FJS_DRAFT_PWS_V3.0_07Mar2019_FBO.docx
DOCX document 376 KB Posted
- Attached to
- Industry Day Notification for SOLICITATION N00421-19-R-0011, FLEET FIGHTER JET SERVICES Federal contract opportunity
- Solicitation number
- N00421-19-R-0011
About this file
This document announces the Naval Air Systems Command's intent to procure Fleet Fighter Jet Services through a multiple award indefinite-delivery/indefinite-quantity contract with an estimated period of performance of up to ten years. The services include providing contractor-owned and operated aircraft to the Department of the Navy for a variety of airborne threat simulation capabilities to train shipboard and aircraft squadron personnel. The anticipated North American Industry Classification System code is 488190 and Product Service Code is V121. Interested businesses shall submit capability statements by November 27, 2018 demonstrating experience providing similar services and the ability to meet requirements through proposed aircraft, basing, maintenance, and personnel. The draft request for proposal is expected in the third quarter of fiscal year 2019.
Fleet Jet Fighter Jet (Draft) PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0042119R0011_Industry_Day_Presentation_Final.pdf | ||
| FJS_Draft_PWS_QAs.pdf | ||
| Industry_Day_Attendees.pdf | ||
| N0042119R0011__Airworthiness_Brief.pdf | ||
| FJS_DRAFT_PWS_V3.0_07Mar2019_FBO.pdf | ||
| FJS_RFI_Attachment_(2)_-_Industry_Day_Questions.pdf | ||
| FJS_RFI_Attachment_(2)_-_Industry_Day_Questions_Revised.docx | DOCX document | |
| FJS_Sources_Sought_Draft_Req.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLEET FIGHTER JET SERVICES Draft PBWS v3.02.1 06Feb(FBO Posting)07March2019
CONTRACTED AIR SERVICES (CAS)
FLEET FIGHTER JET SERVICES
PERFORMANCE BASED WORK STATEMENT (PBWS)
DRAFT v. 3.02.1(FBO Posting) 07 February07 March 2019
Distribution Statement A: Approved for Public Release Distribution Unlimited
1.0 SCOPE
1.1 Naval Air Systems Command (NAVAIR) Program Manager Air (PMA) 226 Specialized and Proven Aircraft Program Office, Contracted Air Services (CAS) Integrated Product Team (IPT) has a requirement for Fighter Jet Services to provide contractor owned and contractor operated (COCO) aircraft to the Department of the Navy (DoN) for Fleet Training and Exercise Support for a wide variety of airborne threat simulation capabilities to train aircraft squadron aircrew and shipboard system operators on how to counter potential enemy advanced airborne threats, tactics, Electronic Warfare (EW), and Electronic Attack (EA) operations; and. Acquisition Program Testing and Evaluation (T&E) Support. The Contractor will provide support in a variety of venues, from basic “schoolhouse” Air Intercept Control (AIC) training to large multi-national exercises or small, single unit training exercises. Exercises may include target tow. Locations include multiple continental United States (CONUS) sites and foreign or remote operating bases outside continental United States (OCONUS). Aircraft will operate from designated or home bases on the East Coast, West Coast, Hawaii, Japan and from any operating site world-wide during periods of support and/or deployment. Other customers for CAS under this contract may include other Department of Defense (DoD) agencies and services, non-DoD Government agencies, and Foreign Military Sales (FMS) customers. Comment by Michael Coon: Should we add “US” before Government agencies or is it non-US Government agencies too. I assume US only. Comment by Kelly, Sherry L CIV CP 6.1.3: No. Leave open.
1.2 For clarity, all references to the Federal Aviation Regulation in this Performance Based Work Statement (PBWS) will be by reference to Title 14, Code of Federal Regulations (CFR) and abbreviated with the acronym “14 CFR”. All references to the Federal Acquisition Regulation will be abbreviated with the acronym “FAR”. When the requirements of this PBWS exceed the minimum requirements of 14 CFR, this PBWS takes precedence. Definitions contained in 14 CFR Part 1, in which are derived from the 14 CFR and Defense Contract Management Agency (DCMA) Instruction (INST) 8210.1C Change 1, apply to all situations and conditions relating to flight operations, aircraft maintenance, and flight crew certifications and qualifications.
2.0 APPLICABLE DOCUMENTS
The Contractor shall utilize and adhere to the following documents, and updates or revisions to them, in satisfying the performance requirements of this PBWS.
(a) CFR Title 14, Aeronautics and Space (14 CFR)
(b) Federal Acquisition Regulations (FAR)
(c) Defense Contract Management Agency (DCMA) INST 8210.1C Change 1, April 5, 2017, Contractor’s Flight and Ground Operations and Naval Air Systems Command (NAVAIR) Instruction (NAVAIRINST) 3710.1G Change 1
(d) Federal Aviation Administration (FAA) Advisory Circular (AC) 91-91 Maintaining Public Aircraft
(e) NAVAIR Instruction (NAVAIRINST) 13034.1F – NAVAIR Airworthiness and Cybersafe Process Manual
(f) DoD 4140.25-M, Volume 2, "DoD Management of Bulk Petroleum Products, Natural Gas, and Coal, Chapter 16 Government Fuel Card Program Management Office DoD Fleet Card, Air Card and Sea Card
(g) United States Code (USC) Title 49 Part 830 Notification and Reporting of Aircraft Accidents or Incidents and Overdue Aircraft, and Preservation of Aircraft Wreckage, Mail, Cargo and Records
(h) 32 CFR 766 dtd 1970 Use of Department of the Navy Aviation Facilities by Civil Aircraft
(i) Air Force Instruction (AFI) 10-1001 Civil Aircraft Landing Permits
(j) AFI 10-1002 Agreement for Civil Aircraft Use of Air Force Airfields
(k) FAA AC 00-1.1B Public Aircraft Operations (PAO)
(l) DD Form 1149C RequisisitonRequisition and Invoice/Shipping Document Jan 2016
(m) DoD Instruction 4715.4 Environmental Compliance at Installations Outside the United States
(n) DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM)
(o) 48 CFR 252.204–701(a) Safeguarding Covered Defense Information and Cyber Incident Reporting
(p) DoD Manual (DoDM) 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18)
(q) DoD Instruction (DoDI) 5230.24 (Distribution Statements on Technical Documents)
(r) Homeland Security Presidential Directive-12 (HSPD-12) August 27, 2004
(s) Secretary of the Navy (SECNAV) M-5510.36 October 6, 2006
(t) National Security Decision Directive (NSDD) 298 OPSEC Directive
3.0 GENERAL REQUIREMENTS
3.1 Aircraft Performance Requirements
3.1.1 Airframes: Type III and Type IV aircraft must be distinctly different Type/Model airframes.
3.1.2 Substitution of aircraft: With advanced Scheduling Officer (SO) approval, Type IV aircraft may be substituted for Type III missions; however, contractor payment shall be at the Type III rate.
3.1.3 Regardless of other stores configuration, aircraft must be equipped with either Tactical Combat Training System (TCTS), Large Area Tracking Range (LATR) or equivalent pods when operating on controlled ranges.
3.1.4 Aircraft must be capable of conducting tactical maneuvering through a maximum of 180 degrees of turn within the visual arena with blue force aircraft. This maneuver may be offense or defensive in nature.
3.2 Type III Aircraft: The Contractor shall provide Type III aircraft that meet the following performance criteria:
Matrix 1
TYPE III – Performance Requirements
| Speed and Altitude: | ||
| Accellerate to and maintain Mach 0.90M (objective) or 0.80M (threshold) at optimum altitude level with AST-9, TCTS or LATR pod and Captive Air Training Missle (CATM) and in a configuration that meets the "Minimum Take-off to landing duration time" requirement below. | Comment by Michael Coon: If first use of acronyms, please spell out first time. | Comment by Kelly, Sherry L CIV CP 6.1.3: TCTS & LATR are spelled out in 3.1.3 above. |
| Ceiling: | ||
| 35,000 feet Mean Sea Level (MSL) | Comment by Michael Coon: Spell out. | Comment by Kelly, Sherry L CIV CP 6.1.3: Done |
| Turn: |
| 6.0 G 180 degree turn at corner velocity below 15,000 feet MSL |
| Range: | ||
| 1,200 NM OCONUS with Instrument Flight Rule (IFR) fuel reserves at zero wind un-refueled in ferry configuration. 900 NM CONUS with IFR fuel reserves at zero wind un-refueled in ferry configuration. | Comment by Michael Coon: Spell out. | Comment by Kelly, Sherry L CIV CP 6.1.3: Done. |
| Minimum Take-off to landing duration time: |
| Threshold: 2.0 hours at optimum loiter with AST-9, TCTS or LATR and CATM. Objective: 3.0 hours at optimum loiter with AST-9, TCTS or LATR pod andpod and CATM. Where available, external tanks may be used to meet the requirement. |
| Configuration and Special Equipment: |
| 1. Every Type III mission-capable aircraft shall be able to perform the basic and external stores missions. The aircraft shall have a minimum of 2 hardpoint stations configured with interfaces for the external stores identified in paragraph 3.6.1.2. |
2. Every Type III aircraft shall be equipped with:
Threshold:
a. Operational ejection seats with FAA accepted training and maintenance program.
b. Permanently installed Techncial Standard Order (TSO)-C147-compliant Traffic Advisory System (TAS) or Traffic Collision Avoidance System (TCAS). Comment by Michael Coon: Acronym? Comment by Kelly, Sherry L CIV CP 6.1.3: Done
c. Global Positioning Systemt (GPS) based navigation capability
d. At least three (3) Very High Frequency (VHF)/ Ultra High Frequency (UHF) radios. Aircrew must be able to monitor 1 VHF and 2 UHF frequencies simultaneously.
e. Air-to-Air Tactical Air Navigation (TACAN) Objective:
f. Link-16/RedNet equivalent system, tied into TCTS Inc II/LVC, (GFP)
g. Infra-red (IR) detection capability.
Infra-redIR search and track (IRST) system and/or IR CATM with helmet and/or radar cuing.
h. Radar – Airborne radar capable of Track or Track While Scan modes. Minimum detection requirement shall be a 5 meter5-meter square target at 30 NM with 90% detection probability. 50% of aircraft on each coast shall be radar equipped.
3. Every Type III aircraft shall be capable of being equipedequipped with:
a. At least one LAU7, provided as government furnished property (GFP).
b. All EW external stores defined in paragraph 3.6.1.2 (GFP).
c. RM-30 Tow Reel or equivalent capable, RADALT for tow mission (GFP).
| Additional Performance Criteria: | ||||
| a) The Type III aircraft must be able to routinely execute the following flight profile: Launch from operating base with pod and CATM, fly 100 Nautical Mile (NM)-mile transit to Operations Area (OPAREA), loiter for 15 minutes, provide a 3-minute ingress presentation at max power at 22,000 MSL, loiter again for 15 minutes, provide a 3-minute off-target presentation at maximum power at 22,000 MSL, and 100 NMmiles Rreturn to Bbase (RTB) with IFR fuel reserves. | Comment by Michael Coon: This is miles and not NM, correct? | Comment by Kelly, Sherry L CIV CP 6.1.3: Changed to NM | Comment by Silverstone, David S CIV USN (US): First use? Spell out | Comment by Kelly, Sherry L CIV CP 6.1.3: Agree. |
3.3 The Contractor shall provide aircraft for a simultaneous presentation as identified in the matrix below.
Matrix 2
| Coast | ||
| Minimum Number of Aircraft Required for Simultaneous Presentation | ||
| Simultaneous Presentation of Tow Reel | Comment by Michael Coon: 0 and 1 aren’t really simultaneous. | Comment by Kelly, Sherry L CIV CP 6.1.3: Confirmed that 1 is valid. |
| East |
| 5 |
| 0N/A |
| West |
| 5 |
| 0N/A |
| Hawaii (MIDPAC) |
| 2 |
| 1 |
| Japan (WESTPAC) |
| 2 |
| 1 |
3.4 Aircraft Performance Requirements – Type IV Aircraft: The contractor shall provide Type IV aircraft that meet the Government’s minimum performance criteria:
Matrix 3
TYPE IV – Performance Requirements
| Speed and Altitude: |
| Threshold: Mach 1.1 at optimum altitude with AST-9, TCTS or LATR and CATM and in a configuration that meets the "Minimum Take-off to landing duration time" requirement below. |
Objective: Mach 1.5 at optimum altitude with AST-9, TCTS or LATR and CATM and in a configuration that meets the "Minimum Take-off to landing duration time" requirement below.
| Ceiling: |
| FL440 with pod and CATM. |
| Turn: |
| 6.0 G 180 degree turn at corner velocity below 15,000 feet MSL with pod and CATM. |
| Range: |
| 900 NM with IFR fuel reserves, zero wind un-refueled in ferry configuration. |
| Minimum Take-off to landing duration time: |
| Threshold: 2.0 hours at optimum loiter with AST-9, TCTS or LATR and CATM. Objective: 3.0 hours at optimum loiter with AST-9, TCTS or LATR and CATM. Where available, external tanks may be used to meet the requirement. |
| Configuration and Special Equipment: |
| 1. All Type IV mission-capable aircraft shall be able to perform the basic and external stores missions. The aircraft shall have at least two (2) hardpoint stations configured with interfaces for the external stores identified in paragraph 3.6.1.2. |
2. Every Type IV aircraft shall be equipped with:
Threshold:
a. Operational ejection seats with FAA accepted training and maintenance program.
b. Permanently installed TSO-C147-compliant Traffic Advisory System (TAS) or Traffic Collision Avoidance System (TCAS).
c. GPS based navigation capability
d. At least three (3) Very High Frequency (VHF)/ Ultra High Frequency (UHF) radios. Aircrew must be able to monitor 1 VHF and 2 UHF frequencies simultaneously.
e. Air-to-Air Tactical Air Navigation (TACAN).
f. Link-16/RedNet equivalent system, tie into TCTS Inc II/LVC (GFP).
Objective:
g. Radar – Airborne radar capable of Track or Track While Scan modes. Minimum detection requirement for radar is a 5-meter square target at 50 NM with 90% detection probability.
3. Every Type IV aircraft shall be capable of being equipeedequipped with:
a. At least one LAU7 (GFP)
b. All EW external stores identified in paragraph 3.6.1.2 (GFP).
| Additional Performance Criteria: | ||
| a) The Type IV aircraft must be able to routinely execute the following flight profile: Launch from operating base with an AST-9 and TCTS or LATR pod, fly 100-mile transit to OPAREA, perform Mach 1.1 run for 75 miles at 30,000 ft. MSL, transit back to cap and repeat, 100 miles RTB with IFR fuel reserves. | Comment by Silverstone, David S CIV USN (US): First use? Spell out | Comment by Kelly, Sherry L CIV CP 6.1.3: Have spelled out in Matrix 1 (first use) |
3.5 The Contractor shall provide aircraft for a simultaneous presentations as identified in the matrix below.
Matrix 4
| Coast |
| Minimum Number of Aircraft Required for Simultaneous Presentation |
| East |
| 3 |
| West |
| 2 |
3.6 Specific Requirements
3.6.1 Type III and Type IV Aircraft (CLINs 0X00X1 and 0X00X2)
3.6.1.1 Communication and Navigation Capability. The Contractor shall ensure all aircraft are equipped with the applicable communication and navigation capability to operate in the InternNational Air Space, or foreign nation airspace requirements as applicable. Within the context that these aircraft may deploy worldwide, the Contractor shall comply with other FAA, International Civil Aviation Organization (ICAO) or foreign nation equipment pre-requisites, and shall be solely responsible to provide such equipment.
3.6.1.2 The aircraft must be capable of carrying and employing: Aa combination of any two (2) of the following external stores simultaneously: ALQ167, AST-6, AST-9, LATR, P5 Combat Training System (P5CTS), TCTS, or other current EA, Electronic Surveillance (ES), and tracking pods. The Government will provide C9492/ALQ Control Indicators and the United States Navy (USN) Universal Control Box (UCB) (standard and mini-UCB) for use with EA pods as appropriate. The Contractor’s aircraft must be configured to use either control box interchangeably. The Government will maintain all GFP EA pods and control boxes are Government provided mission equipment and will be maintained by the Government. The Government will provide interface control documents for all GFP PODS and equipment to be utilized in the training missions (includes pods and internal suite systems). Additional external stores types may be provided as GFP to support evolving requirements. See APPENDIX (2). Comment by Michael Coon: If first use, spell out here. Comment by Kelly, Sherry L CIV CP 6.1.3: Done Comment by Silverstone, David S CIV USN (US): Check against language in 4.5.14. Does not match up
3.6.1.3 For Type III only – either RM-30 or equivalent. The Contractor shall provide at least one (1) coaxial cable for video to at least one (1) pylon on each side of the aircraft. The aircraft must be Government certified to carry GFP provided RM-30 tow reels plus any equivalent type tow reel provided by the Contractor as Contractor Furnished Equipment (CFE). (CLIN 0X01 only)
3.6.1.4 Missions. The Contractor shall provide services to include, but not limited to, the following types of missions: (Presentations may be flown as singles, sections, and mixed divisions). Other missions within aircraft operating limitations may be tasked.
(1) Typical profiles will require extended flight and loitering as far as 250 miles off-shore, operating between 200 ft daylight hours and 1,000 ft at night and 35,000 ft Mean Sea Level (MSL).
(2) Mission Flights under positive control, with the pilot responding to vectors and instructions by NAVAIR controllers as designated by the Scheduling office.
(3) Mission Flights with indirect control or independent un-vectored flight executed in accordance with a pre-briefed scenario driven presentations.
(4) EW Pod Missions. Employ at least two external stores to present increasingly complex scenarios to ship weapons controllers, fighter squadron aircrews, and AIC trainees. EW Pod Missions, Electronic Surveillance (ES) & EA Pods, up and downloads, and flight times are included as part of the basic flight hour rate applies to CLINs 0X01 and 0X03.
(5) Simulated Close Air Support (Dry, no ordnance carried) to support Joint Terminal Attack Control Training. Comment by Silverstone, David S CIV USN (US): Is there an acronym for this? If so spell out and show acronym Comment by Kelly, Sherry L CIV CP 6.1.3: Deleted. N/A to this requirement.
3.7 Aircraft Certification, Maintenance Practices and Operating Procedures
Aircraft must be certified, maintained and operated In Accordance With (IAW) 14 CFR and its NAVAIR Interim Flight Clearance (IFC), including, but not limited with particular attention to, the following areas: Comment by Michael Coon: If first use, spell out here. Comment by Kelly, Sherry L CIV CP 6.1.3: Done
| FAA AC 91-91 – Maintaining Public Aircraft |
| Part 21 – Certification Procedures for Products and Parts |
| Part 43 – Maintenance, Preventive Maintenance, Rebuilding and Alteration |
| Part 91 – General Operating and Flight Rules |
3.7.1 FAA Airworthiness and Related Substantiation Data (Contract Data Requirements List (CDRL) A001) Comment by Silverstone, David S CIV USN (US): First use, spell out Comment by Kelly, Sherry L CIV CP 6.1.3: Agree.
Aircraft must possess a current FAA Airworthiness Certificate and be certified to fly in actual and forecasted icing conditions. Former military aircraft, regardless of source, must meet the original design standards for forecasted icing condition. The Contractor shall provide a copy of each of the airworthiness certificates for review within 15 days of contract award and as generated or requested (CDRL A001). The Contractor shall comply with all Airworthiness Directives (AD) and service bulletins for mission effectiveness..
3.7.1.1 FAA Standard Airworthiness Certificates
For aircraft with FAA Standard Certificates, the Contractor shall maintain the aircraft IAW 14 CFR. The Contractor shall secure FAA approval for each change to the configuration that is not defined in the aircraft’s Airworthiness Certificate before the change is used in support of this contract. For each such modification, the Contractor shall secure and provide the valid FAA-approved data within 15 days of contract award and as generated or requested (CDRL A001). For Type Certificated aircraft, if this data references FAA regulations as the standard, the Contractor shall provide Approved Data as defined in the FAA Order 8300.16 for any Major Alteration or Major repair. Major alterations to aircraft with Standard Airworthiness Certificates shall have been certified as airworthy and properly documented using FAA Form 337 signed in blocks six (6) (Conformity) and seven (7) (Return to Service) by persons authorized under 14 CFR § 43, and citing FAA Approval Data. Modifications relatinge to powered systems may be certified for captive carriage only by the FAA. Comment by Kelly, Sherry L CIV CP 6.1.3: Added per Sorin.
3.7.1.2 FAA Special Certificates
For aircraft with FAA Special Certificates, the Contractor shall provide the Program Letter (PL) submitted to the FAA for application of the airworthiness certificate used in support of this contract or latest PL associated with the current airworthiness certificate. Under this certificate, the aircraft must be maintained in accordance with the operating limitations issued as part of that certificate. For each subsequent aircraft modification deviating from the FAA issued certificate, the contractor shall secure and provide an updated FAA airworthiness certification, and associated operating limitations (CDRL A001), before the modification is used in support of this contract. Where the modification is a Major Change (as defined by 14 CFR), the Contractor shall provide the PL and secure the FAA's determination regarding the need for new or amended certificates. All major alterations incorporated before contract award and during contract execution shall have sufficient data to determine that the equipment or provisions for the equipment meet the applicable civil, Original Equipment Manufacturer (OEM), MIL-STD, or some other recognized engineering substantiation data, for the type of aircraft concerned. Unless directed otherwise by the Government, the Contractor shall remove any major alteration incorporated before contract award that was not certified as airworthy by an appropriately rated FAA certified mechanic, aircraft manufacturer or repair station. Comment by Kelly, Sherry L CIV CP 6.1.3: Added per Sorin.
3.7.1.3 NAVAIR Airworthiness Supporting Data
3.7.1.3.1 All aircraft under this contract require a NAVAIR issued IFC (NAVAIRINST 13034.1F). The Contractor shall provide airworthiness substantiation data IAW this PBWS, CDRL A001 and as required by NAVAIR.
3.7.1.3.2 For all aircraft operating under a NAVAIR IFC, Tthe Contractor shall notify the Contracting Officer’s Representative (COR) of any proposed changes to the aircraft configuration, FAA certificate status, or operating limitations and procedures so an assessment of the changes can be made and a modified Interim Flight Clearance (IFC) issued, if warranted. In addition, the Contractor shall provide airworthiness substantiation data IAW CDRL A001 for the proposed change. Comment by Michael Coon: Acronym used on page 6 first. Comment by Kelly, Sherry L CIV CP 6.1.3: Corrected.
4.0 OPERATIONAL REQUIREMENTS
4.1 Mission Planning
4.1.1 Under the Commander, Naval Air Systems Command (NAVAIRSYSCOM), PMA-226 is the overall CAS Program Manager. PMA-226 will designate Scheduling Officers (SO’s) to execute administrative tasks such as mission scheduling and coordination, and invoice certification. The Contractor Representative (CR) shall coordinate with the SO on all formal requests for Fighter Jet services to determine feasibility of support, implications of support on other scheduled or potentially scheduled mission and any other necessary details requiring coordination. Comment by Silverstone, David S CIV USN (US): Already spelled out Comment by Kelly, Sherry L CIV CP 6.1.3: Agree.
4.1.2 The Contractor shall support normal schedule for flight operations which is Monday through Friday, 0600 to 2000 local time. However, flight operations may be scheduled at any time, 24 hours a day/, seven days a week, subject to a minimum mission flight time.. The weekly schedule provided by the SO, will identify when operations are required outside of the normal operating schedule or that are of longer duration than 14 hours per day. The schedule is typically published on Wednesday of the week prior to the execution week. Once this weekly schedule is published, the Government will give the Contractor 24 hours advance notice for any changes to the tasking and issue and update to the weekly schedule. To meet emergent demands, the contractor may be asked to provide services with less than 24 hours notice during home base operations.
4.1.3 If an aircraft has deployed and is currently on a detachment (away from home base), the Government will provide at least 18 hours notice before redeploying to another site. During periods of intensive test operations or major exercises, flight operations may run in excess of 14 hours a day, seven days a week for up to four weeks. When detachments (greater than 7 days), high tempo operations or extended fly days are anticipated, the Government will notify the Contractor via email at least 14 business days in advance. Scheduled and planned maintenance requirements that may preclude aircraft availability should be coordinated as far in advance as possible with the SO. Pilot mission briefs are held prior to mission execution and will include detailed information for mission profile execution..
4.1.4 The Contractor shall coordinate ground and flight crew daily schedules as necessary to meet the operational taksingtasking of the SO. Notwithstanding other directives of this PBWS, flight operations may be scheduled at any time, 24 hours a day/seven days a week, subject to a minimum mission flight time. The Contractor shall provide a CR to contact, to cover scheduling 24 hours per day/seven days a week. Scheduled and planned maintenance requirements that will preclude availability of any aircraft should be coordinated as far in advance as possible so that supportable commitments can be adjusted. As soon as it is determined that missions cannot be met, the Contractor shall inform the Government if any aircraft are not able to meet assigned or future missions, via email or phone to the Contracting Officer’s Representative (COR). Comment by Silverstone, David S CIV USN (US): Already spelled out Comment by Kelly, Sherry L CIV CP 6.1.3: Agree.
4.2 Scheduling Officer (SO) Communications with Contractor
A. The designated SO for East Coast Task Orders (TOs) is the CAS office at Fleet Area Control Surveillance Facility (FACSFAC) Virginia Capes (VACAPES), VA. The SO will coordinate the Government’s Navy Fleet and FMS Fleet requirements and schedule all Fleet and FMS Fleet missions for the East Coast.
B. The designated SO for West Coast TOs is FACSFAC San Diego, CA. The SO will coordinate the Government’s Navy Fleet and FMS Fleet requirements and schedule all Fleet and FMS Fleet missions for the West Coast.
C. The designated SO for the Middle of Pacific (MIDPAC) or Western Pacific (WESTPAC) is the CAS office at FACSFAC Pearl Harbor, HI. The SO will coordinate the Government’s Navy Fleet and FMS Fleet requirements and schedule all Fleet and FMS Fleet missions for MIDPAC and WESTPAC.
D. The designated SO at Naval Air Warfare Center Aircraft Division (NAWCAD) 5.1.2 Patuxent River, Maryland, office will coordinate Special Project aircraft, all other contract flight requirements and schedule all other missions.
E. The SO and CR will communicate as often as required to develop the short range and long range schedule, but at a minimum, the CR will provide a weekly schedule to the SO reflecting events as flown, currently scheduled, flying hour execution and proposed aircraft maintenance schedule. This scheduling should include planned operations using Standard Mission support Personnel.
F. The Government reserves the right to cancel or not schedule flight services on any given day of detachment operations.
4.2.1 Authorization of Flight Operations
All flight operations must be authorized by the SO and communicated to the CR by the SO or their designated representative.
4.2.2 Released by the Government
When all flights for detachment operations have been completed, the SO or their designated representative, will notify the CR via email that the deployment is complete. Following this notification, the CR shall complete and implement arrangements to return the aircraft, personnel, and equipment to the home base.
4.3 Contract Coordination
4.3.1 Post-Award Conference
The Contractor shall host a Post-award Conference (PAC) with the Government no later than 30 days after contract award at the Contractor’s location. The PAC agenda must be established following contract award and is intended to orient both Government and Contractor personnedpersonnel with contract requirements, schedule, and performance expectations. The PAC shall be conducted IAW FAR Subpart 42.5.
4.3.2 Program Management Reviews
The Government will schedule and conduct Program Management Reviews (PMRs) on a semi-annual basis at NAVAIRSYSCOM PMA-226, Cherry Point, North Carolina, the Contractor’s facility, or other locations as directed by the COR. The Contractor shall attend all PMRs with appropriate personnel.
A. At each PMR, the Contractor shall make a presentation consisting of the following:
i. A. Overview of the work accomplished to date or since last review, the projected plan of action for completion of contract effort, and handout material documenting presentations.
ii. B. Identification and discussion of problems encountered, if any, and action taken to resolve the problems.
iii. C. Identification and discussion of problems anticipated and the Contractor’s plan of action for mitigation.
DB. The contractor shall also:
i. Address experiences working as a team with other CAS Contractors (when applicable) and the 1Government, identifying successes and areas needing improvements. Comment by Michael Coon: What is this 1 doing here? Comment by Kelly, Sherry L CIV CP 6.1.3: Deleted.
iiE. Record minutes for each review and list of action items.
4.3.3 Contractor Management Plan (CDRL A002)
The Contractor shall provide a Contractor Management Plan (MP) within 30 days of contract award that describes the Contractor’s organization, management procedures and modification schedules that are established for the initiation, monitoring, control and completion, test and verification, and reporting of contractual requirements to complete the tasks outlined in this PBWS and IAW CDRL A002.
4.4 Mission Coordination (Operational Reporting)
4.4.1 Scheduled Maintenance Requirements
The Contractor shall coordinate with the SO and COR no less than once per month to discuss requirements and identify potential aircraft scheduled maintenance. No special scheduling arrangements or considerations will be made to meet the Contractor’s maintenance requirements.
4.4.2 Mishap Response Plan and Accidents and Incident Reporting As required by DCMA INST 8210.1C Change 1, tThe Contractor shall report all aircraft accidents and incidents to include all air, ground mishaps and Occupational Safety and Health Administration (OSHA)/Safety violations, IAW its GFR approved Mishap Response Plan (MRP) IAW paragraph 4.5.5 (included in Management Plan (CDRL A002). , Ground Operations Procedures (GOP) and Flight Operations Procedures (FOP) (included in Airworthiness Data CDRL A001). The Contractor shall immediately contact the local base Commanding Officer or Command Duty Officer or the officer conducting the exercise, as applicable and the COR. Leaving a voicemail alone is not sufficient. PMA-226 incident reporting phone numbers will be provided at award. Accident/Damage reports, at a minimum must be marked FOR OFFICIAL USE ONLY (FOUO) or classified IAW the appropriate security classification guide. Comment by Silverstone, David S CIV USN (US): CDRL A002 is titled Management Plan, not Mishap Response Plan (MRP). It has to be called one or the other. If it needs to be a separate CDRL, then one should be created. Comment by Michael Coon: Agree with Dave. Comment by Silverstone, David S CIV USN (US): Is this CDRL A002? Why is this here? CDRL A002 is the Management Plan Comment by Kelly, Sherry L CIV CP 6.1.3: This was wording from HEEWJ. Recommend revising as shown since this section relates to reporting and actual plan is addressed in para. 4.5.6. Comment by Kelly, Sherry L CIV CP 6.1.3: MRP is part of Management Plan. See proposed edits. Comment by Kelly, Sherry L CIV CP 6.1.3: See edits.
4.4.3 Waiver Requests
Each aircraft used in the performance of this contract must be operated and maintained IAW 14 CFR and its NAVAIR IFC. If, in the performance of this contract, for any reason a contract requirement cannot be met, the Contractor shall notify the Procuring Contracting Officer (PCO) and the COR, and obtain approval from the Government Flight Representative (GFR), prior to conducting operations. The waiver request must cite the specific requirement that cannot be adhered to IAW DCMA INST 8210.1C Change 1.
4.5 Fixed Rate Work Tasks
4.5.1 Fuel
4.5.1.1 This is a “dry” contract. The Government will provide access to fuel at United States Government (USG) bases and civil fields. The Contractor shall purchase fuel with Tthe Government will provided appropriate fuel (AIR) cards for each of the Contractor’s aircraft. All fuel purchased by the Contractor should be obtained from a military base whenever possible. Whenever “into plane” (Government rate) fuel needs to be obtained from a civilian airport, the Contractor shall record the circumstances and justification IAW the DoD 4140.25-M. Commercial non “into plane” fuel mustmay only be used by exception with SO or COR advance approval.
4.5.1.2 The Contractor shall not use any Government provided fuel for any flight other than those scheduled under this contract.
4.5.1.3 The Contractor shall track all fuel consumption and provide fuel receipts, flight logs, and Fuel Reports to the Government in accordance with (CDRL A003).
4.5.1.4 During all flight operations, the Contractor shall provide daily usage data via email to the COR and GFR.
| 4.5.2 | Fuel Card Training |
| The Contractor shall complete Aircraft Into-plane Reimbursement (AIR) fuel card training IAW DoN Consolidated Card Program Management Division (DoN CCPMD) at least 30 days before first flight. All users of the AIR cards (pilot’s/flight commander’s/aircraft commander’s/crew chiefs) must perform DoN role-based refresher training every 2 years. Common Access Cards (CAC) are required to register for training via the CCPMDDM website. For contractorsusers new to this site, the individualcontractor shall register itstheir CAC the first time theyto access the site. The CCPMD training system uses the email associated with the contractorsusers CAC when registering completion of training and to provideget a certificate. All Contractor fuel card users shall: | Comment by Michael Coon: CCPMD not CCPDM |
| Comment by Kelly, Sherry L CIV CP 6.1.3: Corrected. |
i. Register the CAC at: https://www.navsup.navy.mil/registration
ii. Register for and complete the Card User Certification Course via CCPMD home portal - https://my.navsup.navy.mil/webcenter/portal/ccpmd and select AIRir Card or go directly to AIRir Card training at https://my.navsup.navy.mil/webcenter/portal/ccpmd_ac/Training
iii. Complete the Online Certification
iv. Print the Certificate of completion and provide a copy to the COR within 5 working days, to be kept on file.
v. Contract users shall sign a Card User Statement of Understanding (SOU) after conducting training.
4.5.3 Aviation Safety and Mishap Prevention Program
The Contractor shall establish and maintain and Aviation Safety and Mishap Prevention Program (MRP) and ensure it is reviewed by all aircrew members on an annual basis IAW DCMA INST 8210.1C Change 1.
4.5.4 Aviation Safety Official
4.5.4.1 The Contractor shall designate an Aviation Safety Official with specific duties and responsibilities defined in accordance DCMA INST 8210.1C Change 1. Comment by Michael Coon: Acronym? Comment by Kelly, Sherry L CIV CP 6.1.3: No
4.5.5 4.5.4.2 Risk Management Program The Contractor shall establish and maintain an Operational Risk Management (ORM) Program, IAW DCMA INST 8210.1C Change 1 and the MRP (included in Management Plan CDRL A002). Per DCMA INST 8210.1C Change 1, the Contractor shall establish and execute written procedures for responding to an aviation incident or accident as part of the MRP. The Contractor shall deliver all Accident and Incident reports to PMA-226 per its MRP. In addition to safety and reporting requirements outlined in PBWS paragraphs 4.5.3, 4.5.4, 4.5.15 and 6.4.1, the MRP must establish policies, responsibilities, and actions to be initiated if any aircraft becomes overdue from its active Flight Plan. The Contractor shall conduct an exercise of the MRP on an annual basis. In addition to the requirements of DCMA INST 8210.1C Change 1, the Contractor shall also establish procedures which conform to USC Title 49 Chapter 8 Part 830 National Transportation Safety Board (NTSB).
Comment by Silverstone, David S CIV USN (US): Same comment. Perhaps reword “and the MRP included in the Management Plan (CDRL A002)” Comment by Kelly, Sherry L CIV CP 6.1.3: See edits. Comment by Silverstone, David S CIV USN (US): Do these need to be a CDRL? Comment by Kelly, Sherry L CIV CP 6.1.3: Revised to match HEEWJ. The MRP falls under CDRL A002 and the reports are part of the MRP. Comment by Kelly, Sherry L CIV CP 6.1.3:
4.5.5 Mishap Response Plan
The Contractor shall establish and execute a MRP to include written procedures for responding to an aviation incident or accident (included in Mangement Plan CDRL A002). The MRP shall establish policies, responsibilities, and actions to be initiated if any aircraft becomes overdue or involved in an incident or mishap. The Contractor shall re-evaluate exercise the MRP on an annual basis and make any required updates. As a minimum, this plan shall include the following:
A. Procedures that conform to United States Code (USC) Title 49 Part 830 National Transportation Safety Board (NTSB); Comment by Silverstone, David S CIV USN (US): Previously used Comment by Kelly, Sherry L CIV CP 6.1.3: Agree. Comment by Silverstone, David S CIV USN (US): Previously used Comment by Kelly, Sherry L CIV CP 6.1.3: Agree.
B. Immediate action checklist to ensure command, control, and coordination of the rescue or recovery effort;
C. A notification plan which includes a current roster of Contractor and Government personnel (including duty and non-duty phone numbers) to be notified in the event of an aircraft mishap; and D. Procedures for Contractor and subcontractor cooperation and participation in mishap investigations conducted by the Government. Procedures shall clearly define the differences between a Government legal investigation (used to satisfy claims) and a Government Safety investigation (used for mishap prevention). The procedures shall clearly state the contractual obligation of Contractor personnel to provide information and participate in interviews by the Government safety investigation immediately upon request. The Contractor shall have procedures that require, to the maximum extent possible, aircrew medical and toxicological testing immediately following a mishap. The results of medical and toxicological testing shall be provided to the Government safety investigation board immediately upon request. The toxicological samples shall be provided to the Government legal investigation board immediately upon request.
4.5.6 Contract / Task Order Status
The Contractor shall track flight minutes and all costs associated with each TO on a per CLIN level. The Contractor shall submit a Monthly Status Report in accordance with CDRL A004 during the Pperiod of Pperformance (PoP) of each Ttask Oorder (TO).
4.5.7 Transientt Military Aircraft
When in support of scheduled missions, aircraft provided under this contract are considered transient military aircraft and not subject to landing fees at DoD controlled airfields.
4.5.8 Civil Aircraft Landing Permits
The Contractor shall submit DD Form 2400 - Civil Aircraft Certificate of Insurance, DD Form 2401 - Civil Aircraft Landing Permit and DD Form 2402 - Civil Aircraft Hold Harmless Agreement IAW 32 CFR766 to the COR. These agreements must be kept current during the entire ordering period of the contract and through the final period of performancePoP for all task ordersTO’s. Landing permits will be submitted by PMA-226 for landing at USN, United States Marine Corps (USMC) and United States Air Force (USAF) airfield facilities worldwide, i.e. all CONUS/OCONUS, without restriction, to include the purchase of USG fuel, and support services on a not-to-interfere basis. USAF landing permits will comply with AFI 10-1001 Civil Aircraft Landing Permits and AFI 10-1002 Agreement for Civil Aircraft Use of Air Force Airfields.
4.5.9 Maintenance Program
4.5.910.1 Aircraft used in the performance of this contract shall must be maintained in accordance with 14 CFR, their NAVAIR IFC and this PBWS.
4.5.910.2 The Contractor shall manage remaining fatigue life to allow the aircraft to be safely operated throughout the ordering period of the contract and provide fatigue life status as part of configuration management in the Maintenance Program (MP) (CDRL A001). Comment by Silverstone, David S CIV USN (US): Previously used Comment by Kelly, Sherry L CIV CP 6.1.3: Agree.
4.5.910.3 The Contractor shall provide a list of all categories of parts with Original Equipment Manufacturer (OEM) defined life limits, and define in the MP, the path for replacing those parts on/before the required dates (CDRL A001). Comment by Michael Coon: “list of all” Comment by Kelly, Sherry L CIV CP 6.1.3: Corrected.
4.5.102 Aeronautical Regulations Comment by Michael Coon: Numbering is off from here on out with 4.5.xx The Contractor shall abide bycomply with all FAA PAO procedures IAW FAA AC 00-1.1B and local military flying directives (including foreign Government requirements). The Contractor shall only utilize aircraft that possess current FAA Airworthiness Certifications and will require NAVAIR IFC prior to conducting PAO. The Contractor shall operate and maintain the aircraft IAW 14 CFR, and its NAVAIR IFC unless a waiver is granted in accordance with this PBWS, and CDRL A001).
4.5.11 General Deployments
When directed by the SO, the Contractor shall deploy its aircraft, personnel, and required support equipment to perform at any airfield capable of supporting its aircraft. The Contractor shall plan, schedule, ship, and deploy its personnel and equipment, including all GFP, as applicable. At least 30 days prior to deployments, the SO will release a pre-deployment message to the Contractor to ensure coordination of requirements, services, and accommodations. Additional costs during deployed operations for travel, per diem for personnel, shipping of spare parts and equipment (if required), international fees, and taxes will only be allowable if approved in writing by the COR or SO. If aircraft or aircrew substitutions are accomplished at the Contractor's request during a scheduled deployment, transit to and from the deployment base to accomplish the substitution shall be entirely at Contractor expense.
4.5.12 Equipment Installer or Maintainer
The Contractor shall provide maintenance personnel to install, remove, and maintain the Contractor Furnished Property (CFP) and GFP. Government property for the performance of this contract will be limited to mission-specific GFP identified and transferred to the Contractor via DD Form 1149. Comment by Silverstone, David S CIV USN (US): Different from what is stated in 3.6.1.2 Comment by Kelly, Sherry L CIV CP 6.1.3: See edits to para 3.6.1.2
4.5.135 Performance Metrics
This performance-based requirement includes performance metrics which are contained in the Quality Assurance Surveillance Plan (QASP). The Contractor’s performance will be assessed in accordance with the QASP.
4.6 Personnel Requirements
The contractor shall ensure that all personnel performing Fighter Jet Services operations have appropriate training and any necessary qualifications IAW DCMA Instruction 8210-1C Change 1 to meet requirements and perform the missions outlined in this PBWS. All personnel shall comply with local laws, policies, and regulations while aboard any military installation. All personnel working in an operational capacity (e.g., aircrew) or on U.S. or Foreign Government military installations shall be readily identifiable as contract employees through appropriate attire and badges while performing services under this contract.
4.6.1 Contractor Representative
The Contractor shall designate a Contractor Representative (CR) who is able to provide scheduling support 24 hours a day, seven days a week, to include rapid response after duty hours. Scheduling may be accomplished via internet electronic mail account or phone (land-line or mobile). The CR shall have authority to schedule and assign Contractor aircraft and crews in response to Government requirements. The CR shall interface between the Government and the Contractor, and shall: Comment by Michael Coon: Used prior on page 7. Comment by Kelly, Sherry L CIV CP 6.1.3: Corrected
A. Maintain close liaison with SO in matters regarding Contractor’s aircraft and schedule.
B. Develop plans for each task order to assist the Government, when required, in determining the most effective and efficient operations of Contractor aircraft.
C. Provide coordination between the Contractor and Government scheduling office and higher authority to assist in determination of the most efficient and effective utilization of Contractor assets in supporting various missions.
D. Maintain close liaison with current and future supported units to ensure effective operational continuity, obtain detailed mission information and identify potential operational concerns.
E. Provide Contractor flight crews with comprehensive mission information and details of tasking.
F. Be familiar with applicable exercise scheduling or operational procedures as determined by the supported units and in turn, ensure that Contractor flight crews are familiar with these exercises and other required regional operational instructions.
G. During operations, the CR or senior Contractor individual present shall:
(1) Ensure attendance of pilots at required procedure and mission briefings.
(2) Ensure Contractor aircraft launch in sufficient time to arrive at designated stations on time.
(3) Coordinate all maintenance, servicing, logistics, crew transportation, Contractor personnel briefings, security clearances/vehicle registrations, and equipment/facility custodial functions in support of Contractor operations.
(4) Provide daily “as flown” reports to facilitate flying hour management to the SO and a designated PMA-226 representative (CDRL A004). The report will contain a synopsis of flight hours and sorties completed, and billable flying minutes (CLINs 000X, 000X, and 000X) and daily fuel usage data charges.
(5) At the conclusion of an operation, provide an all-inclusive summary to include the elements in (4) above and any recommendations for improvement or lessons learned.
H. Provide comprehensive post mission debriefs and other feedback as required or requested to the SO, supported units, or other Government agencies to assist in future effective and efficient utilization of Contractor assets (CDRL A002).
4.6.2 Additional Aircrew Requirements
Aircrew includes Pilot in Command (PIC), Second in Command (SIC) and Flight Engineer/Fighter Jet Panel Operator and other mission essential personnel aboard the aircraft during flight. Contractor aircrew shall operate the aircraft under the Contract in accordance with the aircraft’s FAA Airworthiness Certificate and 14 CFR requirements. In addition, regardless of aircraft type, the aircrew shall comply with the following requirements:
4.6.2.1 Scheduling
Contractors shall utilize a closely monitored system that evaluates operational risks, experience levels of crew members, and ensures the proper pairing of aircrews on all flights. The scheduling system must have an established flight duty time program for aircrews, carefully managed so as to ensure proper crew rest. Aircrew flight time limitations and rest requirements shall comply with the provisions of 14 CFR 135.267.
4.6.2.2 Pilot in Command
As part of the preflight check process, the PIC shall have the final authority to determine whether an aircraft is airworthy, and to launch or terminate a mission.
4.6.2.2.1 Pilot Certificate
Pilots shall hold at least a commercial, instrument rated pilot certificate with appropriate category and class ratings and type rating for the aircraft. The PIC shall meet the recent experience requirements of 14 CFR 61.57.
4.6.2.2.2 Pilot Requirements
All pilots performing under this contract shall:
A. Have and maintain an FAA Experimental Authorization, FAA Letter of Authorization, or type rating in the proposed aircraft.
B. Have and maintain an FAA Instrument Rating and conduct FAA annual instrument proficiency checks in accordance with paragraph 4.6.2.2.4.
C. Have and maintain an FAA Commercial Pilot License with a Second Class Medical certificate.
D. Have military tactical air flying experience of at least (1200 hours of Tactical Air (TACAIR)).
E. Have a minimum of 1200 hours total pilot time and have logged 100 hours PIC time in the past 12 months.
F. Have at least 10 takeoffs and 10 landings, and 20 hours in the type and model aircraft being operated.
4.6.2.2.3 Flight Reviews
Prior to flying as PIC, the pilot shall have completed a flight review in the type of aircraft being flown within the preceding 12 months. The flight review shall be conducted in accordance with 14 CFR 61.56.
4.6.2.2.4 Instrument Proficiency Check
Prior to flying, the pilot shall have completed an instrument proficiency check in the type of aircraft being flown within the preceding 12 months. The instrument proficiency check shall be conducted in accordance with 14 CFR 61.57(d). If a pilot is qualified in more than one type of aircraft under the Contract, the pilot shall complete an instrument proficiency check in each type aircraft on an alternating 12-month basis. In no case shall a pilot serve in an aircraft type that he or she has not conducted an instrument proficiency check within the preceding 24 months. A flight simulator may be used for the instrument check provided the flight simulator represents the type of aircraft used under the contract and the check is conducted by a training center certified by the FAA.
4.6.2.3 Records
Flight Crew Personnel records shall be maintained and reflect such data as experience, qualifications, and applicable medical status.
4.6.2.4 Aircrew Proficiency
The Contractor shall have a process where they assess aircrew to ensure that they are able to demonstrate aircraft proficiency in accordance with Contractor established standards. Additionally, pilots shall hold a commercial instrument rated pilots certificate and meet the requirements of 14 CFR 61.55. Personnel assigned to operate EW equipment shall be proficient in friendly and enemy (EA) and ES tactics and techniques.
4.6.2.5 Aircrew/Maintenance Communications
The Contractor shall maintain openEffective lines of communication that permit feedback from aircrew and maintenance personnel to operations and maintenance managers shall be maintained. Crews must be able to determine an aircraft's maintenance condition prior to flight and use standardized methods to accurately report aircraft deficiencies to the maintenance activity.
4.6.2.6 Aircrew Training
All Contractor personnel shall have the requisite qualifications and training for the position to which they are assigned. Qualifications and training are the responsibility of the contractor. Personnel qualification and training records shall be available for review by USG personnel.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .