6)Section L, Factor 4(iii).(6) asks that offerors provide a “List of subcontractors/parties, to include company names, DUNS and CAGE numbers, address, point of contact, email address, and phone number”. The DUNS number has been replaced by UEI in most procurements. Should this requirement be changed to "UEI and CAGE numbers"?RFP Revised to replace "DUNS" with "UEI"
42Facility Clearance_Section L, Factor 1 Facilities ClearanceThe table in L.2.k (page 126) shows the Top Secret Facility Clearance verification as part of Volume I. However, the Factor I paragraph on page 127 states that it should be included as an attachment to the solicitation. Please confirm that the Facility Clearance verification should be included in the Volume I Non-Price Proposal file, and not as a separate attachment.RFP Factor 1 - Facilities Clearance (page 127) revised to remove "Include as an attachment to the solicitation"
43SB Reporting_(6) SBPCD enforceable, contractual requirements shall require periodic progress reporting to facilitate government monitoring in the event of an award. Offerors are to propose quarterly reporting for the requirements in Sub-Factor 1 – Small Business Participation, subparagraphs (1) – (3) above (contractor format acceptable) in accordance with Section J, Section J, Attachment 1 – Exhibit EA, CDRL EA01Section J, Attachment 1 – Exhibit EA, CDRL EA01 states “Block 10: The semiannual report shall be submitted for the six month reporting period ending March 31 and the twelve month reporting period ending September 30.” This aligns with the semi-annual Individual Subcontracting Reporting (ISR) requirements. The SB Participation states quarterly reporting. Will the customer please clarify the discrepancy between the CDRL and Section L?RFP Section L.1 Factor 4(i)(6) Page 134, revised from "quaterly" to "semiannually"
44Subcontractor Cost Narrative_Section L.1 Proposal InstructionsSection L.1 Proposal Instructions paragraph g. states that Subcontractor cost/price proposals shall be submitted via email to the government, if the subcontractor deems its proposal contains proprietary data . . and that its proposal shall include all necessary supporting documents and narrative.
Please clarify what Subcontractor price data is required to be submitted to the government in support of the Prime Contractor Firm-Fixed Price CLINs? Narrative content only in support of price reasonableness?RFP Section L.1.A.1.g. revised to remove "Subcontractor cost/price proposals shall be submitted via email and received by yasmin.a.restrepo.civ@us.navy.mil and troy.r.wong2.civ@us.navy.mil prior to the proposal due date and time, if the subcontractor deems its proposal contains proprietary data."
45Quality Control Plan_Section L, Factor 2 (iii)To substantiate the QASP data provided in Volume I, recommend that offerors also provide their Communications, Qualtiy Monitoring, and Control Plan (CDRL AA01), or equivalent plan, as an attachment (excluded from page count) to the Management Plan.No change. Page count will remain as instructed in the RFP.
46Discussion: PWS 2.10.7 Vehicles makes reference to how to display company names on Contractor Vehicles and other State vehicle requirements, but does not mention where or how many vehicles maybe required. PWS 2.4.1 Contractor Furnished Equipment, Facilities and Materials also does not mention where or how many vehicles maybe required. PWS 1.8.3 Grounds Perform grounds maintenance, vegetation & weed control, grass cutting, and brush control of the Lualualei Radio Transmitter Facility (1745 Acre compound) and immediate area of the HFGCS receive antennae located at JBPHH Wahiawa Annex (Approximately 2 - 3 Acres) IAW the Facilities Maintenance Plan (See

Exhibit in Section J).

Question: Would the government clarify the requirements (Size, Shape, Number) for Contractor provided vehicles and groundskeeping equipment required at NCTAMS PAC, and if required, under which CLIN/ODC to price it under?

Government has provided all requirements and the full GFE list with the RFP release on 6/9/23. It is at the vendor's discretion to determine what Contractor Property, in addition to the GFE that will be provided, is necessary to complete the provided requirements. Government does not intend to disclose any details on Contractor provided property.

*NOTE - The Government does not have restrictions on Size, Shape, Number of contractor provided vehicles located at Government locations identified in the scope of the contract, as long as they do not interfere with operations or access/parking for government or contractor essential personnel.

47 Section L.1.A.2.k on page 126 The Price Proposal row in the Section L.1.A.2.k table states "Proposals submitted which do not adhere to the format or cell requirements may not be further considered for award."

Would the Government please confirm that the format or cell requirements the Government is referring to are those stated in Section L Volume II – Price Proposal paragraph (i)(4): "The proper format consists

of QUANTITY * UNIT PRICE = AMOUNT/NET AMOUNT" using contractor-developed spreadsheets?The Government confirms the proper format consists of of QUANTITY * UNIT PRICE = AMOUNT/NET AMOUNT" using contractor-developed spreadsheets.
48Section L.1.A.2.m.(i)(3) on page 135Section L.1.A.2.m.(i)(3) states "Section B: Complete Pricing Information (Section B) and accompanying attachments in Section J with all CLIN unit pricing and amounts."
Would the Government please clarify which accompanying attachments (other than Section B) offerors are to provide to the Government?Refer to answer 5 above.
49Section L.1.A.2. Factor 2 – Technical Approach (iii) Sub-factor 3: on page 150Would the Government allow offerors to provide a detailed QASP with key performance metrics that is excluded from proposal page count?RFP Proposal Page Limitations for Factor 2 revised from "50 page limit, excluding Mission-Essential Contractor

Services Plan per the requirements of CDRL AC04." to "75 page limit, excluding Mission-Essential Contractor Services Plan per the requirements of CDRL AC04."

50 PWS paragraph 3.3.2.1 As stated in PWS paragraph 3.3.2.1, the contractor is responsible to provide System Admin support to Harold E Holt (HEH) every 60 days or as required more frequently. Based on our travel team's research, there are no direct flights from Geraldton to HEH and because of limited flights hotel stays will be required in Perth (both ways) and Exmouth where each trips cost could exceed $10,000 and take approximately 5 days.

Would the Govt provide a separate CLIN to reimburse the contractor for the cost of getting personnel to/from Geraldton and HEH?RFP Revised to incorporate CLIN X033 cost-reimbursable for work directlly related to HEH. Government will reimburse travel directly related to HEH requirements in accordance with The Joint Travel Regulations (JTR) via applicable cost-reimbursement CLIN X033.
51Section BHistorical data indicates there have been 15 CAC resets in the last 18 months for Geraldton. Since the programs utilized at the site are Government systems, CAC resets may be required for contractor personnel due to corrupted Internet service at the site, computer lock ups when uploading items back to NCTAMS, or interruptions in the middle of downloads.

Getting personnel from Geraldton to an alternate site (via Perth) are limited due to flight schedules and costs can exceed $12,000 per event and take 3-4 days to resolve due to logistics or travel as well as availability for walk-in service for resets.

Will the Govt provide a separate CLIN to reimburse the contractor for the cost of getting personnel to/from Geraldton and Exmouth, Darwin or Canberra?Please refer to Question 34.
52Attachment 22,SBPCD, Section1, Page 1Please clarify if the MQR small business participation data specified in Section 1 of the form should show the base contract amount and each option year separately or is a single table showing the cumulative amounts (base year plus option years) required.MQR small business participation data should be presented discretely by base and option years and then totaled. See Updated Section J Attachment 22 Small Business Participation Commitment Document (SBPCD) template.
53RFP, Section L, Page 126Paragraph k. Proposal page Limitations establishes a page limit for Factor 4, Small Business Participation and Subcontracting Plan. The RFP states "25 page limit, excluding Small Business Participation Commitment Document (SBPCD). Is an Offeror's Small Business Subcontracting Plan (if required) included in this 25 page limitation?Yes, the limit includes an Offeror's Small Business Subcontracting Plan (if required).
54Section L.1.A.2.i on page 126Would the Government allow offerors to use 11 x 17 page size to provide a detailed transition schedule? If so, would the 11 x 17 count as one page or two pages?The Government will not allow the use of 11 x 17 page size to provide transition schedules at this time.
55PWS Paragraph 2.6.9 (page 32)Will the training plan and all of its associated training

materials (slides, instructional docs, personnel records, etc.) be provided to the winning contractor during the transition phase? All official system training/reference material, provided by the associated program office, will be provided during the transition period. As stated in PWS section 2.6.9, "the Contractor shall develop and implement a training plan and training for all sites systems" based on the training/reference material to ensure there is no loss in knowledge to properly meet all PWS requirements.

The NCTAMS PAC command training plan is renewed annually. The NCTAMS PAC FY23 command training plan and associated training material shall be provided during the transition period.

*NOTE - Historically the NCTAMS PAC command training plan does require approximately 4 stand down trainings (approximately 1-2 hours) with 3 available sessions during standard business hours over the course of the week for all on-island contractors. Vendors should evaluate for costs associated to requiring contractors to attend off-hour training during the weeks associated to the stand down training.

The command 2023 CSWF annual 20 hour CEU training records and available online course list shall be provided during the transition period.

56 L.1.A.2(i)(6) Page 129 Section L: Transition Plan Section (6) staffing requirement bullets state “.. days after date of award.” Please clarify this should be “days after transition (CLIN 001) start”. Change "after date of award" to "after transition (CLIN001) start" as follows:

25% fully staffed at seven (7) days after transition (CLIN 001) start.

50% fully staffed at fourteen (14) days after transition (CLIN 001) start.

75% fully staffed at twenty-one (21) days after transition (CLIN 001) start.

100% fully staffed at thirty (30) days after transition (CLIN 001) start. RFP L.1.A.2(i)(6) revised as recommended.