Exhibit A CDRLs.docx

DOCX document 468 KB Posted

Attached to
NAWCAD WOLF SCMS Life Cycle Support (LCS) RFP
Solicitation number
N0042120R0145
Issued by

About this file

This is a Request for Proposal for Life Cycle Support services in support of the Special Communication Mission Solutions Division of Naval Air Warfare Center Aircraft Division Webster Outlying Field. The Government intends to award an Indefinite Delivery Indefinite Quantity contract with a five-year ordering period and Cost Plus Fixed Fee Level of Effort type Orders. The estimated award date is 7 September 2021. The solicitation seeks engineering support, Integrated Product Support, technical data and configuration management, and technical and project management services for C5ISR systems. The North American Industry Classification System code is 541330 for Engineering Services with a small business size standard of $41,500,000. The Product Service Code is J059 for Maintenance, Repair, and Rebuilding of Electrical and Electronic Equipment Components. This is a follow-on to contract N00421-18-D-0062. Questions regarding this procurement must be submitted by email to the points of contact listed by 10 calendar days after issuance.

View the file

Other files

File Type Posted
N0042120R0145 Amendment 0001 Released.pdf PDF
LCS N0042120R0145 0001.pdf PDF
N0042120R0145 Amendment 1 Questions.pdf PDF
Attachment 16 - Locator Form.doc DOC document
Attachment 2 - LCS CSP.pdf PDF
Attachment P8 - Labor Hours.xlsx XLSX spreadsheet
Attachment P6 FINAL.xls XLS spreadsheet
Attachment 14 - LAN SOP.pdf PDF
Attachment 10 - Applicable Wage Determination.docx DOCX document
Attachment 7 - Small Business Subcontracting Plan.docx DOCX document
Attachment 3 - Segregation of Costs Format.docx DOCX document
Attachment 4 - Workforce Reporting Template.xlsx XLSX spreadsheet
N0042120R0145 LCS Final RFP.pdf PDF
Attachment 1 - DD254 Final.pdf PDF
Attachment P4 -BLS Chart Final.xlsx XLSX spreadsheet
Attachment 12 - COR Designation Letter.docx DOCX document
Attachment 5 - TASK ORDER CLOSEOUT.docx DOCX document
Attachment P2 - CPAQ.pdf PDF
Attachment 8 - List of Key Personnel.docx DOCX document
Attachment 9 - List of Approved Subcontractors.docx DOCX document
Attachment 6 - Data Item Transmittal Form.docx DOCX document
Attachment P3 - Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Attachment 15- Non-Navy IT Certification Form.docx DOCX document
Attachment 13 - ACOR Designation Letter.docx DOCX document
Attachment 11 - OCI.docx DOCX document
Attachment P1 - Past Performance Information Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER___MGMT________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A001
Contracting Officer’s Representative (COR) Management Report for Technical Direction Letters (TDLs)
Segregation of Cost and Invoice Requirements Reporting for TDLs
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81864A, See Blk 16
SOW Para 3.1.3.1
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT, See Blk 16

See Blk 16
See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A, See Blk 16

See Blk 16
See Blk 16
Reg
Repro
16. REMARKS
COR
0
1
0

Blk 4: Contractor format is acceptable if all mandatory data points from the Data Item Description (DID) Data Item Requirements List (generated from the DID listed in block 4), Excel template Contracting Officer’s Representative (COR) only and Excel template COR and Government Project Lead (GPL)/Technical Point of Contact (TPOC) as listed in attachments X, X and X of Section J of the Contract, are addressed. The Contractor shall segregate costs incurred on the Task Order (TO) at the lowest level of performance, by TDL or the lowest level subtask stated in the TDL and shall also submit invoices reflecting costs incurred at that level. In addition, the Contractor shall also include summaries of work charged during the period covered, percentage of funds invoiced and expended, budgeted and an Estimate at Completion (EAC) at the level identified within each TDL to represent the estimated cost of tasking for the Period of Performance (PoP) of the TDL. For this CDRL, the Contractor shall not submit data or invoices on a Contract Line Item Number (CLIN) or total TO basis. This data will be captured under a different CDRL.

Blk 7: Acceptance of both the COR only and the COR and GPL/TPOC deliverable formats will be by the COR via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). First and subsequent data deliverable submissions will not require approval but shall be submitted to the distribution list under Block 14 and via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blk 8: Approval is required for the COR only and COR and GPL/TPOC deliverable format only. Approval of deliverable format is required prior to first data deliverable submissions. First data submission and all subsequent data submissions will not require approval.

Blks 10, 11, 12, and 13: A draft of the format for both deliverables shall be due ten (10) business days after award of the TO. Government has five (5) business days to comment. Final format is due five (5) business days after Government approval of draft. The first data submission is due ten (10) business days after the first full month of TO performance and shall include data from TO award through the end of the first month of performance, this data shall also be submitted with the first invoice. Subsequent monthly data deliverables shall be submitted within ten (10) business days of the preceding month and with each monthly invoice. The data deliverable shall reflect the exact dollar amount and PoP as shown on the invoice. Format deliverable and data deliverables shall be distributed to those identified in Block 14.

