Attachment P6 FINAL.xls

XLS spreadsheet 91 KB Posted

Attached to
NAWCAD WOLF SCMS Life Cycle Support (LCS) RFP
Solicitation number
N0042120R0145
Issued by

About this file

This document contains a Request for Proposal for Life Cycle Support services for the Special Communication Mission Solutions Division of Naval Air Warfare Center Aircraft Division. The government seeks to award an Indefinite Delivery Indefinite Quantity contract with a five-year ordering period and Cost Plus Fixed Fee Level of Effort Orders to provide Life Cycle Sustainment including in-service and engineering support, Integrated Product Support, technical data and configuration management, and technical and project management for C5ISR systems. The estimated award date is September 7, 2021. Questions regarding this solicitation must be submitted by email to the points of contact provided by October 7, 2021. The North American Industry Classification code is 541330 for Engineering Services and the Product Service Code is J059 for Maintenance, Repair, and Rebuilding of Electrical and Electronic Equipment Components. The incumbent contractor is the holder of contract N00421-18-D-0062.

View the file

Other files

File Type Posted
N0042120R0145 Amendment 0001 Released.pdf PDF
LCS N0042120R0145 0001.pdf PDF
Exhibit A CDRLs.docx DOCX document
N0042120R0145 Amendment 1 Questions.pdf PDF
Attachment 16 - Locator Form.doc DOC document
Attachment 2 - LCS CSP.pdf PDF
Attachment P8 - Labor Hours.xlsx XLSX spreadsheet
Attachment 14 - LAN SOP.pdf PDF
Attachment 10 - Applicable Wage Determination.docx DOCX document
Attachment 7 - Small Business Subcontracting Plan.docx DOCX document
Attachment 3 - Segregation of Costs Format.docx DOCX document
Attachment 4 - Workforce Reporting Template.xlsx XLSX spreadsheet
N0042120R0145 LCS Final RFP.pdf PDF
Attachment 1 - DD254 Final.pdf PDF
Attachment P4 -BLS Chart Final.xlsx XLSX spreadsheet
Attachment 12 - COR Designation Letter.docx DOCX document
Attachment 5 - TASK ORDER CLOSEOUT.docx DOCX document
Attachment P2 - CPAQ.pdf PDF
Attachment 8 - List of Key Personnel.docx DOCX document
Attachment 9 - List of Approved Subcontractors.docx DOCX document
Attachment 6 - Data Item Transmittal Form.docx DOCX document
Attachment P3 - Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Attachment 15- Non-Navy IT Certification Form.docx DOCX document
Attachment 13 - ACOR Designation Letter.docx DOCX document
Attachment 11 - OCI.docx DOCX document
Attachment P1 - Past Performance Information Form.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories (found in Column B), however, each proposed labor category should appear opposite of the government labor category it is comparable to. In Column B, insert the government role and reference the Location Labor-Cat Spreasheet for these entries. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4In column D, choose the work location that the contractor will be working at in accordance with the P4. Note, the Location-Labor Cat Spreadsheet can be referenced to show how the P4 locality lines up with the SOW. If a labor category is to be worked at two different locations, please specify these differences. (For example Emloyee A and Employee B are both Junior Electrical Engineers. Employee A will work in Maryland and Eployee B will be working in Texas. Entries should be made in two seperate rows, noting this locality difference.)
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, A20, and A38.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. In Column B, insert the government role and reference the Location Labor-Cat Spreasheet for these entries. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4In column D, choose the work location that the contractor will be working at in accordance with the P4. Note, the Location-Labor Cat Spreadsheet can be referenced to show how the P4 locality lines up with the SOW. If a labor category is to be worked at two different locations, please specify these differences. (For example Emloyee A and Employee B are both Junior Electrical Engineers. Employee A will work in Maryland and Eployee B will be working in Texas. Entries should be made in two seperate rows, noting this locality difference.)
5Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
6The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
7All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
8All dollar figures shall be carried out no further than two decimal places.
9In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
10In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
11Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordinly.
12For subcontractor cost summary sheets, clear contents for Rows 22-27, 32, 39-40, and 44-47. Please note, the subcontractor can not propose pass through charges.
13When submitting this file, the instructions may be deleted.

