Attachment_P-5_Fully_Burdened_Labor_Rates.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- N00421-18-R-0040
About this file
This document contains a template and instructions for prime contractors to submit proposed fully burdened labor rates for a request for proposals from the Department of the Navy Naval Air Systems Command. The template requires contractors to provide labor categories, individual designators, and proposed fully burdened hourly and overtime rates for each year of a potential five-year contract. Rate information must be provided for onsite and offsite labor for several locations, including Naval Air Station Patuxent River, Naval Air Weapons Station China Lake, and Commander Operational Test and Evaluation Force. Overtime rates may be utilized if required by the agency but are not mandatory for proposals.
Attachment P-5 Fully Burdened Labor Rates
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to Prime Contractors for Completing Attachment P5
RFP# N0042118R0040
FULLY BURDENED LABOR RATES TAB
| COLUMN | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| A | Offeror Name | Enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies. |
| B | Government Labor Category | Enter the Proposed Labor Category. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). Onsite or Offsite shall be identified. Separate Entries required if an Individual Designator performs both Onsite and Offsite |
| C | Individual Designator | For each individual Contractor employee proposed; enter a different Identifing title in the form of FTE## (e.g. FTE01, FTE02, etc.) or PTE## (e.g. PTE01, PTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template. Enter one FTE# or PTE# for EACH indiviual proposed. (The number of FTE's and PTE's must coordinate with the submitted P-6 and P-7 for evaluation purposes.) |
| D, G, J, M, P | Proposed Fully Burdened Rates | Enter the Fully-Burdened Labor Rate per Hour proposed for the applicable performance period (e.g. Year_#) for personnel associated with the Proposed Labor Category. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Fully-Burdened Labor Rates shall include fringe, overhead, G&A, subcontractor pass-through rate, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. |
| Hours | Enter the number of hours to be performed for the applicable performance period (e.g. Year _#) for personnel associated with the Proposed Labor Category | |
| Annual Salary | Annual Salary shall be calculated as Proposed Fully Burdened Rates multiplied by the Hours for the applicable performance period (e.g. Year_#) for personnel associated with the Proposed Labor Category |
Tripwire Info
| Offeror Name | Government Labor Category | Individual Designator* | Fully Burdened Hourly and Overtime Rates | ||||||||||||||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |||||||||||||
| Proposed Fully Burdened Rate | Hours | Annual Salary | Proposed Fully Burdened Rate | Hours | Annual Salary | Proposed Fully Burdened Rate | Hours | Annual Salary | Proposed Fully Burdened Rate | Hours | Annual Salary | Proposed Fully Burdened Rate | Hours | Annual Salary | |||
| Program Manager, Sr. (Pax River, Offsite) KEY | 1,920 | ERROR:#VALUE! | |||||||||||||||
| Engineer, Sr. (Pax River, Onsite) KEY | 1,920 | ERROR:#VALUE! | |||||||||||||||
| Engineer, Sr. (Pax River, Onsite) KEY OVERTIME | 1,920 | ERROR:#VALUE! | |||||||||||||||
| Engineer, Sr. (Pax River, Onsite) | 1,920 | ERROR:#VALUE! | |||||||||||||||
| Engineer, Sr. (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineer, Sr. (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Engineer, Sr. (Pax River, Offsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (Pax River, Offsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (China Lake, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineer, Journeyman (China Lake, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineer, Junior (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineer, Junior (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Onsite) KEY | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Onsite) KEY OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, VI (Pax River, Offsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Pax River, Offsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Point Mugu, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Engineering Technician, IV (Point Mugu, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Onsite) KEY | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Onsite) KEY OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (COMOPTEVFOR, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (COMOPTEVFOR, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Offsite) | 1,920 | $0.00 | |||||||||||||||
| Systems Analyst, Sr. (Pax River, Offsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Computer Scientist, Sr. (Pax River, Onsite) KEY | 1,920 | $0.00 | |||||||||||||||
| Computer Scientist, Sr. (Pax River, Onsite) KEY OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Computer Scientist, Sr. (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Computer Scientist, Sr. (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Information Assurance Analyst, Sr. (Pax River, Onsite) | 1,920 | $0.00 | |||||||||||||||
| Information Assurance Analyst, Sr. (Pax River, Onsite) OVERTIME | 1,920 | $0.00 | |||||||||||||||
| Administrative Assistant, Journeyman (Pax River, Onsite) | 1,920 | $0.00 |
Overtime rates will be utilized if required. Offerors are not required to include any adjustments for Overtime in their proposals.
Attachment P5 - Proposed Fully Burdened Hourly and Overtime Rates RFP: N0042118R0040
File details come from the government source that posted it. Updated .