Attach_P4-_Cost_Summary_Spreadsheet.xls

XLS spreadsheet 69 KB Posted

Attached to
Command Strategic Leadership Support Services
Solicitation number
N00421-19-R-0013
Issued by

About this file

Attachment P4- Cost Summary Spreadsheet

View the file

Other files

File Type Posted
Attach_3-_DD254_(Bidding_Purposes).pdf PDF
CSLS_RFP_20_dec_2018.docx DOCX document
Attach_2_-_OCI_List.docx DOCX document
Attach_5_-_Data_Item_Form.docx DOCX document
Attach_P3-_PPQ.doc DOC document
Attach_1-_Surveillance_Activity_Checklist.doc DOC document
P2-_Contractor_Performance_Assessment_Questionnaire_.pdf PDF
Attach_P1_-_Workforce_Quals_Spreadsheet.xls XLS spreadsheet
Exhibit_A_CDRLs.pdf PDF
Attach_6-_Labor_Qualifications.docx DOCX document
Attach_P5-_Annualized_Labor.xls XLS spreadsheet
Attachment_7-_GFP_PDF.pdf PDF
Attach_4_-_COR_Appointment_Letter.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9). If they are a prospective hire, please put "Prospective Hire." If they are a Contingent Hire, please identify a name and put "Contingent Hire." If necessary, insert additional rows--but ensure integrity of formulas.
3In Column B (starting at row 9) for each individual Contractor employee proposed, the offeror shall enter the corresponding Position Number as identified in Attachment 9.
4Enter the Government Labor Categories in Column C (starting at row 9). Offerors shall type the Government Labor Category name exactly as it is found in the RFP.
5Enter all prime labor categories in Column D (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column D, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
6Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
7The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
8All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
9All dollar figures shall be carried out no further than two decimal places.
10In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
11In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
12Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert rows separately and apply accordingly. Please ensure integrity of formulas.
13For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
14Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
15The prime should insert the subcontractor handling charge, if any.
16The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
17The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
18Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
19Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
20On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
21When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A13, and A20.
2Enter all subcontractor employee names in Column A (starting at row 9). If they are a prospective, please put "Prospective Hire." If they are a Contingent Hire, please identify a name and put "Contingent Hire." If necessary, insert additional rows--but ensure integrity of formulas.
3In Column B (starting at row 9) for each individual Contractor employee proposed, the offeror shall enter the corresponding Position Number as identified in Attachment 9.
4Enter the Government Labor Categories in Column C (starting at row 9). Offerors shall type the Government Labor Category name exactly as it is found in the RFP.
5Enter all subcontractor labor categories in Column D (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column D, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
6Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
7The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
8All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
9All dollar figures shall be carried out no further than two decimal places.
10In column E, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
11In column F, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
12Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert rows separately and apply accordingly. Please ensure integrity of formulas.
13For subcontractor cost summary sheets, delete Rows 22-48.
14When submitting this file, the instructions may be deleted.

&RN00421-19-R-0013

Attachment P4

IDIQ Cost Spreadsheet

COST SUMMARY SPREADSHEET
Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5Total for All Periods
Cost ElementsPosition #Government Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 10000000
Employee Name 20000000
Etc.0000000
Total Direct Labor Cost0000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost000000
COM
Total Prime Contractor Labor Cost000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0
Total Labor Cost (Prime and Subcontractor Labor)
Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)
Total Labor Cost Plus Fixed Fee (CPFF)0
Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs
Total CPFF all CLINs (Labor and ODCs)0
Grand Total of CPFF all CLINs
Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$00%
Maximum Pass Through Allowed by FAR10%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$00%
Maximum Fixed Fee Allowed by FAR10%

&CPage &P&R&F &LKTR: (name)&CSource Selection Information - See: FAR 2.101 and 3.104&RRFP:

IDIQ Summary

CLIN Summary Sheet
CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
X001
X002
X003
X004
Total

File details come from the government source that posted it.