CDRL A005 RCM Analysis.pdf

PDF 228 KB Posted

Attached to
RCM SUPPORT
Solicitation number
N00421-19-REPREQ-67000CV-0028
Issued by

About this file

This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines reliability-centered maintenance (RCM) analysis deliverables required under the contract, including an RCM Analysis data file. Key deliverables are to be submitted through a web-based RCM system or via email in an IRCMS data file format. The Navy Naval Air Systems Command is listed as the requiring organization. Delivery dates and formats are specified, with the government allowing 45 days for review and 10 additional days for contractor responses.

The related federal contract opportunity solicitation requests RCM support services for new and in-service aircraft, engines, systems and equipment within the Navy. Services include RCM analyses, participation in working groups, and financial and administrative support. The solicitation is issued by the Navy Naval Air Warfare Center for the Department of the Navy.

View the file

Other files

File Type Posted
QUESTIONS-RESPONSES 2nd posting reposted .xlsx XLSX spreadsheet
Attachment L2 FMECA Format.xlsx XLSX spreadsheet
Attachment_P6_cost summary.xlsx XLSX spreadsheet
RCM B-1 table.xlsx XLSX spreadsheet
Attachment 2 - DD254 signed.pdf PDF
Attachment 6 Authorized subcontractors.docx DOCX document
CDRL A008 Training Materiall.pdf PDF
Attachment P7 Fully Burdened Labor Rates.xlsx XLSX spreadsheet
Attachment 3 Data Item Transmittal Form.doc DOC document
Attachment 5 Authorized key personnel.docx DOCX document
Instructions for Attachment P2 CPAQ.docx DOCX document
CDRL A003 OPSEC Plan.pdf PDF
CDRL A004 Meeting Minutes.pdf PDF
N0042120R0006.pdf PDF
Attachment P1 Past Performance Information Form.pdf PDF
CDRL A007 Transition Out Strategy_.pdf PDF
Attachment 1 Contract Surveillance Plan.docx DOCX document
CDRL A006 Technical Report_Study_Services.pdf PDF
CDRL A001 Contractors Progress and Cost Report.pdf PDF
Attachment L1 Sample Scenario HRI Matrix.xlsx XLSX spreadsheet
CDRL A002 Funds and Man-Hour Expenditure Report.pdf PDF
QUESTIONS-RESPONSES.xlsx XLSX spreadsheet
Attachment 4 OCI Vendor List.docx DOCX document
Attachment P2 CPAQ.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A005
title: RCM Analysis
sub: IRCMS Data File
auth: See BLK16
ref: See BLOCK 16
req_ofc: Sustainment Group
dd250: XX (BLK 16)
appcode: A (BLK 16)
dist: D
freq: ASGEN
asof: See BLK 16
firstsub: See BLK 16
subsub: See BLK 16
addressee1: TOCOR
draft1:
reg1: 1
repro1:
addressee2: TPOC
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4: See BLOCK 16
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 0
total_repro: 0
remarks: BLOCK 4: IAW Applicable Program RCM Plan. IAW the NAVAIR 00-25-403 or MIL-STD-3034(series), as determined by the TOCOR.

BLOCK 5: SOW paragraphs 3.3.1.1.2 - 3.3.1.1.7, 3.3.1.1.9, 3.3.1.2.2 - 3.3.1.2.11, 3.3.1.3.2 - 3.3.1.3.8, 3.3.1.5.2 - 3.3.1.5.8, and 3.3.1.6.2 - 3.3.1.6.9.

BLOCK 7: Contractor shall submit Integrated Reliability-Centered Maintenance System (IRCMS) Data File or submit via the web-based IRCMS, as determined by the TOCOR. Government acceptance required. Government acceptance provided by approval of analyses in IRCMS.

BLOCK 8: The Government shall have 45 calendar days for review and acceptance/rejection of each submission. Contractor incorporation of Government comments shall be due within 10 calendar days of receipt of comments.

BLOCKS 10, 11, 12, 13:, As generated and marked for review in web-based IRCMS or as generated and IRCMS data file sent.

BLOCK 14: Via web-based IRCMS, or via email of the IRCMS Data File.

group:
total_price:
prep_name:
line_item: CLINS 0001-0018, 1001-1018
exhibit: A
xtdp: Off
xtm: Off
othercat: SESS
system: Weapon/Activity
ctr_no: N00421-20-R-0006
contr: N/A
remarksb:
Page2:
Reset:
2019-10-09T13:38:37-0400
CAREY.KATRINA.MARIE.1537845348
prep_date: 10/09/2019
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .