Attach 1 CSP.pdf

PDF 294 KB Posted

Attached to
Software Engineering Department Support Services Federal contract opportunity
Solicitation number
N00421-20-R-0127
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains a Contract Surveillance Plan (CSP) and associated Surveillance Activity Checklist (SAC) for a software engineering department support services contract to be awarded by the Naval Air Warfare Center Aircraft Division. The incumbent contractor will provide software systems engineering support throughout the life cycle of weapon systems from concept to disposal. Key details include:

  • The contract will be a single-award IDIQ with a five-year ordering period and cost-plus-fixed-fee and cost reimbursable CLINs. Support will include software sustainment, systems engineering, integration, development, test, acquisition, and laboratory engineering for Naval aircraft weapons and support systems. The COR will perform quarterly assessments of quality, schedule, cost control, regulatory compliance, and management using the SAC ratings of exceptional, very good, satisfactory, marginal, and unsatisfactory. An annual CPARS report will also be issued.

View the file

Other files for this federal contract opportunity

Other files attached to Software Engineering Department Support Services, newest first.
File Type Posted
N00421-20-R-0127-0002.pdf PDF
N00421-20-R-0127-0002_CONFORMED.pdf PDF
0127_Attachment_P6_PRIME_Cost_Summary_Spreadsheet_V3.xlsx XLSX spreadsheet
0127_Attachment_P7_Subcontractor_Cost_Summary_Spreadsheet_V3.xlsx XLSX spreadsheet
N00421-20-R-0127-0001.pdf PDF
0127_Attachment_P3_Composite_Labor_Rate_Fee_Worksheet_V2.xlsx XLSX spreadsheet
N00421-20-R-0127-0001_Conformed.pdf PDF
0127_Attachment_P8_Annual_Fully_Burdened_Labor_Rates_V2.xlsx XLSX spreadsheet
Exhibit A_Attachments to CDRL A008_A009.pdf PDF
0127_Attachment_P8_Annual_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attach 3 OCI_List.pdf PDF
0127_Attachment_P7_Subcontractor_Cost_Summary_Spreadsheet_V2.xlsx XLSX spreadsheet
RFP N00421-20-R-0127.pdf PDF
0127_Attachment_P6_PRIME_Cost_Summary_Spreadsheet_V2.xlsx XLSX spreadsheet
Attach P2 Performance Assessment Questionnaire.pdf PDF
0127_Attachment_P3_Composite_Labor_Rate_Fee_Worksheet.xlsx XLSX spreadsheet
Attach 2 BID DD254.pdf PDF
Attach P1 Past_Performance_Information_Form.pdf PDF
Attach 2(a) 2019 DD254 STILO Memo 15MAY2019.pdf PDF
Attach 6 Sexual Assault and Sexual Harassment Training Criteria.pdf PDF
Attach 5 Data_Item_Transmittal_Form.pdf PDF
Exhibit A_SW ENG DEPT CDRL List - 12_Jun_2020.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Official Use Only

Source Selection Information. See FAR 2.101 and 3.104

Contract Surveillance Plan (CSP) for the Naval Air Warfare

Center (NAWCAD) Software Engineering Department

1. Purpose

This Contract Surveillance Plan (CSP) and the Surveillance Activity Checklist (SAC) (enclosure 1) is a

Government developed and applied document to ensure that systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Contractor performs in accordance with the SOW and the Government receives the quality of services called for in the contract and resulting task orders.

The Contract requirement is to provide The Software Engineering Department software systems engineering support needed in support of the Program Executive Office (PEO) programs and various

Naval Air Systems Command (NAVAIR) Program Management Air (PMA) activities. This includes direct software systems engineering support throughout the life cycle of a weapon system from concept development through disposal, and applied to Naval Aircraft weapons and support systems for the

United States (U.S.) domestic military programs and Foreign Military Sales (FMS) programs. This contract provides highly focused and specialized software engineering and technical support services for the acquisition, development, deployment and sustainment phases of a weapon system, across a wide range of Naval Air Programs for aircraft systems and subsystems. Additional contract support includes the development of operational systems and integration, as well as the ability of that software to be inter-operable with other Navy platforms. Representative samples of the contractor support requirements includes: Software Systems Engineering, Systems/Subsystems Software Integration, Software

Development, Test, Software Acquisition, Laboratory Engineering and Integration, Avionics/Software/Air Vehicle Technology Insertion, Platform Simulation, Configuration Management, and Program Performance Assessment and Analysis/Planning during the Acquisition and Sustainment phases.

The Contractor shall work independently and without direct government supervision. The Contractor shall be responsible for training and equipping its employees to complete the technical requirements in accordance with applicable government laws, regulations, and directives.

The resultant contract is anticipated to be a non-performance based services single award Indefinite

Delivery Indefinite Quantity (IDIQ) contract with Cost Plus Fixed Fee (CPFF) Level of Effort (LOE)

Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for materials and travel. The contract period of performance consists of a five-year ordering period. Task orders will be issued as required and the period of performance will be determined upon award of each task order.

Multiple Lines of Accounting (LOAs), as well as, multiple incremental funding actions have been identified for prospective task orders driving the need for increased CLINs. In order to mitigate increased workload in post-award execution Technical Directive Letters (TDLs) will be implemented at the task order level as appropriate. TDLs comply with DFARS 204.7103-1 by establishing appropriation

CLINS and utilizing both Information Sub-Line Item Numbers (SLINs) (infoSLINs) and a Segregation of Cost/Invoice CDRL to further delineate tasking.

Source Selection Information. See FAR 2.101 and 3.104

A properly executed CSP will assist the Government in achieving the objectives of this procurement and clearly defines performance expectations. Additionally, the contractor will be incentivized to perform successfully by having the quality of performance evaluated and documented. Further, a condition of executing new task orders and exercising option periods will require a rating of satisfactory or better in the CPARS.

2. Authority

Authority for issuance of this SAC is provided in the contract under Section E - Inspection and

Acceptance, which provides for inspection and acceptance of the services and documentation called for in contract and resulting task orders, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the responsibilities of the parties, it is important to first define the distinction in terminology between the Quality Control Plan and the CSP. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract and task orders. The SAC is put into place to provide Government surveillance oversight of the Contractor’s efforts to ensure that they are timely, effective, and are delivering the results as specified in the contract and resulting task orders.

4. Government Resources

The following definitions for Government resources are applicable to this CSP:

Contracting Officer - The person duly appointed with the authority to enter into (Procuring Contracting

Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract will be designated in the resulting contract. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the order. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Technical Point of Contact (TPOC) – The TPOC focus is making sure that the final product or service meets the contractual technical requirements. A TPOC will be identified on each Task Order.

5. Responsibilities

The following Government resources shall have responsibility for the implementation of this CSP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United

States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the task order. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract and task order price, terms, or

Source Selection Information. See FAR 2.101 and 3.104 conditions shall be referred to the Contracting Officer for action. The COR will be appointed at the contract level, meaning the COR will be responsible for technical administration and government surveillance of all resulting task orders.

Technical Point of Contact (TPOC) – The TPOC focus is making sure that the final product or service meets the contractual technical requirements. The TPOC is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract and task order price, terms, or conditions shall be referred to the Contracting

Officer for action. The Task Order TPOC will provide feedback to the COR that will be used to document surveillance of performance.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Report System (CPARS) – The market place for engineering and technical contractor support services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS ratings for this contract and resulting task orders. For this procurement, the Government will address the quality of product of services, schedule, cost control, regulatory compliance, management, and other pertinent contract areas. As this information may affect future source selections throughout the

Department of Defense (DoD), the Government assessment will be used appropriately as an additional performance oversight and communication tool.

b. SAC - The methods of surveillance listed in the SAC (enclosure 1) shall be used by the COR in the technical administration of the task order SOW.

c. Observation, Feedback and Review – Unscheduled observation of products and services provided by the contractor on site and recurring review of the contractor submitted reports, and documentation identified in the CDRL(s) will be performed by the COR. Feedback from the

Task Order TPOCs will be collected and used by the COR to document surveillance of performance.

7. Surveillance

The SAC (enclosure 1) will be provided to the Contractor on a Quarterly basis each year, as applicable.

The SAC will provide feedback on the performance of the Contractors management and quality control actions for services and products provided under this contract and resulting task orders. Enclosure (1) will also be used to document the Quarterly surveillance reporting requirement and the Monthly COR reporting via the Surveillance and Performance Monitoring (SPM) Module.

8. Documentation

In addition to providing Monthly reports to the Contracting Officer, the COR will maintain a complete quality assurance file in the SPM Module. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the original copies of the SACs. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract and task orders.

9. Enclosures

Enclosure (1) - Surveillance Activity Checklist

Source Selection Information. See FAR 2.101 and 3.104

Enclosure (1) Surveillance Activity Checklist

SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following:

Quality of Product or Service – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess accuracy of reports/data and how successfully the Contractor meets program quality.

Schedule – Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules and administrative requirements. This assessment of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the assessment period that contribute to or affect the schedule variance. This element applies to contract closeout activities as well as contract performance.

Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling costs.

Assess the contractor’s ability to perform within the total estimated cost; cost growth or under run and applicable causes. Assess any innovative approaches implemented by the Contractor that resulted in cost savings. In addition, assess the extent to which the contractor demonstrates as sense of cost responsibility, through the efficient use of resources in each work effort.

Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clear Water Act), safety and labor regulations as well as any other reporting requirements in the contract terms and conditions.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activities needed to execute the contract and resulting task orders. Discuss the extent to which the contractor identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required, and communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the individual task orders.

Other Areas – Assess additional evaluation areas unique to the individual task order or that cannot be captured elsewhere.

The evaluation ratings for all areas are as follows:

Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task/sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.

Source Selection Information. See FAR 2.101 and 3.104

Metrics – Exceptional:

• Quality: Fully meets all quality expectations and requirements more than 95% of the time; and corrective action was acceptable and effective.

• Schedule: Meets all schedule/delivery due dates more than 95% of the time and corrective action taken for past due items was appropriate and effective.

• Cost Control: Cost is within 5% of forecast based on most recent changes approved by the government.

• Regulatory Compliance: The contractor meets all of the government’s expectation for compliance of regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than 95% of the time; and corrective action was acceptable and effective.

• Management: Management of subcontracts, coordination of activities, applies resources required to meet schedule and contract requirements; assignment of responsibility for asks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner

95% of the time.

• Other: Meets requirements more than 95% of the time.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit.

The contractual performance of the task/sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Metrics – Very Good:

• Quality: Fully meets all quality expectations and requirements more than 90% of the time; and corrective action was acceptable and effective.

• Schedule: Meets all schedule/delivery due dates more than 90% of the time and corrective action taken for past due items was appropriate and effective.

• Cost Control: Cost is within 10% of forecast based on most recent changes approved by the government and explanation of cost deviation was acceptable.

• Regulatory Compliance: The contractor meets or exceeds some of the government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than

90% of the time; and corrective action was acceptable and effective.

• Management: Management of subcontracts, coordination of activity and applies resources required to meet schedule and contract requirements; assignment of responsibility for tasks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner more than 90% of the time and the Contractor is making necessary adjustments to meet government expectation.

• Other: Meets requirements more than 90% of the time and is taking appropriate corrective action to improve performance.

Source Selection Information. See FAR 2.101 and 3.104

Satisfactory - Performance meets contractual requirements. The contractual performance of the task/sub-task contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.

Metrics – Satisfactory:

• Quality: Fully meets all quality expectations and requirements more than 80% of the time; and corrective action proposed/taken is appropriate.

• Schedule: Meets all schedule/delivery due dates more than 80% of the time and time corrective action taken for past due items was appropriate and effective.

• Cost Control: Cost is within 15% of forecast based on most recent changes approved by the government and explanation of cost deviation is acceptable; and proposed cost mitigation is acceptable.

• Regulatory Compliance: The contractor meets the government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions more than 80% of the time; and corrective action was satisfactory.

• Management: Management of subcontracts, coordination of activity and applies resources required to meet schedule and contract requirements; assignment of responsibility for tasks/actions; risk mitigation plans; and communication meet expectations and are performed in a timely manner more than 80% of the time and the Contractor is making necessary adjustments to meet government expectation.

• Other: Meets requirements more than 80% of the time and the Contractor is taking appropriate corrective action to improve performance.

Marginal - Performance does not meet some contractual requirements. The contractual performance of the task/sub-task being assessed reflects a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Metrics – Marginal:

• Quality: Meets quality expectations and requirements less than 70% of the time; and corrective action proposed/taken is often not appropriate.

• Schedule: Meets schedule/delivery due dates less than 70% of the time and corrective action taken for past due items was often not appropriate and ineffective.

• Cost Control: Cost was not within 20% of forecast based on most recent changes approved by the government or explanation of cost deviation was not acceptable; or proposed cost mitigation was not acceptable.

• Regulatory Compliance: The contractor meets the government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting

Source Selection Information. See FAR 2.101 and 3.104 requirements as specified in the contract terms and conditions less than 70% of the time; and corrective action has not yet been taken or actions were marginal or not fully implemented.

• Management: Management of subcontracts, coordination of activity and application of resources to meet schedule and contract requirements; or assignment of responsibility for tasks/actions; risk mitigation plans and communication meet expectations less than 70% of the time and the

Contractor is not making necessary adjustments to meet government expectation.

Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task/sub-task contains a serious problem(s) for which the Contractor’s actions appear or were ineffective.

Metrics – Unsatisfactory

• Quality: Meets quality expectations and requirements less than 60% of the time; and corrective action proposed/taken is not appropriate or ineffective. Contractor is unlikely to meet quality expectations in the near future.

• Schedule: Does not meet all schedule/delivery due dates less than 60% of the time or corrective action taken for past due items was not appropriate or ineffective. Contractor is responsible for the failure to meet schedule and is likely to continue to fall behind schedule.

• Cost Control: Cost was more than 20% of forecast based on most recent changes approved by the government or explanation of cost deviation was not acceptable; or proposed cost mitigation was not acceptable or ineffective. The Contractor had the opportunity to control and failed to do so and is unlikely reduce cost or maintain the current cost deficit.

• Regulatory Compliance: The contractor meets the government’s expectation for compliance of all regulations and codes related to financial, environmental, safety and labor as well as any reporting requirements as specified in the contract terms and conditions less than 60% of the time; and corrective action was ineffective, not yet taken or unlikely to meet compliance or reporting requirements in the near future.

• Management: Management of subcontracts, coordination of activity and application of resources to meet schedule and contract requirements; or assignment of responsibility for tasks/actions; or risk mitigation plans; or communication to meet expectations are not performed in a timely manner less than 60% of the time or is not making necessary adjustments to meet government expectation.

The Contractor is unlikely to establish control in the near future.

• Other: Meets requirements less than 60% of the time or is not taking appropriate corrective action to improve performance. The Contractor is unlikely to meet requirements in the near future.

Source Selection Information. See FAR 2.101 and 3.104

SURVEILLANCE ACTIVITY CHECKLIST

Quarterly

The COR will perform a Quarterly assessment of Quality, Schedule, Cost Control, Regulatory

Compliance, Management and Other Areas to the PCO for approval. A yearly summary will be sent to the contractor via CPARS utilizing the evaluation ratings listed above.

PERFORMANCE STANDARDS – TASKS

Source Selection Information. See FAR 2.101 and 3.104

Description

Surveillance

Method/Meas ure

Date

Planned

Date

Completed Quality Schedule

Cost

Control

Regulatory

Compliance Management Other

Mission Analysis

Support, SOW Para

3.3.1

Surveillance by COR, and

TPOC

Feedback

Signal Processing

Requirements

Support, SOW Para

3.3.2

Surveillance by COR, and

System Requirements

Definition Support for Hardware and

Software, SOW Para

3.3.3

Surveillance by COR, and

System

Design/Development

Support for Hardware and Software, SOW

Para 3.3.4

Surveillance by COR, and

Software

Development

Support, SOW Para

3.3.5

Surveillance by COR, and

Software Product

Deliverables (SPD)

Support, SOW Para

3.3.6

Surveillance by COR, and

Test and Evaluation

Plans and Reports, SOW Para 3.3.7

Surveillance by COR, and

Fleet Training, SOW

Para 3.3.8

Surveillance by COR, and

Project Financial

Support, SOW Para

3.3.9

Surveillance by COR, and

Hardware and

Software Integration

Facilities and

Software Production

Facility (SPF) , SOW para 3.3.10

Surveillance by COR, and

Source Selection Information. See FAR 2.101 and 3.104

Integration Facility

Upgrade, SOW para

3.3.11

Surveillance by COR, and

Facility

Operator/User

Manual, SOW para

3.3.12

Surveillance by COR, and

Aircraft Testing, SOW para 3.3.13

Surveillance by COR, and

Data Base

Maintenance, SOW para 3.3.14

Surveillance by COR, and

Laboratory Security

Support, SOW para

3.3.15

Surveillance by COR, and

License Support

SOW para 3.3.16

Surveillance by COR, and

Source Selection Information. See FAR 2.101 and 3.104

PERFORMANCE STANDARDS - DATA

Description Surveillance

Method/Measure

Date

Planned

Date

Completed Quality Schedule

Cost

Control

Regulatory

Compliance

Management Other

CDRL A001 Monthly

Progress and Financial

Status, Report IAW

SOW 3.1.3.1

100% Inspection by COR and

TPOC feedback

CDRL A002 Technical

Reports, IAW SOW para 3.1.3.2

100% Inspection

CDRL A004

Contracting Officer’s

Management Report, IAW SOW para 3.1.3.4

100% Inspection

CDRL A005

Presentation Materials, IAW SOW para 3.1.3.5

100% Inspection

CDRL A008 Training

Program Structure

Document , IAW SOW para 3.1.3.8

100% Inspection

SAC Quarterly Summary of Ratings

For the period of: ____________

Quality Schedule Number of Exceptional ____ Number of Exceptional ____

Number of Very Good ____ Number of Very Good ____

Number of Satisfactory ____ Number of Satisfactory ____

Number of Marginal ____ Number of Marginal ____

Number of Unsatisfactory ____ Number of Unsatisfactory ____

Cost Control Regulatory Compliance

Number of Very Good ____ Number of Very Good ____

Number of Satisfactory ____ Number of Satisfactory ____

Management Other Areas

Number of Very Good ____ Number of Very Good ____

Number of Satisfactory ____ Number of Satisfactory ____

SAC ANNUAL SUMMARY OF RATINGS

FOR THE PERIOD OF: _______________

The COR will perform an Annual summary of overall contract performance utilizing the CPARS evaluation rating definitions listed above and the SAC Quarterly summary of ratings.

Description Surveillance Method

/Measure

Date

Planned

Date

Completed

Summary

Rating /

Results

Quality Review of Quarterly

Ratings

TBD

Schedule Review of Quarterly

Cost Control Review of Quarterly

Regulatory

Compliance

Review of Quarterly

Management Review of Quarterly

Other Areas Review of Quarterly

File details come from the government source that posted it. Updated .