5. 4. 3 Battlespace Modeling and Simulation
Solicitation number
N00421-18-R-0034
Issued by

About this file

This document contains a CDRL attachment and related federal contract opportunity notice. The CDRL attachment provides a project financial summary for a Battlespace Modeling and Simulation task order, outlining labor hours and expenses to date totaling $250,000 with $780,000 in available funding and a labor balance of $530,000 remaining at the current burn rate of two months. It also lists travel details including three trips totaling $8,000 and material expenses of $12,000 including two desktop computers at $4,000.

The related federal contract opportunity is a draft RFP for engineering and technical support services required by the Naval Air Systems Command Naval Air Warfare Center 5.4.3 Integrated Battlespace Simulation and Test Simulation Division. Services include support for the Next Generation Threat System synthetic environment generator, Architecture Management Integration Environment, Joint Integrated Mission Model, and standard simulation protocols. The final RFP is anticipated for release in the first quarter of fiscal year 2019. Questions regarding the draft RFP must be submitted by email to the points of contact by the dates listed.

Attachment P9

View the file

Other files

File Type Posted
N00421-18-R-0034_Amendment_0002.docx DOCX document
RFP_Questions_and_Responses_1.docx DOCX document
Attachment_P6_CLIN_Breakout_spreadsheet_-_dated_16NOV2018.xls XLS spreadsheet
N00421-18-R-0034_Amendment_0001.docx DOCX document
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
Attachment_J1_OCI_List.doc DOC document
CDRL_A004_-_OPSEC_Plan.pdf PDF
CDRL_A003_-_Monthly_Status_Report.pdf PDF
Attachment_P4_PP_Info_Form.pdf PDF
N00421-18-R-0034.docx DOCX document
CDRL_A002_-_Project_Financial_Summary.pdf PDF
Attachment_J5_GFP.docx DOCX document
Attachment_P8_CDRL_A001.pdf PDF
Attachment__J4_DD254.pdf PDF
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
Attachment_J6_Wage_Determination.PDF PDF
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
Attachment_P6_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
DRFP_Questions_&_Responses.docx DOCX document
CDRL_A001_-_Monthly_Financial_Summary.pdf PDF
Attachment_P7_FB_Labor_Rate.xlsx XLSX spreadsheet
Attachment_P8_CDRL_A001.pdf PDF
N00421-18-R-0034_-_DRAFT_RFP.docx DOCX document
CDRL_A004_-_OPSEC_Plan.pdf PDF
Attachment_P9_CDRL_A002.pdf PDF
Attachment_P4_PP_Info_Form.pdf PDF
Attachment_J1_OCI_List.doc DOC document
Attachment_J5_GFP.docx DOCX document
CDRL_A002_-_Project_Financial_Summary.pdf PDF
Attachment__J4_DD254.pdf PDF
Attachment_P5_Ctr_Perf_Assess_Quest.pdf PDF
CDRL_A003_-_Monthly_Status_Report.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A002

Project Financial Summary

Attachment 3: CDRL A002 Format

N00421‐19‐D‐XXXX: Battlespace Modeling and Simulation

Task Order N00421‐18‐F‐XXXX

Reporting Period: MM/YYYY

PoP: MM/DD/YYYY ‐ M/DD/YYYY

Project Number: {Project #}

Project Name: {Project Name}

TPOC: {TPOC Name}

PROJECT SUMMARY Labor Travel Material

Monthly Expenses 78,000.00$ 5,000.00$ 4,000.00$

Total Expenses Through the Reporting Period 1 250,000.00$ 8,000.00$ 12,000.00$

Funding 780,000.00$ 12,000.00$ 50,000.00$

Balance 530,000.00$ 4,000.00$ 38,000.00$

Remaining Labor at Current Burn Rate (months)

6.8 ‐ ‐

LABOR HOURS

Regular Over Time Total Regular Over Time Total

{Prime Contractor Name}

{Contractor Name 1} {Labor Category} 140 140 400 400

{Contractor Name 2} {Labor Category} 160 4 164 480 4 484

{Contractor Name 3} {Labor Category} 80 80 460 460

{Contractor Name 4} {Labor Category} 160 8 168 480 8 488

{Contractor Name 5} {Labor Category} 160 160 420 420

{Contractor Name 6} {Labor Category} 160 160 460 6 466

{Sub Contractor 1 Name}

{Contractor Name 7} {Labor Category} 160 160 480 480

{Contractor Name 8} {Labor Category} 160 2 162 480 2 482

{Sub Contractor 2 Name}

{Contractor Name 9} {Labor Category} 160 160 480 480

{Contractor Name 10} {Labor Category} 120 120 440 4 444

{Contractor Name 11} {Labor Category} 80 80 240 240

1,540 14 1,554 4,820 24 4,844

TRAVEL DETAILS

Name 3 Destination 5 Total Cost

{Prime Contractor Name}

{Contractor Name 4} Pt. Mugu NAS 6/1/2019 ‐ 6/4/2019 2,000.00$

{Contractor Name 2} Norfolk, VA 6/22/2019 ‐ 6/27/2019 5,000.00$

{Contractor Name 4} Edwards AFB 7/6/2019 ‐ 7/8/2019 2,500.00$

{Sub Contractor 1 Name}

{Contractor Name 8} North Island / San Diego, CA 6/22/2019 ‐ 6/25/2019 1,500.00$

MATERIAL DETAILS

Description / Part Number Vendor Unit Cost Qty Total Cost

Desktop Computer Computer Company 2,000.00$ 2 4,000.00$

Dates of Travel

Total Hours

Name 3 Labor Category 4 Cumulative TotalCurrent Period

Notes:

1 ‐ Total expenses from the begining of the current task order base/option year.

2 ‐ Balance divided by current monthly expenses.

3 ‐ Contractor names formatted "{Last Name}, {First Name} {Middle Initial}."

4 ‐ Labor category per personnel requirements in Contract Section C.

5 ‐ Relevant travel site and/or location.

N00421‐18‐R‐0034 2018‐04‐24

File details come from the government source that posted it. Updated .