Attachment 05 Contractor Surveillance Plan (CSP).pdf
PDF 345 KB Posted
- Attached to
- NAWCAD-WOLF-Counter Unmanned Air Systems (C-UAS)
- Solicitation number
- N00421-20-R-0102
About this file
This sources sought announcement is seeking capability statements from businesses for a potential single-award indefinite delivery indefinite quantity contract to provide engineering services in support of Naval Air Warfare Center Aircraft Division Webster Outlying Field counter unmanned air systems programs. Services required include in-service engineering, system component engineering and characterization, integration, shipping, training curriculum development, logistics engineering, supply management, testing, repair, laboratory maintenance, quality assurance, and technical management support. The anticipated period of performance is five years at locations including the Patuxent River Naval Air Station, Webster Field, and contractor facilities. Responses are requested by November 14, 2019 and should demonstrate experience with tasks including software development, security clearances, and management of subcontractors. The North American Industry Classification System code is 541330 and eligible businesses of all sizes are encouraged to respond.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-20-R-0102
Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Contract Surveillance Plan for
Counter Unmanned Air Systems (C-UAS)
1. Purpose
This Contract Surveillance Plan (CSP) document is developed and applied by the Government to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In
Accordance With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
This Contract is to provide In-Service Engineering Activity support (ISEA) of C-UAS systems;
engineering and characterization of system and sub-system components; integration of system and subsystem components; shipping of systems, sub-systems, components, and parts;
development of training curriculum, training materials, and delivery of formal training programs;
logistics engineering support; supply system management and material control; testing of C-UAS systems; repair of C-UAS systems; laboratory maintenance; quality assurance; and technical management support. The tasking may also include providing of C-UAS systems technical assistance by phone, electronic mail, or on-site aboard U.S. Navy ships, onboard shore installations, at the pertinent host country, aboard the host country’s ships, in theatre locations, or at other sites as directed by the U.S. Government.
This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The
Contract will have a five-year ordering period. A properly executed CSP will assist the
Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E - Inspection and
Acceptance, which provides for inspections and acceptance of the services, products and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting
Officer (PCO)), or a person with the authority to administer contracts (Administrative
Contracting Officer (ACO)) and make related determinations and findings on behalf of the
Government. The PCO for this contract is Stacey MacMillan (AIR-2.5.1.4). Contracting officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting’s Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this
CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract and safeguards the interests of the
United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper
Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.
Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
GPL: The GPL is responsible for assisting in administering of specific efforts under the
Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The
Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists
(CDRLs). As this information may affect future source selections throughout the
Department of Defense (DoD), as well as the continuation of this tasking, the annual
Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC).
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives and surveillance methods for the
Contractor, the COR and GPLs while Enclosures (1) and (3) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations and any actions related to the
Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): SAC
Enclosure (2): Quarterly Evaluation by CDRL
Enclosure (3): Annual Surveillance Summary
Enclosure (1)
Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (1): SAC
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of SB, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
Description Surveillance
Method/Measure Dates
Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of SB
Assessment
Other
Areas
Assessment
Provide Systems
Integration IAW
SOW paragraph
3.3.1
100% Inspection by
COR/ACOR and/or GPLs
Provide Production and Fabrication
IAW SOW
paragraph 3.3.2
Provide In-Service
Engineering IAW
SOW paragraph
3.3.3
Provide Training
IAW SOW
paragraph 3.3.4
100% Inspection by
COR/ACOR and/or GPLs
Provide Logistics
Engineering IAW
SOW paragraph
3.3.5
Provide Supply and
Material Control
IAW SOW
paragraph 3.3.6
Enclosure (1)
Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Provide Testing
IAW SOW
paragraph 3.3.7
100% Inspection by
COR/ACOR and/or GPLs
Provide Operating
C-UAS Systems
IAW SOW
paragraph 3.3.8
Provide Laboratory and Test Bed
Management IAW
SOW paragraph
3.3.9
Provide C-UAS
Engineering
Support IAW SOW paragraph 3.3.10
Provide Frequency
Spectrum
Authorization IAW
SOW paragraph
3.3.11
Provide Technical
Management IAW
SOW paragraph
3.3.12
Enclosure (2)
Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (2) QUARTERLY EVALUATION BY CDRL
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A001: Contracting Officer's
Management Report - Segregation of
Cost and Invoice Report
100% Inspection by COR/ACOR and/or GPLs.
A002: Engineering and Technical
Services Accomplishment Report
A003: Performance and Cost Report 100% Inspection by COR/ACOR
A004: Management Plan - Labor
Mix Report
A005: Trip/Travel Report 100% Inspection by COR/ACOR
A006: Technical Assistance
Performance Evaluation (TAPE)
Report
100% Inspection by COR/ACOR and/or GPLs.
A007: Phase-Out Transition Plan 100% Inspection by COR/ACOR
A008: Navair Operations Security
(OPSEC) Plan
A009: ISO 9001 Certificate of
Compliance
A010: Installation Control Drawings 100% Inspection by COR/ACOR
A011: Engineering Drawings -
System Block Diagram
A012: Drawings - Wiring and
Cabling Drawings
A013: Manuals - Technical Manual, Maintenance Manual, Operator
Manual, Installation
100% Inspection by COR/ACOR and/or GPLs.
A014: Software User Manual (SUM) 100% Inspection by COR/ACOR
Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A015: Standard Practice for Military
Packaging
A016: Scientific and Technical
Reports - Technical Report
A017: Technical Data Report -
System Performance Report **
Availability/Reliability
100% Inspection by COR/ACOR and/or GPLs.
A018: Test/Inspection Report 100% Inspection by COR/ACOR
A019: Critical Defect Investigation
Report - Defect Report
A020: Safety Assessment Report
(SAR) - System Safety Report
A021: Technical Report -
Study/Services - Engineering
Analysis
100% Inspection by COR/ACOR and/or GPLs.
A022: Failure Summary and
Analysis Report - Failure Analysis
A023: Training Program Structure
Document - Training Program
Structure Development Report
100% Inspection by COR/ACOR and/or GPLs.
A024: Reliability Centered
Maintenance (RCM) Process
A025: Reliability Centered
Maintenance (RCM) Procedure
Validation Report
100% Inspection by COR/ACOR and/or GPLs.
A026: Report of Shipping (Item) and
Packaging Discrepancy - Material
Receipt Discrepancy Report
100% Inspection by COR/ACOR and/or GPLs.
A027: Status Report - Order Status
Report, Contractor Deliverable
Schedule and Status Report
Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A028: Repair Procedure 100% Inspection by COR/ACOR
A029: System Safety Program Plan
(SSPP)
A030: Training Materials - Course
Training Materials
A031: Student Guide - Training Aids 100% Inspection by COR/ACOR
A032: Test Plan 100% Inspection by COR/ACOR
A033: Test Plans/Test Procedure 100% Inspection by COR/ACOR
A034: Requirements Traceability
Verification Matrix (RTVM)
A035: Provisioning Parts List
(PPLs)
A036: Logistics Product Data -
Logistics Support Analysis Record
A037: Configuration Audit Plan 100% Inspection by COR/ACOR
A038: As Built Configuration List –
Common - As Built Configuration
List
100% Inspection by COR/ACOR and/or GPLs.
A039: Engineering Change Proposal 100% Inspection by COR/ACOR
A040: Reliability Centered
Maintenance (RCM) - Maintenance
Requirement Index (MRI)
100% Inspection by COR/ACOR and/or GPLs.
A041: Planned Maintenance System
(PMS) Maintenance Requirements
Cards (MRCs)
100% Inspection by COR/ACOR and/or GPLs.
A042: Contractor’s Standard
Operating Procedures
Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A043: Work Breakdown Structures for Defense Materiel Items
A044: Phased Support Plan 100% Inspection by COR/ACOR
A045: System/Subsystem
Specification (SSS) - Systems
Specifications, Requirements
Specifications, Interface
Specifications
A046: Quality Management System
(QMS) - Quality Management Plan
A047: Status Reports – Project
Status Reports
A048: Presentation Material - Briefs 100% Inspection by COR/ACOR
A049: Statement of Work (SOW) 100% Inspection by COR/ACOR
A050: Inventory/Utilization Data
Report
A051:Report of Receipts, Inventor, Adjustments, and Shipments of
Government Property – Gain by
Inventory and Loss by Inventory
A052: Program Management Plan 100% Inspection by COR/ACOR
A053: Base Electronic System
Engineering Plan
A054: Failure Modes, Effects, and
Criticality Analysis
A055: Technical Report –
Study/Services
A056: system Integration Lab (SIL)
Development and Management Plan
Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
A057: Site Preparation Requirements and Installation Plan
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (3)
Source Selection Information 11 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (3): ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in
Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results
Quality of Product or Service Review of Quarterly Ratings
Schedule Review of Quarterly Ratings
Cost Control Review Quarterly of Ratings Business Relations Review of Quarterly Ratings Management Review of Quarterly Ratings Utilization of SB Review of Quarterly Ratings
Other Areas Review of Quarterly Ratings
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.
Source Selection Information 12 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is If the Contractor is experiencing cost growth or under-run, discuss the causes and Contractor-proposed solutions. For contracts where task or contract sizing is based upon Contractor-provided person-hour estimates, assess the relationship of these estimates to ultimate cost. Also, assess the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort. In addition, assess the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.
Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB
(including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes
ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran
Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs) to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Source Selection Information 13 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
File details come from the government source that posted it. Updated .