Attachment 2 - LCS CSP.pdf
PDF 323 KB Posted
- Attached to
- NAWCAD WOLF SCMS Life Cycle Support (LCS) RFP
- Solicitation number
- N0042120R0145
About this file
This document includes a Contract Surveillance Plan and related federal contract opportunity. The Contract Surveillance Plan outlines the government's methods for monitoring a contractor providing Life Cycle Sustainment services including in-service and engineering support, Integrated Product Support, technical data and configuration management, and technical and project management support for C5ISR systems to the Special Communication Mission Solutions Division of Naval Air Warfare Center Aircraft Division Webster Outlying Field. Key details include a five-year ordering period for the Indefinite Delivery Indefinite Quantity contract with cost-plus-fixed-fee task orders, an estimated award date of 7 September 2021, and requirements for the contractor to meet small business subcontracting goals. The related federal contract opportunity is solicitation number N00421-20-R-0145 for these Life Cycle Sustainment services, with a response deadline within 10 days of issuance and NAICS code 541330 with a $41.5 million size standard.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-20-RFPREQ-4K0000T-2320
Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
Contract Surveillance Plan for Life Cycle Sustainment
1. Purpose
This Contract Surveillance Plan (CSP) document is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
The Life Cycle Sustainment (LCS) contract includes in-service and engineering support, Integrated Product Support (IPS), technical data and configuration management, and technical and project management support. Systems consist of Radio Frequency (RF) communications systems, antenna systems, baseband audio/video data systems, signal routing/patching/ monitoring, Communications and Electronic (C-E) remote control, Information Technology (IT), power/signal distribution, Audio Video (AV), and Video Teleconference (VTC) systems. This includes legacy, current, and future Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems and the in-service engineering support, integrated product support and C-E equipment/systems and subsystems training, and technical data and configuration management support of those systems/subsystems.
This Contract will have Cost-Plus-Fixed-Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The Contract will have one (1) five-year ordering period. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the LCS contract and each TO.
Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The PCO for this Contract is Kristen Ferro. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this
CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. The KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.
Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.
Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
GPL: The GPL is responsible for assisting in administering specific efforts under the Contract.
A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for in-service and engineering support, IPS, technical data and configuration management, and technical and project management support is very competitive. As such, the successful Offeror has a vested interest in the Government generated CPARS under this Contract.
Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the Contractor, the COR/ACOR, and GPLs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): Surveillance Activity Checklist (SAC) Enclosure (2): Quarterly Evaluation by CDRL Enclosure (3): Annual Surveillance Summary
N00421-20-R-0145 Enclosure (1)
Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
ENCLOSURE (1): SURVEILLANCE ACTIVITY CHECKLIST (SAC)
Quarterly Surveillance:
The COR will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of SB, and other areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION BY SOW PARAGRAPH
Description Surveillance
Method/Measure Dates
Quality Assessment
Schedule Assessment
Cost Control Assessment
Business Relations
Assessment
Management Assessment
Utilization of SB
Assessment
Other Areas
Assessment In-Service and Engineering Support IAW paragraph 3.3.1
100% Inspection by COR/ACOR and/or GPLs
IPS and Systems IAW paragraph 3.3.2
100% Inspection by COR/ACOR and/or GPLs
Technical Data and Configuration Management IAW paragraph 3.3.3
100% Inspection by COR/ACOR and/or GPLs
Technical and Project Management Support IAW paragraph 3.3.4
100% Inspection by COR/ACOR and/or GPLs
Enclosure (2)
Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (2): QUARTERLY EVALUATION BY CDRL
Description Surveillance Method/Measure Dates Due
Dates Complet ed
No.
Submittals
No. of Req’d Rework
Percentage On Time
Comments
A001 – Contracting Officer’s Management Report for Technical Direction Letters (TDLs) (Segregation of Cost and Invoice Requirements Reporting for TDLs)
100% Inspection by COR/ACOR and/or GPLs.
A002 – Contractor’s Progress and Status Report (Financial Progress Report)
A003 – Contractor’s Progress and Status Report (Contractor’s Personnel Roster/Workforce Report)
A004 – Report, Record of Meetings/Minutes (Trip/Meeting Report)
A005 – Government Property (GP) Inventory Report (Contractor Acquired Property (CAP))
A006 – Phase-Out Transition Plan 100% Inspection by COR/ACOR and/or GPLs.
A007 – Accident Incident Report 100% Inspection by COR/ACOR and/or GPLs.
A008 – NAVAIR Operations Security (OPSEC) Plan
A009 – Technical Report –
Study/Services
A010 – Presentation Material 100% Inspection by COR/ACOR and/or GPLs.
A011 – Conceptual Design Drawings/Models (Systems Concepts Documentation)
A012 – Product Engineering Design Data and Associated Lists
Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates Due
Dates Complet ed
No.
Submittals
No. of Req’d Rework
Percentage On Time
Comments
A013 – Bill of Materials (BOM) for Logistics and Supply Chain Risk Management (Standardized Material Equipment List (MEL))
A014 – Technical Report – Study Services (Technical Manuals and Materials)
A015 – Job Manual (Operations and Maintenance Manuals and Materials)
A016 – Training Materials (Operator Training Manuals and Materials and Course Curriculum)
A017 – Test Plan 100% Inspection by COR/ACOR and/or GPLs.
A018 – Test Procedure 100% Inspection by COR/ACOR and/or GPLs.
A019 – Test/Inspection Report 100% Inspection by COR/ACOR and/or GPLs.
A020 – Integrated Logistics Support (ILS) Plan
A021 – Supplier’s Configuration Management Plan
A022 – Engineering Change Proposal (ECP)
A023 – Program Management Plan (Project Requirements)
A024- Implementation Plan (Integration/Installation Report)
A025 – Maintenance Support Plan 100% Inspection by COR/ACOR and/or GPLs.
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (3)
Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results Quality of Product or Service Review of Quarterly Ratings Schedule Review of Quarterly Ratings Cost Control Review of Quarterly Ratings Business Relations Review of Quarterly Ratings Management Review of Quarterly Ratings Utilization of SB Review of Quarterly Ratings Other Areas Review of Quarterly Ratings
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of product or service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts
Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
For non-performance-based TOs, hours delivered by each TO compared to the TO required hours will be evaluated and will influence the ratings awarded above. Cost and/or labor hour variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.