Location-Labor Cat Spreadsheet

P4 LocationLocation specified in SOWLabor CategoryBLS SOCSCA Code
California-Lexington Park, MDWOLF, St. Inigoes, MDGeneral and Operations Manager, Senior11-1021
Fayettville, NCSpring Lake, NCGeneral and Operations Manager, Journeyman11-1021
San Diego, CASan Diego, CAGeneral and Operations Manager, Junior11-1021
VA Beach-Norfolk, VAChesapeake, Suffolk, & Norfolk, VALogistician, Senior13-1081
Pensacola, FLFort Walton Beach, FLLogistician, Journeyman13-1081
Jacksonville, NCCamp Lejeune, NCLogistician, Junior13-1081
El Paso, TXFort Bliss, TXElectrical Engineer, Senior17-2071
Colorado Springs, COFort Carson, COElectrical Engineer, Journeyman17-2071
Miami, FLHomestead Air Force Base, FLElectrical Engineer, Junior17-2071
Seattle-Tacoma, WAJoint Base Lewis-McChord, WAComputer Hardware Engineer, Journeyman17-2061
Fort Campbell, KYChristian, KYComputer Hardware Engineer, Junior17-2061
Panzer Kaserne, GermanyPanzer Kaserne, GermanyComputer Network Support Specialist, Journeyman15-1231
Computer Network Support Specialist, Junior15-1231
Computer Network Architects, Journeyman15-1241
Computer Network Architects, Junior15-1241
First-Line Supervisors of Production, Junior51-1011
Computer Systems Analyst, Journeyman15-1211
Computer Systems Analyst, Junior15-1211
Management Analyst, Journeyman13-1111
Management Analyst, Junior13-1111
Computer and Information Research Scientist, Junior15-1221
Project Management Specialist, Junior13-1082
Video Teleconference Technician (SCA)27-401113110
Electronics Technician Maintenance III (SCA)17-302323183
Electronics Technician Maintenance II (SCA)17-302323182
Electronics Technician Maintenance I (SCA)17-302323181
Engineering Technician III (SCA)17-302930083
Engineering Technician II (SCA)17-302930082
Engineering Technician I (SCA)17-302930081
Telecommunications Mechanic, II (SCA)49-202223932
Material Coordinator (SCA)43-506121030
Drafter/CAD Operator, II (SCA)17-301230062
Drafter/CAD Operator, I (SCA)17-301230061
Technical Instructor/Course Developer (SCA)25-309915095
Technical Instructor (SCA)25-309915090
Technical Writer I (SCA)27-304230461
Technical Writer II (SCA)27-304230462
Secretary II (SCA)43-60111312
Word Processor III (SCA)43-90221613
Word Processor II (SCA)43-90221612
Warehouse Specialist (SCA)53-706521410

Cost Summary Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Ordering Period Year 1Ordering Period Year 2Ordering Period Year 3Ordering Period Year 4Ordering Period Year 5Total for All Years
Cost ElementsGovernment Labor CategoryProposed Labor CategoryLocation (IAW P4)F/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 10000000
Employee Name 20000000
Etc.0000000
Total Direct Labor Cost0000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost000000
COM
Total Prime Contractor Labor Cost000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Total CPFF all CLINs (Labor and ODCs)$ - 0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
*In Section B, the prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

Summary

Ordering Period Year Summary Sheet
Ordering Period YearOrdering Period Year DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
X001
X002
X003
X004
X005
Total$ - 0

B-1 Composite Rates

Labor Category (* = Labor Category with Key Employee (s))Composite Fully Burdened Rates, Exclusive of Fee
Year 1Year 2Year 3Year 4Year 5
09/07/2021 – 09/06/2022**09/07/2022 – 09/06/2023**09/07/2023 – 09/06/2024**09/07/2024 – 09/06/2025**09/07/2025 – 09/06/2026**
*General and Operations Manager, Senior
General and Operations Manager, Journeyman
General and Operations Manager, Junior
*Logistician, Senior
Logistician, Journeyman
Logistician, Junior
Electrical Engineer, Senior
Electrical Engineer, Journeyman
Electrical Engineer, Junior
Computer Hardware Engineer, Journeyman
Computer Hardware Engineer, Junior
Computer Network Support Specialist, Journeyman
Computer Network Support Specialist, Junior
Computer Network Architect, Journeyman
Computer Network Architect, Junior
First-Line Supervisors of Production and Operating Workers, Junior
First-Line Supervisors of Production and Operating Workers (Danger Pay), Junior
Computer Systems Analyst, Journeyman
Computer Systems Analyst, Junior
Management Analyst, Journeyman
Management Analyst, Junior
Computer & Information Research Scientist, Junior
Project Management Specialist, Junior
Video Teleconference Technician (SCA)
Electronics Technician Maintenance III (SCA)
Electronics Technician Maintenance III (Danger Pay) (SCA)
Electronics Technician Maintenance III (Overtime)(SCA)
Electronics Technician Maintenance II (SCA)
Electronics Technician Maintenance II (Overtime)(SCA)
Electronics Technician Maintenance I (SCA)
Electronics Technician Maintenance I (Overtime)(SCA)
Engineering Technician III (SCA)
Engineering Technician III (Overtime) (SCA)
Engineering Technician II (SCA)
Engineering Technician II (Overtime) (SCA)
Engineering Technician I (SCA)
Engineering Technician I (Overtime) (SCA)
Telecommunications Mechanic, II (SCA)
Telecommunications Mechanic, II (Overtime) (SCA)
Material Coordinator (SCA)
Drafter/CAD Operator, II (SCA)
Drafter/CAD Operator, I (SCA)
Technical Instructor/Course Developer (SCA)
Technical Instructor (SCA)
Technical Writer I (SCA)
Technical Writer II (SCA)
Secretary II (SCA)
Word Processor III (SCA)
Word Processor II (SCA)
Warehouse Specialist (SCA)
** Dates to be adjusted at contract award

File details come from the government source that posted it. Updated .