Blk 14: Distribution and submittal by electronic media. Electronic deliverables shall be compatible with Microsoft Office 2016 unless otherwise approved by the Government. Distribution for format approval and data deliverables is as follows:

Format approval:

COR only format: Deliver to COR and Procuring Contracting Officer (PCO) COR and GPL/TPOC format: Deliver to COR and PCO

Monthly Data Deliverables:

COR only deliverable: COR COR and GPL/TPOC deliverable: COR, Naval Air Warfare Center Aircraft Division (NAWCAD) PCO and Project Lead/TPOC

GPL
0
1
0

See Blk 16

15.TOTAL▬▬▬▬►
0
3
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _25_Pages.18. ESTIMATED TOTAL PRICE

17. PRICE GROUP

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL
FOR CONTRACTOR PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Data CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).

Item 10. Specify number of time data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.

Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.

Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV Item should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER_MGMT_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A002
Contractor’s Progress and Status Report
Financial Progress Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81928 NOT 1, See Blk 16
SOW Para 3.1.3.2
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk16

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

ASREQ, See Blk 16
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 4: The financial progress report data shall be electronically submitted to include costs broken out to the contractor’s lowest Work Breakdown Structure (WBS). All costs shall roll up to a cumulative amount per Contract Line Item Number (CLIN) by Task Order and Technical Direction Letter (TDL).

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blks 10, 11, & 13: Electronic submission shall be submitted a minimum of twice a month, within seven (7) working days after the end of every reporting period in conjunction with the Contractor’s time/fiscal accounting system. If the required submittal date is a holiday, the reports shall be submitted by 1600, Eastern Standard Time (EST) of the next working day. Before implementing a system or schedule for submission, the Contractor shall check with the COR to ensure all SCMS Division requirements are met. The Contractor shall conduct quality reviews of all data before and after each electronic submission and is responsible for updating and correcting errors and omissions on current and cumulative expense data within forty-eight (48) hours of submission. Adjustments to the electronic submission shall be submitted as the adjustments occur. Prior year adjustments shall be made at the lowest level, and shall be available upon request.

Blk 12: Submission of first report is required within thirty (30) days after TO is awarded.

Blk 14: Electronic submission is required. Specific processes will be provided after award by the COR.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER___MGMT_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A003
Contractor’s Progress and Status Report
Contractor’s Personnel Roster/Workforce Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81928, See Blk 16
SOW Para 3.1.3.3
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT See Blk 16

MTHLY
40 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

EOM
10 DARP, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 4: The Contractor shall also provide number of cumulative hours worked by each employee by month per each Task Order (TO). Specific format in template must be followed (Attachment X).

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).

Blk 13: Reporting period is the last day of each month.

Blk 14: Electronic submission will be required. Specific processes will be provided by the COR.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER___ADMN__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A004
Report, Record of Meeting/Minutes
Trip/Meeting Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ADMN-81505
SOW Paras 3.1.5.1.1 and 3.3.4.2
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (see Contract Section J Attachments).

Blks 10, 12 & 13: Submit no later than seven (7) business days after trip or meeting.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER___MGMT_________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A005
Government Property (GP) Inventory Report
Contractor Acquired Property (CAP)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80441D
SOW Para 3.1.5.2
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

XX See Blk 16

One/R
20 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A, Blk 16

N/A
N/A
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blk 8: The Government will have five (5) business days to review and provide any comments. If required, the Contractor shall submit the final deliverables within five (5) business days of receipt of Government comments.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _25_Pages.18. ESTIMATED TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER__MGMT___________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A006
Phase-Out Transition Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81945 NOT 1
SOW Para 3.1.8
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

XX See Blk 16

One/R
90 DPT EOC
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A, See Blk 16

N/A
N/A
Reg
Repro
16. REMARKS
SCMS Division
1
1
0

Blk 17 Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments). If this form has not been transmitted within thirty (30) days from submission, the CDRL is considered accepted.

Blk8: The Government will have five (5) business days to review and provide any comments. If required, the Contractor shall submit the final deliverable within five (5) business days of receipt of Government comments.

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER__MGMT___________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A007
Accident Incident Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-82188
SOW Para 3.1.9.3
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
1
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12, & 13: At the time of a contractor-involved accident while operating a Government-owned or leased vehicle, a verbal report is required within twenty-four (24) hours and the written report shall be provided forty-eight (48) hours after the incident.

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER__MGMT__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A008
NAVAIR Operations Security (OPSEC) Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81999A
SOW Para 3.2.5
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

XX, See Blk 16

One/R
90 DAC
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

A, See Blk 16

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
1
1
0

Blk 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (see Contract Section J Attachments).

Blk 8: The Government has fifteen (15) days to provide comments. Final due forty-five (45) days after Government comments are provided.

Blk 13: Revisions as required after approval of final plan only to comply with Government data protection policy documents revision.

15.TOTAL▬▬▬▬►
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER___MISC__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A009
Technical Report – Study/Services
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80508B
See Blk 16
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 5: SOW Paras 3.3.1.1, 3.3.1.5, 3.3.1.6, 3.3.1.16, 3.3.1.18, 3.3.1.22, 3.3.2.5, 3.3.3.7, 3.3.3.10.2, 3.3.3.10.3, 3.3.3.10.9, and 3.3.3.10.12

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blk 10, 12, & 13: Submit within thirty (30) business days upon completion of the study.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER__ADMIN__________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A010
Presentation Material
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ADMIN-81373 NOT 1
SOW Para 3.3.4.2
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12 & 13: Submit within ten (10) business days Government identification of the requirement.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP__X_____
TM_______
OTHER__________SESS___________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A011
Conceptual Design Drawings/Models
Systems Concepts Documentation
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SESS-81001E NOT 1, See Blk 16
SOW Paras 3.3.1.2 and 3.3.1.9
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 4: Submit using the latest version of AutoCAD.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12, & 13: Submit within ten (10) business days after completion of requirements analysis when the Government requires evaluation of systems concepts.

Blk 14: Electronic submission with be required. Specific processes will be provided by the COR.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER_______SESS___________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A012
Product Engineering Design Data and Associated Lists
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-SESS-81000F
SOW Para 3.3.3.9
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT, Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blk 10, 12, & 13: Submit within ten (10) business days after design receives Government approval.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER_____PSSS_____________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A013
Bill of Materials (BOM) for Logistics and Supply Chain Risk Management’
Standardized Material Equipment List (MEL)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-PSSS-81656B, See Blk 16
SOW Para 3.3.3.10.1, 3.3.3.10.4, 3.3.3.10.5, and 3.3.3.10.11
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT, See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

ASREQ, See Blk 16
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 4: Digital media to be compatible with Microsoft Excel 2010 or later format.

The Contractor shall obtain most recent electronic template from Contracting Officer’s Representative (COR) or Government Project Lead (GPL) and electronically upload the updated deliverable. A sample Standardized MEL has been embedded in this electronic DD1423 for reference only.

Populate the template with all major equipment, components, and material requirements. Use the Direction and Sample worksheets as a reference. Complete all known information on the template prior to upload. All yellow fields (columns) are mandatory and must be populated (note that assembly headers (record indicator type 1) are an exception and only require “Item No.” and “P/N Desc” fields.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _13_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER________________________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A014
Technical Report – Study Services
Technical Manuals and Materials
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80508B
SOW Para 3.3.2.9.6
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION Blk 16

LT,

See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12, & 13: Submit within ten (10) business days upon completion of revised or final drawing/specifications, technical manuals and materials.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _14_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER______TMSS_______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A015
Job Manual
Operations and Maintenance Manuals and Materials
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-TMSS-81700A
SOW Paras 3.3.2.8 and 3.3.3.8
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT,

See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12, & 13: Submit within thirty (30) business days upon identification of the need for an operations and maintenance manual or material.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _15_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER______ILSS_______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A016
Training Materials
Operator Training Manuals and Materials and Course Curriculum
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ILSS-80872 NOT 1
See Blk 16
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT,

See Blk 16

ASREQ, See Blk 16
ASREQ, See Blk 16
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
ASREQ, See Blk 16
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 5: SOW Paras 3.3.1.7, 3.3.2.9, 3.3.2.9.1, 3.3.2.9.2, 3.3.2.9.3, 3.3.2.9.4, and 3.3.2.9.5.

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

Blks 10, 12, & 13: Submit within thirty (30) business days upon identification of the need for a formal or informal operator training.

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _16_ of _25_Pages.18. ESTIMATED TOTAL PRICE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER______NDTI_______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A017
Test Plan
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-NDTI-80566A
SOW Para 3.3.1.21
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT ,See Blk 16

ASREQ
30 DPTT
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
30 DPTT
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _17_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER______NDTI______________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A018
Test Procedure
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-NDTI-80603A
SOW Para 3.3.1.21
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT, See Blk 16

ASREQ
30 DPTT
a. ADDRESSEE
b. COPIES
8. APP CODE
C
11. AS OF DATE
13. DATE OF SUBSEQUENTSUBMISSION
Draft
Final

N/A

N/A
30 DPTT
Reg
Repro
16. REMARKS
SCMS Division
0
1
0

Blk 7: Submission will be to the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection Form (Section J).

15.TOTAL▬▬▬▬►
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _18_ of _25_Pages.18. ESTIMATED TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST (CDRL)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP_______
TM_______
OTHER_________NDIT____________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
LCS
TBD
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A019
Test/Inspection Report
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-NDTI-80809B NOT 2
SOW Paras 3.3.1.10, 3.3.1.12, and 3.3.1.13
SCMS Division
7. DD 250 REQ
9. DIST STATEMENTREQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

LT, See Blk 16

ASREQ
30 DATC
a. ADDRESSEE

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .