N00421-20-R-0127-0002_CONFORMED.pdf
PDF 3 MB Posted
- Attached to
- Software Engineering Department Support Services Federal contract opportunity
- Solicitation number
- N00421-20-R-0127
About this file
This Request for Proposal (RFP) solicits offers to provide software engineering department support services to the Naval Air Systems Command (NAVAIR) at Patuxent River, Maryland. Key details include:
-
The services required include software sustainment, systems engineering, integration, development and test, acquisition support, laboratory engineering, configuration and program management.
-
The period of performance is a five year IDIQ contract with ordering through cost-plus-fixed-fee and cost reimbursable CLINs.
-
The place of performance is 93% at Naval Air Station Patuxent River with some support at other locations including Jacksonville, FL; San Diego, CA; and Seattle, WA.
-
The proposal response date is within 30 calendar days of issue and all questions must be received within 10 calendar days. Amendments will be posted to beta.SAM.gov.
-
The North American Industry Classification System code is 541330 with a small business size standard of $41.5M. The Product Service Code is R425.
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 02 Nov 2020
X
A
X B
X C X D
EX
X
G
F 125 - 135
136 - 158
X H 159 - 165
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 165
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00421 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 13
14 - 27
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
28 - 68
69 - 70
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
71 - 72
73 - 75 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 76 - 81 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 82 - 98 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
99 - 123
PART II - CO NTRACT CLAUSES
NAWCAD PROCUREMENT GROUP
21983 BUNDY ROAD, BLDG 441
PATUXENT RIVER MD 20670
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
1300838592
5. DATE ISSUED
02 Oct 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0042120R0127
Section A - Solicitation/Contract Form
GOVERNMENT POINTS OF CONTACT
Section A - Solicitation/Contract Form
GOVERNMENT POINTS OF CONTACT
Contract Specialist: Laura Daron
E-mail: laura.daron@navy.mil
Contract Specialist: Lacee McKinney
E-mail: lacee.mckinney@navy.mil
Procuring Contracting Officer: Sotanya Rushing
E-mail: sotanya.rushing@navy.mil
VERBIAGE AND TERMINOLOGY
For clarification purposes, throughout this solicitation, Cost-Plus-Fixed-Fee (CPFF) Term and CPFF Level of Effort are used interchangeably for CPFF Labor CLINs.
PRODUCT SERVICE CODE
The basic contract of this Single-Award Indefinite Delivery/Indefinite Quantity, CPFF, and Cost Reimbursable vehicle will have an associated Product Service Code (PSC) of R425, Engineering and Technical Services.
CONTRACT TYPE
The Contract resulting from this solicitation will be a Single-Award Indefinite Delivery/Indefinite Quantity contract utilizing CPFF CLINs for Labor (Term). Cost Reimbursable CLINs will be used for Other Direct Costs (Travel and
Material). Foreign-Area Allowance CLINs may be either CPFF or Cost Reimbursable as determined at time of Task
Order (TO) award.
ANTICIPATED FIRST YEAR ORDERING
It is anticipated that approximately 85% of the estimated labor hours for the first contract year will be awarded under task orders within two (2) months after the award of the IDIQ contract. This information is the Government’s best estimate and is provided for situational awareness only.
SECURITY CLEARANCE REQUIREMENTS
Top Secret facility clearance is required at time of proposal submission. All personnel are required to have a minimum of a Secret clearance at task order award. Task orders will specify the exact labor categories, security level (secret or top secret) and number of employees required to have the specified clearance levels.
NOT SEPARATELY PRICED CLINS
Not Separately Price (NSP) Appropriation Type CLINs and a NSP Data CLIN will be on the Basic IDIQ Contract, whereas, at the Task Order Level, CLINs will be separately priced along with NSP Data CLINs. At the IDIQ level, CLIN 0001 will contain the overall ceiling for CLINs 0002-0006; CLIN 0007 will contain the overall ceiling for
CLINs 0008-0012; CLIN 0013 will be the NSP Data CLIN with no ceiling value; CLIN 0014 will contain the overall ceiling value for CLINs 0015-0019; CLIN 0020 will contain the overall ceiling value for CLINs 0021-0025, and CLIN 0026 will be a NSP Contractor Acquired Property (CAP) CLIN.
LABOR CATEGORY INFORMATION
This is NOT a Service Contract Labor Standards Contract.
AMENDMENT
Amendment 0002 mailto:laura.daron@navy.mil mailto:lacee.mckinney@navy.mil mailto:sotanya.rushing@navy.mil
Clarification to Responses to Industry Question 20:
The Government verifies that inclusion of hyperlinks within and across proposal volumes, with the exception of cost, is in compliance with RFP instructions. However, there shall be no links from any other volume into the Price Volume or into any other portion of the proposal that contains price information. The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information.
Clarification to Responses to Industry Questions 13, 26, and 38:
Upon an Offeror’s request, copies of all of the Standard Work Packages (SWPs) will be provided via DoD
SAFE (https://safe.apps.mil/) link.
Clarification to Section L, Part B, paragraph 1.3.3.1, Small Business (SB) Utilization Strategy (c):
The intent is for the offeror to identify the planned subcontract effort as being low, medium, or high complexity and to provide a brief rational/explanation to the Government as to why the subcontractor is given its respective description.
Amendment 0001
Responses to Industry questions to RFP posted on 02-OCT-2020:
Question
Subject RFP
Page #
Section
(L,M,SOW,
etc.)
Question Answer
1 Past
Performance
134 Section L
Part B
Paragraph
2.1.4
Can the Government confirm that Contractor
Performance Assessment Reports (CPAR) are permitted to be used in lieu of submitting a
Performance Assessment Questionnaire
[Attachment P2] per RFP Section L.2.1.4?
Yes, Contractor Performance Assessment
Reports (CPAR) are permitted to be used in lieu of submitting a Performance Assessment
Questionnaire [Attachment P2]. Please see
L.2.14 which states " The primary source of past performance information will be PPIRS.
If a Contractor Performance Assessment
Report (CPAR) exists for multiple years for the same contract/order, all periods of performance within the recency period specified above, for that contract/order, will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a
Contractor Performance Assessment
Questionnaire (CPAQ), Attachment P2,......"
2 Past
Performance
133 Section L
Part B
Paragraph
2.1
RFP Section L.2.1 states that no classified information shall be submitted. May Offerors include classified contracts if only unclassified information is supplied with the proposal response?
The Offerors may not include classified contracts if only unclassified information is supplied with the proposal response. On page 128, 5.0 CLASSIFIED DATA, Section
5.1, the RFP states "All proposals must be
UNCLASSIFIED." Furthermore, on page
133, under 2.0 VOLUME 2: PAST
PERFORMANCE, Section 2.1 General, stated that "No classified information shall be submitted."
3 Past
Performance
134 Attachment
P1; Section
L Part B
Paragraph
2.1.3
Would the Government allow Offerors to convert
Attachment P1 to a Word Document so that all
Past Performance References can be easily contained within a single volume instead of having to submit multiple PDF files to meet this requirements?
Please see page 128 of the RFP where it is noted within Section 4.2.3. "The Offeror should provide one electronic file for each volume and annex, containing all information requested within the volume and annex. Offerors should not provide each section/paragraph as separate files.
4 Past
Performance
N/A Attachments Can the Government clarify whether completed
RFP Attachments need to be submitted in their original format?
Alternate formats are not acceptable.
5 Past
Performance
134 Annex 1 / 2;
Section L
Part B
Paragraph
2.1.3
The RFP states "...the Offeror shall provide one electronic copy of the Statement of
Work/Performance Work Statement/ Performance
Work Statement (PWS)/ Statement of Objectives
(SOO) for each contract reference as Annex 1 to this Past Performance Volume for the SOW paragraphs...". For classified contracts where a redacted SOW/PWS is not permitted, may
Offerors instead submit only a completed Cross
Reference Matrix (CRM)?
Please see question 2 for the answer.
6 Past
Performance
134 Annex 1;
Section L
Part B
Paragraph
2.1.3
Per the RFP instructions Offerors are to provide a copy of each past performance contract
SOW/PWS/SOO in Annex 1 of the proposal response. For those contracts whose
SOW/PWS/SOO does not define or provide all of the performance specifications and government-approved systems and software specifications may Offerors also include other Government documentation in addition to the SOW/PWS/SOO that substantiates their experience?
Please propose in accordance to the RFP.
7 Labor Hours 141-
Section L
Part B
Paragraph
3.6.3
The Government has three FTE listed for the
Network Engineer labor category family in the table under section L.3.6.3. However, in Section
4.3.7 Labor Qualities, the table has two Computer
Network Architects listed and only one Network
Engineer. Given that the Computer Network
Architect is also listed in the Section B-1(a) table and the section 3.4.6 Experience and Education
Level Definitions table, we ask that the
Government confirm that the table under L.3.6.3 should have two Computer Network Architects and only one Network Engineer. We ask that the
Government update the Section L.3.6.3 table accordingly.
Yes, the table in section 3.6.3 is updated to match section 3.4.7.17/19.
8 Section B
CLIN
Pricing
135 Section L
Part B
Paragraph
3.1.(b)
The Government states that the Cost Volume shall contain a copy of the Section B CLIN pricing with the total prices filled in using the estimated quantities in the solicitation. The section also states that Section B prices shall be provided as a separate document in MS Office
2016 Excel format. For the Section B CLIN pricing, can the Government confirm that only
Attachment P3 and Attachment P6 in the Excel format is required for providing prices by CLIN and the Section B-1 composite labor rate data and that offerors are not required to submit the data in the PDF format?
The Government confirms that Attachments
P3, P6 data is not submitted in PDF.
9 Individual
Designator
Instru ctions
Tab
Attachment
P8
The Government states that there is a Position
Number in Attachment P6 that shall be used in
Attachment P8 as the Individual Designator.
There are no Position Numbers in Attachment P6.
Would the Government confirm that for the
Individual Designator column of Attachment P8 that the Employee Name column data from
Attachment P6 can be used and will be sufficient for the Government's purposes?
For each individual Contractor or
Subcontractor employee proposed; enter a different Identifying title in the form of
FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template; rather, provide that information separately. Enter one FTE# for
EACH individual proposed. (The number of
FTE's must coordinate with the submitted P-
6 for evaluation purposes.)
10 Instructions Gover nment
Comp osite
Rate -
Term and
Contr actor
Comp osite
Rate -
Term
Tabs
Attachment
P3
The Attachment P3 instructions state that the fully burdened labor rate per hour shall be inclusive of fee on total cost. However, in Section L.3.3.2.1 of the RFP, the Government states that the composite rates provided in Attachment P3 "shall not include Prime fee on Prime labor" or "Prime fee on subcontractor labor". Will the Government please clarify if the rates included in Attachment
P3 are meant to be inclusive of fee or not?
The instructions should state exclusive of fee; the instructions in Attachment P3 have been updated.
11 Cover Letter 128 Section L-1
Part A
Paragraph
4.2.2
Section L.4.2.2 in the Draft RFP states in part, "...The Offeror shall certify, in its proposal cover letter, that all electronic proposal information delivered throughout the evaluation (e.g., original proposal submission, responses to evaluation notices, Final Proposal Revisions) has been or will be checked for viruses and certify that its files are/will be virus free...." The revised Section
L.4.2.2 in the final RFP makes no mention of this certification requirement or the submission of a cover letter. Please clarify the requirement for the inclusion of a cover letter in the proposal submission and if the "virus free" certification will be required. In addition, if a cover letter is required, where in the proposal documentation will the cover letter reside?
The final RFP is the version you should be proposing to, including any RFP amendments.
12 DIACAP vs.
RMF
19 2.1 DoD
Specificatio ns
2.1.22 DoDI 8510.01, "DoD Information
Assurance Certification and Accreditation Process
(DIACAP)," November 28, 2007
Given the transition from DIACAP to Risk
Management Framework (RMF). Will we need to support both standards, or if one, which?
The Contractor will only need to support
Risk Management Framework (RMF).
13 CyberSafe 19 2.1 DoD
Specificatio ns
Does the NAVAIRINST for Airworthiness and
CyberSafe apply to this work? It did not appear in the references.
Yes, the NAVAIRINST for Airworthiness and CyberSafe are included as indirect references in paragraph 2.3 via Standard
Work Package (SWP) 4940-026. A copy of that SWP can be provided if desired.
14 Deliverables 17
Section C
SOW
Paragraph
1.0 Scope
Paragraph
3.1.3
Deliverables
"Required reporting and analysis support services will include trade-off analysis reports, analysis reports of system design, test procedures to validate specification compliance and performance compliance, operational usability reports, interoperability reports to include conducting actual operational analysis in the laboratory or aircraft environment."
Is a particular periodicity, format, etc. expected for delivery of these products? Are they all assumed to fall under "Technical Report –
A002"?
The required periodicity, format, etc. will be variable as defined by delivery orders/task orders. Also, some delivery orders/task orders may require some reports under the
CDRL Technical Report – A002, but many will be more informal with delivery by e-mail or placement on a project server.
15 Lab and
COMSEC
Custodian
Training and
Certification
40 Section C
SOW
Paragraph
3.3.15
" The Contractor shall maintain proper COMSEC custodian duties for all laboratories as directed by the security office by interfacing with the Naval
District Washington (NDW) COMSEC custodian as appointed at NAS Patuxent River to ensure the
SPF laboratories are following the COMSEC program and enforcing all rules and regulations directed by the program."
Training to perform COMSEC custodian and other laboratory custodian duties will be provided by the Government to the contractor's staff. Such training will be considered part of their normal work duties.
As the training requirements associated with this duty are highly specific, and evolve over time, will COMSEC certification and training be provided to our staff? What other required security trainings to execute Laboratory
Custodian duties will be provided, and which will our company be responsible for providing? Will that training time be considered part of their normal duties?
16 Firmware 17 Section C
SOW
Paragraph
1.0 Scope
Firmware is mentioned twice in this section, but nowhere else. Will any specific skill in this area be required/expected for successful contract execution or should the offeror assume that personnel supporting software should have some basic familiarity with what firmware and how it works?
The offeror should assume that personnel who meet the requirements for supporting software will also have basic familiarity with firmware and how it works.
17 Staff
Education
Requirement s
45 Section C
SOW
Paragraph
3.4.7
For several positions it is stated that "neither an associate’s degree nor additional years of experience can be substituted for a Bachelor’s degree". Please confirm this applies for the Junior and Journeyman levels for the following labor categories : Software Engineer, Software
Developer, Systems Engineer, Test Engineer, and
Network Engineer. Given that many highly skilled, certified, cleared professionals who do not hold BS or BA degrees are currently performing tasks and working in these disciplines for
NAVAIR today, the degree requirement for these labor categories will significantly limit the talent pool for industry to draw from. Would the
Government consider allowing substitution of an associate's degree or additional years of experience for at least the Junior and Journeyman levels of the aforementioned categories?
Substitutions for the engineer labor categories will not be considered.
18 Proposal
Due Date
1 SF33 Box 9 Reference: SF33 box 9 – Proposal due date 2
NOV 2020 (30-day response time)
Question: Current environmental conditions
(COVID-19) have caused restriction on gathering and travel, adding complexity to the proposal development process. To provide enough time to generate a comprehensive response to this RFP, would the Government consider increasing the response time to 45 days?
The Government will not extend the response date for proposals.
19 252.228-
N/A Section I Reference: Section I Contract Clauses – DFAR
252.228-7001 Ground and Flight Risk
Question: Changes to Draft N00421-20-R-0127 included the addition of DFAR 252.228-7001
Ground and Flight Risk (JUN 2010) to Section I
Contract Clauses. The DFAR clause does not appear to be included in the final solicitation.
Does the Government plan to include the DFAR clause in the solicitation?
DFAR Clause 252.228-7001 Ground and
Flight Risk (JUN 2010) under Section I is removed from the FINAL RFP and it will not be included within this final solicitation.
20 General
Instructions
125 Section L
Part A
Reference: L-1, PART A – General Instructions
Question: Is cross-referencing of content across sections and volumes to reduce content redundancy allowable/compliant?
The Government will not allow cross-referencing of content across sections and volumes.
21 CRM &
Paragraph
Mapping
127 &
Section L
Part A
Paragraph
3.5 &
Section C
SOW
Paragraph
3.3
Reference: L PART A-3.5 page 127 “The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the Offeror’s proposal. The
CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.”
Question A: Is the Technical CRM to be included as part of the Technical Volume?
Question B: Please clarify the Government’s requirement for mapping to all RFP subparagraphs. Specifically, the detailed support section (3.3) of the SOW contains 92 paragraphs and subparagraphs. Does the Government require that all 92 paragraphs and subparagraphs be addressed within the responses to the three technical sample tasks?
Question A: The Technical CRM is included as part of the Technical Volume.
Question B: No, all RFP subparagraphs are not required to be addressed within the responses to the sample tasks.
22 Work Force 130 Section L
Part B
Paragraph
1.2
Reference: L PART B - 1.2 Work Force page 130
“The Offeror shall propose personnel that meet all labor category requirements. The following definitions apply:
• “Contingent Hire” – An individual who has committed, under a signed letter of intent, to being employed by the Offeror with a stated salary, if the Offeror is awarded the contract.”
Question: If salaries are required in the letter of intent and there is a non-exclusive agreement between the subcontractor, then it puts competitor competition sensitive information at risk. Would the Government consider removing the salary requirement in the letter of intent?
It will be the discretion of the Offeror to redact sensitive information concerning
Contingent Hire salary.
23 Transition
Plan
132 Section L
Part B
Paragraph
1.3.2
Reference: L PART B-1.3.2. Transition Plan page
Question: There is no Transition Plan as defined in Section L-1.3.2.1 relating to Transition-In activities included in the SOW. In the SOW, there is only reference to A006 Phase-Out
Transition Plan, SOW 3.1.3.6 Phase-Out
Transition Plan and SOW 3.1.8 Transition out
Strategy. Will the Government be providing
Transition-In requirements? What is the transition period?
The Government updated SOW Paragraph
3.1.8.1, Work Turnover/Transition Plan, in addition to adding the transition period.
Furthermore, Section M, paragraph 1.3
Management Approach incorporates language concerning the Work
Turnover/Transition Plan.
24 Submittal
Package
135 Section L
Part B
Paragraph
3.1(c)
Reference: L PART B-3.1(c) page 135
“Subcontractors and JV Team Members shall provide the same information (including the Total
Compensation Plan), as that required for the
Prime Contractor unless otherwise noted herein.”
Question: In section L 1.5 a "principal subcontractor" is any subcontractor with 20%
Yes, P7 is required for all subs proposing on this RFP.
work share of the proposed price. In Section L
3.0 Volume 3 it states that all subcontractors will
provide the same information as the Prime unless otherwise noted. Is it the government's intent to want a full submittal package, P7 Cost Template and cost narrative from every sub regardless of the % of work?
25 OCONUS
Travel
140 Section L
Part B
Paragraph
3.6.2.5
Reference: L-3.6.2.5 OCONUS Travel (page 140)
Question: Will the Government clarify the expected or historical percent of OCONUS travel anticipated and whether the travel into the AOR typically exceeds 30 days per trip?
OCONUS travel normally occurs on one platform and does not exceed two weeks.
This happens twice a year, 3 times a year at the most. This requirement could change but with COVID-19 it has actually been reduced.
26 Standard
Work
Packages
(SWPS)
18 Section C
SOW
Paragraph
2.0
Reference: SOW 2.0, page 18 Standard Work
Packages (SWPS) “A comprehensive list of Navy regulatory documents can be found at the
Department of the Navy (DON) Chief
Information Officer (CIO) Information
Technology (IT) Policy and Guidance website, http://www.doncio.navy.mil/.”
Question: We performed a search of the website provided as the source for these files
(http://www.doncio.navy.mil) and could not find them. Request the Government provide an alternate source for Standard Work Packages files.
The SWPs are not Navy documents but rather NAVAIR-specific documents and as such, are behind the NMCI firewall. Copies can be provided to prospective offerors.
27 Hardware and
Software
Technical
Plans
29 Section C
SOW
Paragraph
3.3.1.1
Reference: SOW 3.3.1.1 Hardware and Software
Technical Plans page 29 “The Contractor shall review and comment on the technical plans of hardware and software by writing or updating hardware and software technical plans based on
NAVAIR/NAWCAD provided information.”
Question: Several areas of the RFP seem to present mixed messages regarding the focus of required activities. The phrase “review and comment on the technical plans of hardware and software” seems to indicate a requirement to analyze existing technical plans while the phrase
“by writing or updating hardware and software technical plans” seems to indicate a requirement to generate or update technical plans. Which of these interpretations is correct?
The contractor will be required to both review, analyze and comment on existing technical plans as well as generate and update new technical plans.
28 Labor
Category
List
41;
13;
and
Section C
SOW
Sections
Paragraph
3.4.6 and
3.4.7;
Section B-1
Table (a);
Section L
Part B
Paragraph
3.6.3
Reference: SOW Sections 3.4.6 (page 41) and
3.4.7 (page 43), and on B-1 Table (a)(page13); L-
PART B-3.6.3 (page 141)
Question: The labor Category list differs from the
LCAT lists in section L-PART B-3.6.3 (Page
141). Please confirm that the list in 3.6.3 is correct per the instructions for pricing purposes.
Example. There is only a Sr. Network Engineer listed in SOW sections 3.4.6 and 3.4.7 but there is a Junior, Journeyman and Senior listed in section
L-PART B-3.6.3 with hours associated.
Yes, the table in section 3.6.3 is updated to match section 3.4.7.
29 LABOR
TERM
Table
16 Section B-1
(3) (b)
Reference: Section B-1 (b) LABOR TERM table
Question: Please confirm that the table should be for Contractor Site Hours?
On the bottom of page 15, " (b) Hourly
Burdened Composite Labor Rates for
Contractor Site" is the label for the table for continuation page 16.
30 Compatibilit y
20 Section C
SOW
Section
Paragraph
3.1.1
Reference: Section 3.1.1 Compatibility, RFP Page
20.
The Government states that for compatibility, the internet access applications should be "Internet
Explorer, Google, and Firefox web browsers". We would like to clarify the following:
1) Is Internet Explorer intended to also include
Microsoft Edge?
2) Is Google intended to reference the Chrome browser provided by Google?
3) Given that Internet Explorer is referenced, does the Government anticipate older systems and equipment that will use Internet Explorer without the ability to access the Microsoft Edge browser?
Use of specific web browsers will be detailed in the tasks orders. For NMCI applications, the browsers could include
Explorer, Edge, Chrome and/or Firefox.
NAVAIR does not control NMCI, so we will need to follow suit, as NMCI adds, deletes and updates them periodically. As for non-
NMCI applications, specific programs will determine web browser requirements.
31 Staffing
Plan
131 Section L
Part B
Paragraph
1.2.1
Reference: Section 1.2.1 Staffing Plan, RFP Page
131.
The Government asks for number of personnel across all labor categories to perform the work.
For the purposes of responding to this requirement while also minimizing the risk of losing highly- qualified and experienced incumbent personnel, can the Government comment on the extent of the current incumbent workforce. Specifically, is the incumbent workforce deficient in terms of total staffing, skillsets, or capability to perform the work under the scope of this solicitation?
The Government will not provide information concerning the incumbent's workforce.
32 Labor
Qualities
43-45 Section C
SOW
Section
Paragraph
3.4.7
Reference: Section 3.4.7 Labor Qualities, RFP
Pages 43-45.
The table shows Project Managers as Key
Personnel; however, the total FTEs for these key personnel is 2.5. The Government has asked in
Section 1.2.1 on page 131 of the RFP for 3 key personnel resumes in this labor category. Can the
Government please clarify expectations regarding a key person who would be proposed for this effort but only needed for half-time support? Is the Government's intent to fully engage all three key persons or does the Government only expect a total of 2.5 FTEs of access and support from the three Key Personnel Project Managers?
The table provides estimates of projected staffing under this contract. Task orders will provide specific personnel and tasking requirements. Should a delivery/task order require only .5 time of a project manager, we envision that the other half of a project manager's time would be in one of the other labor categories on the contract, i.e., half-time managing the work and half-time actually doing the work.
33 Overtime 24 Section C
SOW
Section
Paragraph
3.1.4.1.5
Reference: Section 3.1.4.1.5 Overtime, RFP page
24.
Can the Government clarify the definition of
"overtime" for this contract? For example, if employees were to work more than 40hrs per week uncompensated, would this violate the intent of this SOW section? Alternatively, if employees were to work more than 40hrs but be compensated at their normal rate of pay (within labor allowances for a given task order), would this violate the intent of this SOW section?
Historically, the disallowance of overtime can be interpreted to only apply to hours compensated at an additional rate and not explicitly to additional hours either uncompensated or compensated at normal rate of pay.
The Government intends to have no overtime authorized and employees who were to work more than 40 hrs per week uncompensated, will violate the intent of the SOW Section
Paragraph 3.1.4.1.5.
34 Installation
Closure
23 Section C
SOW
Section
Paragraph
3.1.4.1.3
Reference: Section 3.1.4.1.3 Installation Closure, RFP Page 23.
The clause states: "When Federal facilities are closed by the Government, or when Federal employees are officially excused from work...Contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company's policies".
Two questions arise from this section:
1) Since some employees will work offsite in a contractor facility, this clause would never apply to them (they are not "assigned to work at that facility in support of such Federal employees"). Is that the intent of this SOW element?
2) The clause regarding following "parent company policies" could result in different rules for different subcontractors on the same contract.
Is that the intent of this SOW element?
If the employee is working on Contractor facility the clause will not be applicable to them (this is reference to Government Site
Only). Subcontractors must report to the
Prime who will decide what is applicable.
35 Technical
Direction
Letters
(TDLs)
25 Section C
SOW
Section
Paragraph
3.1.11
Reference: Section 3.1.11 Technical Direction
Letters (TDLs), RFP Page 25.
Can the Government provide historical records of
TDLs provided for the past 6 or 12 months? The nature of TDLs could be a necessary part of understanding the contract execution for non-incumbent offerors. We recognize that TDLs do not alter the scope of the contract, but they could be needed to fully understand the interaction between contractor and Government for the execution of this requirement.
There are no known historicals of TDLs for this effort. It has not been part of this contract.
36 Citizenship
Requirement s
26 Section C
SOW
Section
Paragraph
3.2.1
Reference: Section 3.2.1 Citizenship
Requirements, RFP Page 26.
Has the Government granted a citizenship waiver for the execution of these contract requirements in the past 12-24 months? In our experience, this is a rare clause for a contract scope such as this one and understanding the impact of this clause is necessary to adequately evaluate staffing and compensation requirements for this effort.
No.
37 Maintain
On-Site
Software
Build
Library
35 Section C
SOW
Section
Paragraph
3.3.5.6
Reference: Section 3.3.5.6, Maintain On-Site
Software Build Library, RFP Page 35.
What is the approximate number of software builds maintained in the on-site software build library? This information is needed to fully evaluate and ensure adequate support and expertise for support of this requirement. Further, does the software build library need to maintain older systems and equipment (including old disk media) to maintain this library?
The number of software builds in the software build library, as well as the age of systems and equipment, will vary between delivery orders and tasks orders. The contractor will have the opportunity to evaluate those items to ensure adequate support when the delivery orders and tasks orders are generated after contract award.
38 Other
Government documents:
(e.g.
NAVAIR
Documents)
19 Section C
Section C
SOW
Paragraph
2.3
Reference: Section 2.3, Other Government documents: (e.g. NAVAIR Documents):, RFP
Page 19.
Reference is made to NAWC Software
Engineering SWPs and specifically SWP-4940-
001 through SWP-4940-0029. Can the
Government provide copies of these processes so that non-incumbent offerors have equal access to process documentation and can adequately respond to software development tasks in the
RFP?
Yes, we can provide copies of the SWPs.
39 Drafter / CD
Operator I
(Non-Key)
(Secret)
(SCA
30061)
(SOC 17-
3012)
54 Section C
SOW
Paragraph
3.4.7.17
Reference: Section 3.4.7.17 Drafter / CD
Operator I (Non-Key) (Secret) (SCA 30061)
(SOC 17-3012), RFP Page 54.
We strongly recommend that multiple levels be established for the Drafter/CAD Operator position. If the contract only provides the potential for Level I support in this labor category, development for employees in this category will be limited within the contract and this will likely drive attrition rates. Strongly recommend adding labor categories similar to the
Engineering Technician labor category in section
3.4.7.1.
Since the Drafter/CAD operator is a niche labor category (only .5 MY across the entire contract), we don't think this is necessary.
We can live with attrition in this category.
40 CRM &
Technical
Volume
127 Section L
Part A 3.5
L.3.5 on page 127 states that a CRM is required for the technical volume, but later states that the
CRM should, "cross-reference the proposal volumes (plural) and paragraphs to specific RFP requirements".
Please confirm the
CRM is only required for Volume 1 – Technical.
CRM is required for Volume 1 - Technical and for Past Performance under Past
Performance Cross Reference Matrix (CRM)
Annex 2.
41 Security
Clearance
132 Section L
Part B
Paragraph
1.3.1.1.4
The final RFP included a new requirement on page 132 (L.1.3.1.1.4 Security Clearance), which requires written certification of a Top Secret
Facility Clearance. Will the government consider allowing Offeror’s to provide the written certification as an appendix to Volume 1 outside of the 15-page limit of the management plan?
The Government has increased the page count to 10 for the written certification of a
Top Secret Facility Clearance portion which will be included within the Technical
Volume 1.
42 Security
Clearance
132 Section L
Part B
Paragraph
1.3.1.1.4
The final RFP included a new requirement on page 132 (L.1.3.1.1.4 Security Clearance), which requires plans for meeting personnel security requirements within 60 days of award. Given
L.1.3.2.1.(e) requires a transition plan that considers, “Security Requirement to include
OPSEC, facility clearances, and base access,” will the government consider removing the new requirement under L.1.3.1.1.4?
The Government will not remove the new requirement. Personnel performing these duties must meet the requisite security clearance requirements in order to be able to perform their duties. The appropriate clearance must be in place for the personnel to perform these functions.
43 Past
Performance
126 &
Section L
Part A
Paragraph
3.1, 3.3 and
3.4; Section
L Part B
Paragraph
2.1.2
The table under L.3.3 states that the past performance volume is one electronic file and
L.2.1.2 states that the
Offeror shall complete the Past Performance
Information Form, Attachment P1, for each past performance reference. However, L.3.1 on page
126 states that, "Proposal information must be structured such that its Volume/paragraph number matches the Proposal Instructions
Volume/paragraph number provided in section
“Part B Specific Instructions” to which it is responding..." Further, L.3.4 states that each volume shall contain a cover page and table of contents. Attachment P1 does not allow an
Offeror to comply with the requirements outlined in L.3.1 and L.3.4. Will the government consider increasing the number of files to be submitted for the past performance volume - One file to comply with L.3.1 and L.3.4 and one file for each P-1 form?
4.2.4 DoD SAFE specific limitations per
drop-off: one package per drop-off, the maximum file size per package is eight (8) gigabytes and the maximum file upload per package is 25 files. The Government will provide one drop-off request to the Offeror and one drop-off request to each proposed subcontractor. This language is added to the
RFP under Section L paragraph 4.2.4.
44 Past
Performance
132 Section L
Part B
Paragraph
2.1.2
L.2.1.2 states that the Offeror shall complete the
Past Performance Information Form, Attachment
P1, for each past performance reference. Graphics and/or tables cannot be entered into the Contract
On page 125, under 2.0 ELECTRONIC
PROPOSAL FORMAT, Section 2.1
"Drawings that are not imbedded within the text and submitted separately will be counted
Effort Description box within Attachment P1. For ease of evaluation, will the Government allow
Offerors to insert PDF pages into the P1 to organize content in tables/graphics to clearly and succinctly demonstrate relevancy?
as one page. Graphic resolution, including such data as tables, charts, or drawings, should be consistent with the purpose of the data presented. 2.2 Files shall not be embedded in PDF documents.
45 Drop-Off
Request
Code
126 Section L
Part A
Paragraph
2.2
Page 126 (Para. L.2.2) states that, "The Prime and
Subcontractor points of contact will receive an email that contains their unique “Drop-Off
Request Code” no less than 3 days prior to the proposal due date." With the proposal being due on a Monday, this provides limited time to confirm the Drop-Off Request Code has been received and mitigate any potential uploading issues within the DoD system. Will the government consider providing the Drop-Off
Request Code at least one week before the proposal due date?
No changes will be made concerning Drop-
Off Request Code.
46 Staffing
Plan
131 Section L
Part B
Paragraph
1.2.1
L.1.2.1 on page 131 requires a staffing plan that addresses items such as proposed subcontractor, consultant, or teaming arrangements; availability of personnel; and conformance with Section L, Paragraph 3.6.3, but Section M does not provide evaluation criteria for these requirements. How does the government intend to evaluate the requirements of L.1.2.1?
The Government will assess the clarity and thoroughness of the staffing plan, including the degree to which the proposed allocation of personnel resources demonstrates the
Offeror’s ability to meet the requirements of the SOW. The Offeror’s proposal will be evaluated to ensure that it complies with the
Government estimated labor mix and level of effort mandated by Section L, Part B, paragraph 3.6.3. This statement is added in
Section M under workforce.
47 Small
Business
(SB)
Utilization
Strategy
133 Section L
Part B
Paragraph
1.3.3
On page 133, the Small Business (SB) Utilization
Strategy requires evidence of enforceable commitments. In an effort to avoid potential file size issues when uploading into the DoD SAFE site, can Offerors provide the enforceable commitment documentation as a separate Annex
3 file?
Please see question 44.
48 LABOR
TERM
(Governmen t Site Hours)
16 Section B-1
(3)(b)
On page 16, Paragraph B1(b) states, "LABOR
TERM (Government Site Hours). Was it the
Government's intention to label this table as
LABOR TERM (Contractor Site Hours)?
On the bottom of page 15, " (b) Hourly
Burdened Composite Labor Rates for
Contractor Site" is the label for the table on page 16.
49 Labor
Categories
43 &
Section C
SOW
Paragraph
3.4.7 and
Section L
Part B
Paragraph
3.6.3
Section C Paragraph 3.4.7 lists Computer
Network Architect, Junior & Computer Network
Architect, Journey while Paragraph 3.6.3 lists
Network Engineer, Junior & Network Engineer, Journey. Would the Government please confirm that 3.4.7 reflects the labor categories to be used in this solicitation and correct?
Yes, as previously mentioned, section 3.4.7 is correct and table 3.6.3 has been updated to match 3.4.7.
50 Electronic
File
126 Section L
Part A
Paragraph
3.3
Section L, Paragraph 3.3 states that one electronic file is required for the cost volume. Would the
Government please confirm the expectation is for four (4) separate electronic files total, to include the
Attachments P3, P6/P7, P8, and the Cost/Price Narrative for
Volume III?
The Government confirms that one electronic file is needed for P6, P3, P8 and the cost narrative. Each subcontractor will have to submit P7.
51 Labor
Qualities
47 Section C
SOW
Paragraph
3.4.7;
The attachments P3, P6, P7, and P8 templates do not include Computer Network Architect, Junior or Computer Network Architect, Journey as presented in the Table found in Section C, Section 3.4.7 is correct. The Government has updated Attachments P3, P6, P7 & P8.
Attachments
P3, P6, P7, & P8
Paragraph 3.4.7. Will the government please confirm that the labor categories found in Section
C are the intended labor categories for Offerors to bid.
52 Past
Performance
148 Section M
Part A
Paragraph
2.3
Page 148 Paragraph M.2.3 states, “more relevant past performance will typically be a stronger predictor of future success and have more influence on the
Performance Confidence Assessment Rating.”
Paragraph 3.0 on page 152 defines a “relevant” rating as, “Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.”
By deleting the “very relevant” element from the ratings scheme, the government has conflated
“same” and “similar” performance. If, indeed, “more relevant past performance will typically be a stronger predictor of success,” why would the government not credit an Offeror’s Past
Performance involving essentially the same scope and magnitude of effort and complexities over an
Offeror’s Past Performance that merely includes a similar scope and magnitude of effort and complexities?
FAR PART 15.304 guidance is to ensure the evaluation factors and significant subfactors represent key areas of importance to be considered in the source selection decision, and that those factors and subfactors support meaningful comparison and discrimination between and among competing proposals.
Would the government consider including the
“Very Relevant” rating found in most solicitations
(and contained within the original draft) that typically include a Past Performance Relevancy
Rating of four levels, to properly credit an
Offeror’s Past Performance involving essentially the same scope and magnitude of effort and complexities over an Offeror’s Past Performance that merely includes a similar scope and magnitude of effort and complexities to support a more meaningful comparison and discrimination between and among the competing proposals?
Government will not revise or make any changes to Section M Part A Paragraph 2.3
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lot Labor - Term - In support of SOW
CPFF
Services in accordance with Section C, Statement of Work (SOW) paragraph 3.3
FOB: Destination
PURCHASE REQUEST NUMBER: 1300838592
PSC CD: R425
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
Labor - Term - NWCF
CPFF
Not Separately Priced (NSP) from CLIN 0001
FOB: Destination
Labor - Term - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0001
Labor - Term - O&MN
CPFF
Not Separately Priced (NSP) from CLIN 0001
Labor - Term - Procurement
CPFF
Not Separately Priced (NSP) from CLIN 0001
Labor - Term - FMS
CPFF
Not Separately Priced (NSP) from CLIN 0001
0007 Lot ODC - Travel/Material supporting SOW
COST
Other Direct Cost (ODC) in support of CLINs 0001 in accordance with Section C, Statement of Work (SOW) paragraph 3.1.5 Other Direct Costs (ODCs), 5252.232-
9509 Travel Approval and Reimbursement Procedures, and 5252.242-9515
(Variation), Restriction of the Direct Charging of Material.
ODC - Travel/Material - NWCF
COST
Other Direct Cost (ODC) Not Separately Priced (NSP) Other Direct Costs (ODC) from CLIN 0007
ODC - Travel/Material - RDT&E
COST
Other Direct Cost (ODC) Not Separately Priced (NSP) Other Direct Costs (ODC) from CLIN 0007
ODC - Travel/Material - OMN
COST
Other Direct Cost (ODC) Not Separately Priced (NSP) Other Direct Costs (ODC) from CLIN 0007
ODC - Travel/Material - Procurement
COST
Other Direct Cost (ODC) Not Separately Priced (NSP) Other Direct Costs (ODC) from CLIN 0007
ODC - Travel/Material - FMS
COST
Other Direct Cost (ODC) Not Separately Priced (NSP) Other Direct Costs (ODC) from CLIN 0007
Administrative/Financial/Technical Data
COST
In support of Labor (Term) and ODC CLINs. Not Separately Priced (NSP) Data in support of SOW
0014 Lot Foreign-Area Allowance
CPFF
Foreign-Area Allowance in accordance with Section C, Statement of Work
(SOW) paragraph 3.1.4.1.6 in support of Section 3.3
Foreign-Area Allowance - NWCF
CPFF
Not Separately Priced (NSP) from CLIN 0014
Foreign-Area Allowance - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0014
Foreign-Area Allowance - OM&N
CPFF
Not Separately Priced (NSP) from CLIN 0014
Foreign-Area Allowance - Procurement
CPFF
Not Separately Priced (NSP) from CLIN 0014
Foreign-Area Allowance - FMS
CPFF
Not Separately Priced (NSP) from CLIN 0014
0020 Lot Foreign-Area Allowance
COST
Foreign-Area Allowance in accordance with Section C, Statement of Work
(SOW) paragraph 3.1.4.1.6 in support of Section 3.3
Foreign-Area Allowance - NWCF
COST
Not Separately Priced (NSP) from CLIN 0020
Foreign-Area Allowance - RDT&E
COST
Not Separately Priced (NSP) from CLIN 0020
Foreign-Area Allowance - OM&N
COST
Not Separately Priced (NSP) from CLIN 0020
Foreign-Area Allowance - Procurement
COST
Not Separately Priced (NSP) from CLIN 0020
Foreign-Area Allowance - FMS
COST
Not Separately Priced (NSP) from CLIN 0020
Contractor Acquired Property
COST
Delivered Contractor Acquired Property (CAP) in accordance with Section C
SOW paragraph 3.1.5.2. In support of ODC CLINs. Not Separately Priced (NSP)
CLAUSES INCORPORATED BY FULL TEXT
5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012)
(a) The level of effort estimated to be ordered during the term of this contract is 1,860,000 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows:
CLIN TOTAL Man-Hours
0001 1,860,000
(b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or
52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.
B-1
Task Orders (TOs) that include CPFF Labor Term CLINs will be issued under this contract using the following streamlined ordering procedures:
(1) For each proposed order that includes CPFF Labor Term CLINs, the contracting officer will provide the
Contractor a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the Hourly Burdened Composite Labor Rates provided in table(s) below, to calculate the total estimated cost for the proposed CLINs and/or TO.
i. The TO fixed fee is calculated using Section G Clause 5252.232-9510 PAYMENT OF FIXED FEE
(NAVAIR).
ii. Ceiling for ODCs will be priced in accordance with the Government estimate.
iii. TOs crossing multiple years will be estimated by the Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .