This is a request for proposal for a multiple award contract to provide systems engineering support services for air traffic control and landing systems programs including the Joint Precision Approach and Landing System. Proposals are due on December 4, 2018. The Naval Air Warfare Center Aircraft Division is seeking support for programs like JPALS, unmanned combat air systems, and other unmanned programs. The follow-on contract is anticipated to be competitively awarded as a multiple award contract with a five-year ordering period to provide engineering, logistics, and technical services including system integration, testing, configuration management, and program support. The incumbent contract was awarded in 2010 under solicitation N00421-10-R-1063.

Amendment to Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to AIR-4-11 ATC JPALS SHIPBOARD INTEGRATION MAC, newest first.
File Type Posted
N00421-18-R-0022-0002-_RFP_Amendment_2.pdf PDF
Response_to_Questions_1.pdf PDF
Attachment_3_Data_Transmittal_Form.doc DOC document
Attachment_P3_PPIF.pdf PDF
N00421-18-R-0022__ATC_MAC-RFP.pdf PDF
Attachment_2_QASP.pdf PDF
Attachment_P4_CPAQ.pdf PDF
Attachment_1_DD254.pdf PDF
Attachment_5_Locator_Form.docx DOCX document
Attachment_4_OCI.docx DOCX document
Exhibit_A_CDRLs.pdf PDF
Attachment_P5_CPAQ_Instructions.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

To modify the past performance language in Section L; Fill in the NAICS code on DFARS Clause 252.204-7007 in Section K and update the numbering in Section M

1. CONTRACT ID CODE PAGE OF PAGES

U 1 45

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Nov-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042118R0022

X 9B. DATED (SEE ITEM 11)

30-Oct-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Nov-2018

CODE

NAVAL AIR WARFARE CENTER AD (PAX)

BLDG 433, 47060 LILJENCRANTZ ROAD

PATUXENT RIVER MD 20670

N00421 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0042118R0022

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

NOTES

Amendment 1 Changes are:

1. Section C SOW- paragraph 10.1 Added MS degree to the educational requirement for the Program

Manager Labor Category

2. Section K Page 86: Clause 252.204-7007 was updated to add the NAICS code 334511 and Small

Business Size standard 1250

3. Section L Page 91 pararagaph 2.0 Proposal Format. Added the following to the language “and shall be no smaller than 10 pt. font. Headers and Footers shall be no smaller than 7 pt. font.”

4. Section L Page 92 paragraph 3.0 Proposal Content and Volumes . Page limit is added to Volume 2 past performance. Page limit for volume 2 is 3 pages per summary plus Attachment P3

5. Section L Page 94 Understanding the Work #9 Added “ the Government will consider using the work breakdown structure in #5”

6. Section L Page 97: revised language from “The Offeror(s) shall provide a narrative in addition to each Past Performance Information Form in the “Contract Effort Description” area that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified in Section M of the solicitation” to “The Offeror(s) shall provide a Volume 2 Past

Performance narrative in addition to the Past Performance Information Form (Attachment P3) that clearly describes how each contract reference has relevant work effort that matches the relevancy definitions specified in Section M of the solicitation.”

7. Section M Page 102: Updated the paragraph numbering by adding 1.0 to the pararaph titled

GENERAL

Admin note: This RFP utilizes Class Deviation (2018-O0006, dated 13 DEC 2017) which permits Multiple Award

Contracts (MACs) to exclude price/cost as an evaluation factor under certain conditions.

1. The Product Service Code (PSC) for this procurement is AC65, Defense Electronics and Communication

Equipment – Operational Systems Development.

2. This contract will have a five-year ordering period in accordance with NAVAIR Clause 5252.216-9506, the maximum value of this contract will not exceed $98,625,565.00

3. A Lot is defined as a five year ordering period for a specific CLIN (no option periods) or one year for a specific

CLIN (option period) to include all associated task orders placed during the ordering periods.

4. The contractor will be required to have a SECRET facility clearance and applicable clearances for personnel identified in Section C Statement of Work paragraph 6.0 prior to issuance of a task order under this contract.

The contractor will not be permitted access to classified information until a final DD254 is incorporated as an attachment to the contract.

POINTS OF CONTACT

Contract Specialist: Jonathan Igwebueze

Phone: 301-757-0859

E-mail: jonathan.igwebueze3@navy.mil

Procuring Contracting Officer: Frank Douglass

Phone: 301-757-0463

E-mail: frank.douglass@navy.mil

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

STATEMENT OF WORK

DESCRIPTION

Items 0001 and 0002 – The contractor shall provide services In Accordance With (IAW) and within the scope of the Section C Statement of Work (SOW) of the basic contract as detailed in the individual task orders.

Item 0003 – The contractor shall provide travel IAW the NAVAIR clause 5252.237-9509 and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.

Items 0004 and 0005 – The contractor shall provide material IAW the H-1 clause RESTRICTION ON THE

DIRECT CHARGING OF MATERIAL and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.

Item 0006 – The data to be furnished hereunder shall be IAW the Exhibit A, DD Form 1423, Contract Data

Requirements Lists (CDRLs) and within the scope of the Section C SOW of the basic contract as detailed in the individual task orders.

WORK STATEMENT

AIR TRAFFIC CONTROL AND LANDING SYSTEMS DIVISION

MULTIPLE AWARD CONTRACT

1.0. INTRODUCTION.

The Air Traffic Control (ATC) Systems Division, Naval Air Warfare Center, Aircraft Division (NAWCAD)

Patuxent River Code 4.11.7, located at St. Inigoes, MD is the In-Service Engineering Agent (ISEA) and Software

Support Activity (SSA) for Air Traffic Control and Landing Systems (ATC&LS). The ATC Division provides systems engineering support to ATC programs such as the AN/SPN-35, AN/SPN-41, AN/SPN-43, AN/SPN-46, AN/TPX-42, AN/SYY-1, Joint Precision Approach and Landing System (JPALS), Unmanned Common Automatic

Recovery System (U-CARS), and other unmanned programs.

AD-4.11.7 is tasked to fabricate, test, integrate and evaluate ATC&LS equipment into aircraft and ship platforms.

ATC&LS programs will require the installation and integration of components into test aircraft, mobile test platforms, and into various lab facilities. Support of this testing requires the management and operation of the test facility at NAS Patuxent River, MD, and mobile test facilities.

AD-4.11.7 is also tasked with the integration of ATC&LS technologies into manned and unmanned air vehicles, ships, and ground facilities.

mailto:jonathan.igwebueze3@navy.mil mailto:frank.douglass@navy.mil

Program activities will include efforts to simulate system performance, evaluate sensor units in operational environments, fabricate ATC interfaces, and provide operator feedback geared toward anticipated landing on a carrier suitable platform. AD-4.11.7 is tasked to fabricate and integrate the auto-land function, ATC interface, and

Automatic Aerial Refueling (AAR) functionality into aircraft and ship platforms as appropriate and conduct testing.

This will require the installation of these components into civil and military aircraft, Navy Aircraft Carrier

(CV/CVN) platforms, L-Class Amphibious Assault Ships (LHA/LHD) platforms, various unmanned platforms, and the ATC Mobile Test Platforms (MTP). Support of this testing will require the use of multiple mobile test vehicles requiring fabrication and integration efforts, and the set up and operation of the required test facilities.

1.1. Scope

The contractor shall provide technical products and engineering services as designated in the task orders and In

Accordance With (IAW) this Statement of Work (SOW) and Contract Data Requirements Lists (CDRLs) for the various systems under the NAWCAD Code 4.11.7 ATC Systems Division's cognizance. The scope of this contract includes, but not limited to research and development in the performance of product development and testing by accomplishing the following performance tasks.

1. Execute engineering and testing of ATC&LS systems into civil and military aircraft, ground and mobile stations. The contractor shall design and implement the installation and provide some systems components.

2. Execute unmanned CV and Air Segment Hardware/Software Integration (HSI) in multiple test beds including shore and mobile.

3. Execute integration of air-side ATC&LS components and subsystems into civil and military surrogate aircraft and the shore and mobile sites.

4. Supply engineering labor to support the design, development, and test of the algorithms associated with

ATC.

5. Supply engineering labor to support the flight clearance processes associated with ATC surrogate aircraft by providing engineering and data items that support approvals.

6. Support the integration activities by configuring tools such as the Naval Avionics Platform Integration

Emulator (NAPIE) to allow for non-production system operations on surrogate systems, and/or by sharing expertise gained during Technological Development (TD) phase integrations. Support lab and field-testing of incremental integration efforts. Provide subject matter consulting services in the areas of Global Positioning Systems (GPS), inertial sensors, and data links/networking.

7. Configure the SATNAV Facility and Technical Center (SAFTEC) facility equipment and ensure that the configuration documentation of the SAFTEC is kept current.

8. Configure mobile platforms to support required testing. Perform maintenance of the mobile platforms.

Ensure that the configuration documentation of the mobile platforms is kept current.

9. Supply technical labor to obtain or manufacture the components necessary to produce ATC&LS subsystems, and to assemble the components into a complete system.

10. Provide rapid fabrication and evaluation capabilities necessary to support evolving ATC&LS, GPS, inertial, and data link/networking technologies.

2.0. APPLICABLE DOCUMENTS. The following is a list of known documents that will be needed, used, and referred to during the performance of task orders under the technical and engineering services required by this

SOW, the latest versions of the listed documents shall apply and can be found on the ASSIST website at http://quicksearch.dla.mil/qsSearch.aspx, which provides direct access to Defense and Federal specifications and standards. Please use the most recent version of the following list of documents. Additional documents will be identified at the task order level.

2.1. REFERENCE DOCUMENTS

NUMBER TITLE

DoD 5200.1-R Information Security Program Regulations Joint Travel Regulations Vol.

DoD 5000.2 Operation of the Defense Acquisition System http://quicksearch.dla.mil/qsSearch.aspx

NAVAIRINST 4355.19D Systems Engineering Technical Review Process Naval Systems

Engineering Guide October 2004

MIL-STD-2036 General Requirements for Electronic Equipment Specifications

OPNAVINST 3432.1 Operations Security

3.0. REQUIREMENTS. CLINs 0001 through 0006. The contractor shall provide support to perform the tasks listed in paragraphs 3.1 through 3.10 below. The contractor shall work in conjunction with the shipboard ATC, JPALS, unmanned, AAR, War Fighter Network (WFN), Broad Area Maritime Surveillance (BAMS) and Unmanned

Aircraft Systems (UAS), Ground Based Sense and Avoid (GBSAA) (UAS/GBSAA) teams defined within the AD-

4.11.7 division. Analysis, recommendations, alternatives, estimates, reviews, research, and plans shall be presented by the contractor in report form, IAW the respective CDRL (DD Form 1423).

3.1. System Certification.

3.1.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide system certification support for certification and verification tests on fielded equipment at shore stations. If any existing certification and verification procedures are outdated because of hardware or software changes, the contractor shall provide recommended changes to the certification and verification procedures.

3.1.1.1. Deliverable Products. Contractor shall prepare and deliver the following:

a. Trip Report (CDRL A001)

3.1.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide system certification support for certification and verification tests on Engineering Change Proposal (ECP) modifications to fielded equipment at shore stations. If any certification and verification procedures are outdated because of hardware and software changes, the contractor shall provide recommended changes to the certification and verification procedures.

3.1.2.1. Deliverable Products. Contractor shall prepare and deliver the following:

3.1.3. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide system certification support for certification and verification tests on SCN-type equipment at shore stations. If any certification and verification procedures are outdated because of hardware and software changes, the contractor shall provide recommended changes to the certification and verification procedures.

3.1.3.1. Deliverable Products. Contractor shall prepare and deliver the following:

3.2 Technical Support.

3.2.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering and technical services for maintenance testing of fielded equipment and monitor, track, and report any unresolved deficiencies.

Contractor shall respond to technical assistance requests on fielded equipment and provide technical services including but not limited to: equipment fault isolation and repair; restoration of systems to normal operating condition; on-the-job (OJT) training of military technicians; and provide status briefing to the military chain of command and COR upon completion of the event. In some cases, technical assistance response may be provided by telephone or e-mail. The contractor shall document technical assistance responses provided by telephone or e-mail in the Monthly Progress Status Report.

3.2.1.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Progress Status Report (CDRL A035)

3.2.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide production engineering and technical services for test and evaluation of modifications to fielded equipment and monitor, track, and report any unresolved deficiencies. Contractor shall respond to technical assistance requests on modified fielded equipment and provide technical services in support of ECP efforts to include but not limited to: equipment fault isolation and repair; restoration of systems to normal operating condition; on-the-job (OJT) training of military technicians; and status briefing of military chain of command and COR upon completion of the event. In some cases, technical assistance response may be provided by telephone or e-mail. The contractor shall document the technical assistance responses provided by telephone or e-mail in the Monthly Progress Status Report.

3.2.2.1 Deliverable Products. Contractor shall prepare and deliver the following:

b. Progress Status Report (CDRL A035)

3.3. Provisioning Support.

3.3.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:

a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.

b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.

c. Order and track material and services to support equipment and projects.

d. Receive material to support equipment and projects.

e. Ship and track material to support equipment and projects.

3.3.1.1. Deliverable Products. Contractor shall prepare and deliver the following:

a. Inventory List Report (CDRL A002)

b. Provisioning Order Status Accounting Report (CDRL A003)

c. Receivables Accounting Report (CDRL A004)

d. Shipping Accounting Report (CDRL A005)

3.3.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:

a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.

b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.

c. Order and track material and services to support equipment and projects.

3.3.2.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Provisioning Order Status Accounting Report (CDRL A003)

3.3.3. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:

a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.

b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.

c. Order and track material and services to support equipment and projects.

3.3.3.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Provisioning Order Status Accounting Report (CDRL A003)

3.3.4. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide provisioning support including translating technical requirements and program constraints for inputs into acquisition documentation, ordering, maintaining status accounting, receiving provisioning items, controlling inventory, and distributing equipment. The contractor shall:

a. Maintain storerooms and/or warehouses for the storage of equipment spares and repair parts and provide an inventory report IAW PGI 245.103-72.

b. Monitor the spare parts inventory and recommend parts to be procured when quantities are low.

c. Order and track material and services to support equipment and projects.

3.3.4.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Provisioning Order Status Accounting Report (CDRL A003)

3.4 Systems Engineering.

3.4.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide production engineering, integrated logistics support, and technical support for the improvement of production items. The contractor shall:

a. Recommend improvements for system performance, reliability, maintainability, and supportability.

b. Provide proposed system improvements, ECPs, field change bulletins (FCBs), trouble reports (TRs), and provide recommendations as to their acceptability. Contractor shall review and conduct analysis of equipment performance, configuration, standardization, compatibility and interface, and system specifications in support of system improvements.

c. Analyze and recommend solutions for system performance and procedural problems reported

d. Provide updated installation control drawings (ICDs) for shore stations. Interface with station personnel on installation problems. Contractor shall also provide technical support for solutions to systems installation problems at shore facilities.

e. Provide field change kits ready for installation. Kits must be complete prior to scheduled installation.

f. Analyze maintenance, material management (3M) and casualty report (CASREP) failure data to determine the annual cost of ownership for each system and to determine the obtained operational availability for each system. Data shall be submitted in a recommendations report.

g. Provide configuration management of drawings for all ATC systems equipment. Contractor shall also provide a quarterly Configuration Status Accounting Report.

h. Provide a Software Development Plan.

3.4.1.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Recommendations Report (CDRL A006)

c. Engineering Report (CDRL A007)

d. Provisioning Parts List (PPL) (CDRL A009)

e. Provisioning Technical Documentation (PTD) (CDRL A010)

f. Drawing Configuration Status Accounting Report (CDRL A011)

g. System Operation Verification Testing Report (SOVT) (CDRL A012)

h. Software Development Plan (CDRL A040)

3.4.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering, logistic, and technical support for the improvement of modifications to existing systems. The contractor shall:

a. Recommend improvements for system performance, reliability, maintainability, and supportability.

b. Provide proposed system improvements ECPs, FCBs, TRs, and provide recommendations as to their acceptability. Contractor shall review and conduct an analysis of equipment performance, configuration, standardization, compatibility and interface, and system specifications in support of system improvements.

c. Analyze and recommend solutions for system performance and procedural problems reported.

d. Provide updated ICDs for shore stations. Interface with station personnel on installation problems.

Provide technical support for solutions to systems installation problems at shore facilities.

e. Provide field change kits ready for installation. Kits must be complete prior to scheduled installation.

f. Analyze maintenance, material management (3M) and CASREP failure data to determine the annual cost of ownership for each system and to determine the obtained operational availability for each system. Data shall be submitted in a recommendations report.

g. Provide configuration management of drawings for all ATC systems equipment. Contractor shall also provide a quarterly Configuration Status Accounting Report.

h. Provide a Software Development Plan.

3.4.2.1. Deliverable Products. Contractor shall prepare and deliver the following:

b. Recommendations Report (CDRL A006)

c. Engineering Report (CDRL A007)

d. Provisioning Parts List (PPL) (CDRL A009)

e. Provisioning Technical Documentation (PTD) (CDRL A010)

f. Drawing Configuration Status Accounting Report (CDRL A011)

g. System Operation Verification Testing Report (SOVT) (CDRL A012)

h. Software Development Plan (CDRL A040)

3.5. Systems Upgrades & Development Support

3.5.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering, integrated logistics support, and technical support for system upgrades. The contractor shall:

a. Review and analyze proposed systems operational and performance specification requirements. Tasks include operational and performance requirements recommendations, review, and analyses; equipment performance, configuration, standardization and compatibility analyses; interface analyses; and system specification reviews in support of new system acquisitions.

b. Support equipment development to ensure system compatibility and compliance with applicable

Government standards, specifications, performance requirements, quality assurance, and test provisions. Such tasks shall include review of development documentation, test documentation, and technical and operator's manuals for acceptability with SOW/specification and CDRL requirements.

Contractor shall support the Government in program reviews, design reviews, and configuration audits.

c. Prepare or review ICDs for shore stations. Interface with shore station personnel and other cognizant activities to present system installation requirements and resolve any installation problems.

d. Provide configuration management of drawings for all equipment. Contractor shall provide a quarterly

Configuration Status Accounting Report.

e. The contractor shall provide support in the development and presentation of training material for use in familiarizing personnel with the operation and maintenance of new or modified software and hardware.

Training materials developed under this paragraph are subject to DFARS 252.227-7020.

f. The contractor shall provide support for the planned maintenance of the systems, development of maintenance requirement cards (MRC’s), and maintenance index pages in accordance with MIL-P-

24534 Planned Maintenance System.

3.5.1.1 Deliverable Products. Contractor shall prepare and deliver the following:

b. Engineering Report (CDRL A007)

c. Recommendations Report (CDRL A006)

d. Training System Plan (CDRL A013)

e. Integrated Logistics Support Plan (CDRL A014)

f. User Logistics Support Summary (CDRL A015)

g. Maintenance Plan (CDRL A016)

h. Life Cycle Documentation (CDRL A017)

i. Installation Control Drawings (ICDs) (CDRL A008)

j. Provisioning Parts List (CDRL A009)

k. Provisioning Technical Documentation (CDRL A010)

l. Preventative Maintenance System Maintenance Requirement Cards (MRC) (CDRL A018)

m. Preventative Maintenance System Maintenance Index Pages (MIP) (CDRL A019)

n. Drawing Configuration Status Accounting Report (CDRL A011)

3.5.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering, logistic, and technical support for the development of new systems. The contractor shall:

a. Review and analyze proposed systems operational and performance specification requirements. Tasks include operational and performance requirements recommendations, review, and analyses; equipment performance, configuration, standardization and compatibility analyses; interface analyses; and system specification reviews in support of new system acquisitions.

b. Support equipment development to ensure system compatibility and compliance with applicable

Government standards, specifications, performance requirements, quality assurance, and test provisions. Such tasks shall include review of development documentation, test documentation, and technical and operator's manuals for acceptability with SOW/specification and CDRL requirements.

Contractor shall support the Government in program reviews, design reviews, and configuration audits.

c. Prepare or review ICDs for shore stations. Interface with shore station personnel and other cognizant activities to present system installation requirements and resolve any installation problems.

d. Provide configuration management of drawings for all equipment. Provide a quarterly Configuration

Status Accounting Report.

e. The contractor shall provide support in the development and presentation of training material for use in familiarizing personnel with the operation and maintenance of new or modified software and hardware.

Training materials developed under this paragraph are subject to DFARS 252.227-7020.

f. The contractor shall provide support for the planned maintenance of the systems, development of maintenance requirement cards (MRC’s), and maintenance index pages in accordance with MIL-P-

24534 Planned Maintenance System.

3.5.2.1 Deliverable Products. Contractor shall prepare and deliver the following:

b. Engineering Report (CDRL A007)

c. Recommendations Report (CDRL A006)

d. Training System Plan (CDRL A013)

e. Integrated Logistics Support Plan (CDRL A014)

f. User Logistics Support Summary (CDRL A015)

g. Maintenance Plan (CDRL A016)

h. Life Cycle Documentation (CDRL A017)

i. Installation Control Drawings (ICDs) (CDRL A008)

j. Provisioning Parts List (CDRL A009)

k. Provisioning Technical Documentation (CDRL A010)

l. Preventative Maintenance System Maintenance Requirement Cards (CDRL A018)

m. Preventative Maintenance System Maintenance Index Pages (CDRL A019)

n. Drawing Configuration Status Accounting Report (CDRL A011)

3.6. Systems Test and Evaluation

3.6.1. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering and technical services in support of testing and evaluation of equipment under production systems. The contractor shall:

a. Develop test plans and procedures to support production acceptance testing of new or modified systems to determine conformance to system specifications and performance and operational requirements.

b. Develop new or modify existing production acceptance test plans and procedures to support systems certifications.

c. Evaluate systems using the Government approved test plans and procedures to determine the degree of conformance with system specifications and performance and operational requirements. Contractor shall prepare interim and final engineering reports detailing test completion status, test results, and recommendations for all tests and evaluations conducted.

d. Provide support in production acceptance tests and evaluations of systems performed by activities in other shore locations.

e. Status and track the HW and SW configuration of the equipment under test.

3.6.1.1. Deliverable Products. Prepare and deliver the following:

b. Acceptance Test Plans and Procedures (CDRL A020)

c. Test Plans and Procedures (CDRL A021)

d. Test Report (CDRL A022)

e. Engineering Report (CDRL A007)

f. Problem Report (CDRL A023)

g. Configuration Status Accounting Sheet Information (CDRL A041)

h. Version Description Document (CDRL A042)

3.6.2. Requirements CLINs 0001 and 0003 through 0006. The contractor shall provide engineering and technical services in support of testing and evaluating new systems. The contractor shall:

a. Develop test plans and procedures to support acceptance testing of new or modified systems to determine conformance to system specifications and performance and operational requirements.

b. Develop new or modify existing test plans and procedures to support systems certifications.

c. Evaluate systems using the Government approved test plans and procedures to determine the degree of conformance with system specifications and performance and operational requirements. Contractor shall prepare interim and final engineering reports detailing test completion status, test results, and recommendations for all tests and evaluations conducted.

d. Provide support in tests and evaluations of new systems performed by activities in other shore locations.

e. Status and track the HW and SW configuration of the equipment under test.

3.6.2.1. Deliverable Products. Prepare and deliver the following:

b. Acceptance Test Plans and Procedures (CDRL A020)

c. Test Plans and Procedures (CDRL A021)

d. Test Report (CDRL A022)

e. Engineering Report (CDRL A007)

f. Problem Report (CDRL A023)

g. Configuration Status Accounting Sheet Information (CDRL A041)

h. Version Description Document (CDRL A042)

3.6.3. Requirements CLINs 0001 and 0003 through 0006. The contractor shall make recommendations related to the design and development of new SCN requirements. The contractor shall document, test, fabricate, and install operational hardware. The contractor shall:

a. Recommend engineering changes for the improvement of equipment.

b. Develop, fabricate, and install operational hardware field changes for SCN requirements.

c. Develop test plans and procedures to support testing of SCN systems and field changes to determine conformance to specifications and requirements. Test field changes using the test plans and procedures and provide test results.

d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.

e. Provide initial Technical Manual Revisions (TMRs) to document operational hardware.

f. Provide technical inputs to Provisioning Parts List (PPL) and Provisioning Technical Documents

(PTD).

g. Install operational systems into SCN platforms.

h. In support of SCN requirements: design, develop, fabricate, provide, and install operational software.

3.6.3.1. Deliverable Products. Prepare and deliver the following:

b. Recommendations Report (CDRL A006)

c. Level I/II/III Drawings (CDRL A024)

d. Test Plans and Procedures (CDRL A021)

e. Test Report (CDRL A022)

f. Technical Manual Revisions (CDRL A025)

g. Provisioning Parts List (CDRL A009)

h. Provisioning Technical Documentation (CDRL A010)

i. Version Description Document (CDRL A042)

3.7. Hardware and Software Support. The contractor shall provide hardware and software support for ATC systems and their components. The contractor shall:

3.7.1. Requirements CLINs 0001 through 0006. The contractor shall recommend, design and develop in support of ECPs, test, fabricate or assemble, install, and document field changes and modifications to operational hardware.

The contractor shall:

a. Recommend engineering changes for the improvement of equipment.

b. In support of ECP efforts: design, develop, fabricate, provide, and install prototype hardware field changes.

c. Develop test plans and procedures to support testing of system ECPs and field changes to determine conformance to specifications and requirements. Test field changes using the test plans and procedures and provide test results.

d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.

e. Provide TMRs to document field changes and modifications to operational hardware

f. Provide technical inputs to PPLs and PTD.

g. Install field changes in systems and provide an Evaluation Field Change Report (EFCR).

h. Based on accomplishments directly related to systems support, provide monthly inputs to the Fleet

Metrics Form.

i. In support of In Service Engineering Activity (ISEA) requirements and ECP efforts: design, develop, fabricate, provide, and install prototype software field changes.

3.7.1.1. Deliverable Products. Prepare and deliver the following:

b. Recommendations Report (CDRL A006)

c. Level I/II/III Drawings (CDRL A024)

d. Test Plans and Procedures (CDRL A021)

e. Test Report (CDRL A022)

f. Technical Manual Revisions (CDRL A025)

g. Provisioning Parts List (CDRL A009)

h. Provisioning Technical Documentation (CDRL A010)

i. Evaluation Field Change Report (CDRL A026)

j. Fleet Metrics Form (CDRL A027)

k. Version Description Document (CDRL A042)

3.7.2. Requirements CLINs 0001 through 0006. The contractor shall recommend, design, develop, test, prototype, and document field changes and upgrades to operational hardware. The contractor shall:

a. Recommend engineering changes for the improvement of equipment.

b. Provide design, development, and prototype hardware field change support.

c. Provide engineering support to develop test plans and procedures to facilitate testing of system ECPs and field changes to determine conformance to specifications and requirements. Contractor shall test field changes using the test plans and procedures and provide test results.

d. Fabricate, assemble, and provide the hardware necessary for field change kits and other modifications and improvements to equipment.

e. Provide Technical Manual Revisions to document field changes and modifications to operational hardware.

f. Provide technical inputs to PPLs and PTD.

g. Install field changes in systems and provide an EFCR.

h. Based on accomplishments directly related to systems support, provide monthly inputs to the Fleet

Metrics Form.

i. Design, develop, and prototype software field changes.

3.7.2.1. Deliverable Products. Prepare and deliver the following:

b. Recommendations Report (CDRL A006)

c. Level I/II/III Drawings (CDRL A024)

d. Test Plans and Procedures (CDRL A021)

e. Test Report (CDRL A022)

f. Technical Manual Revisions (CDRL A025)

g. Provisioning Parts List (CDRL A009)

h. Provisioning Technical Documentation (CDRL A010)

i. Evaluation Field Change Report (CDRL A026)

j. Fleet Metrics Form (CDRL A027)

k. Version Description Document (CDRL A042)

3.8. Production Support. The contractor shall provide engineering support during the production stage of ATC systems and their components. The contractor shall:

3.8.1. Requirements CLINs 0001 through 0006. The contractor shall fabricate upgrades for systems as follows:

a. Review engineering documentation for producibility and make recommendations for documentation changes and update engineering documentation when changes have been approved.

b. Develop a production program plan of execution and execute the planned requirements.

c. Assemble hardware in accordance with engineering documentation. Contractor shall support testing hardware for conformance to engineering documentation and provide status of hardware fabrication.

3.8.1.1. Deliverable Products. Prepare and deliver the following:

a. Recommendations Report (CDRL A006)

b. Level I/II/III Drawing Revisions (CDRL A024)

c. Production Program Plan (CDRL A028)

d. Test Report (CDRL A022)

3.8.2. Requirements CLINs 0001 through 0006. The contractor shall design system upgrades as follows:

a. Review engineering documentation for producibility and make recommendations for documentation changes and update engineering documentation when changes have been approved.

b. Develop a production program plan of execution and execute the planned requirements.

c. Assemble hardware in accordance with engineering documentation. Contractor shall test hardware for conformance to engineering documentation and provide status of hardware fabrication.

3.8.2.1. Deliverable Products. Prepare and deliver the following:

a. Recommendations Report (CDRL A006)

b. Level I/II/III Drawing Revisions (CDRL A024)

c. Production Program Plan (CDRL A028)

d. Test Report (CDRL A022)

3.9. Repair and Retrofit Program.

3.9.1. Requirements CLINs 0001 through 0006. The contractor shall overhaul and repair equipment in accordance with system specifications and overhaul procedures. The contractor shall:

a. Develop, revise, and provide overhaul and repair test plans and procedures.

b. Review, develop, revise, and provide Technical Repair Standards (TRS).

c. Perform electrical and mechanical overhaul and repair of equipment.

d. Perform electrical and mechanical tests on overhauled and repaired equipment to ensure proper system performance and provide test results.

3.9.1.1. Deliverable Products. Prepare and deliver the following:

b. Test Plans and Procedures (CDRL A021)

c. Test Report - provide test results and documentation. (CDRL A022)

d. Repair Status Report - provide monthly repair status reports, including shipping and scheduling status.

(CDRL A029)

e. Technical Repair Standards - provide or revise TRSs. (CDRL A030)

3.9.2. Requirements CLINs 0001 through 0006. The contractor shall repair equipment in accordance with system specifications and procedures. The contractor shall:

a. Develop, revise, and provide repair test plans and procedures.

b. Review, develop, revise, and provide TRS.

c. Perform electrical and mechanical overhaul and repair of equipment under production.

3.9.2.1. Deliverable Products. Prepare and deliver the following:

b. Test Plans and Procedures (CDRL A021)

c. Test Report - provide test results and documentation. (CDRL A022)

d. Repair Status Report - provide monthly repair status reports, including shipping and scheduling status.

(CDRL A029)

e. Technical Repair Standards - provide or revise TRSs. (CDRL A030)

3.10. Program Support.

3.10.1. Requirements CLIN 0001, 0003, 0004 and 0006. The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status and project milestones to prepare briefing and presentation material for various program reviews.

3.10.1.1. Deliverable Products. Prepare and deliver the following:

a. Briefing and Presentation Material (CDRL A031)

3.10.2. Requirements CLIN 0001, 0003, 0004, and 0006. The contractor shall collect, consolidate, and summarize information such as historical summaries, current project status and project milestones to prepare briefing and

3.10.2.1. Deliverable Products. Prepare and deliver the following:

3.10.3. Requirements CLIN 0001, 0003, 0004, and 0006. The contractor shall collect, consolidate and summarize information such as historical summaries, current project status and project milestones to prepare briefing and

3.10.3.1. Deliverable Products. Prepare and deliver the following:

3.10.4. Requirements CLIN 0001, 0003, 0004, and 0006. The contractor shall collect, consolidate and summarize information such as historical summaries, current project status and project milestones to prepare briefing and

3.10.4.1. Deliverable Products. Prepare and deliver the following:

4.0. PROGRESS REPORTS.

4.1. Funds Expenditure Report. The contractor shall prepare monthly funds expenditure reports at the task order level. The contractor shall report the costs associated with each SOW paragraph including a breakout of costs per task. The contractor shall reconcile monthly vouchers with these cost data and explain any discrepancies.

4.1.1. Deliverable Products. Prepare and deliver the following:

a. Funds Expenditure Report (CDRL A032)

b. Voucher Reconciliation Report (CDRL A033)

4.2. Time Expenditure Report. The contractor shall prepare monthly time expenditure reports at the task order level including monthly and year-to-date work hours (straight time and overtime), hourly rate, and costs expended per individual. These reports may be reviewed by a support contractor for compilation of data and verification purposes. A nondisclosure form shall be negotiated with the support contractor and a copy provided to the

Government.

4.2.1. Deliverable Products. Prepare and deliver the following:

a. Time Expenditure Report (CDRL A034)

4.3. Segregation of Cost and Invoice Requirements.

(a) The contractor shall segregate costs incurred under each task order, at the lowest level of performance, either by task or by subtask, rather than only on a Contract Line Item Number (CLIN) or total contract basis and shall submit invoices reflecting costs incurred at that level. In addition, the Contractor shall submit invoices containing summaries of work charged during the period covered, as well as overall cumulative summaries for all work invoiced to date.

When there is more than one line of accounting, the Government will describe each ACRN preceding the accounting citation in the contract or a particular CLIN. The Government will pay contractor invoices by charging only an

ACRN corresponding to the CLIN invoiced. Accordingly, when there are many lines of accounting, the

Government will fund each CLIN separately and it will summarize the funding level for each CLIN. The contractor’s invoices shall state separate incremental and cumulative amounts for each CLIN with further segregation by task and subtask showing each element of cost.

Invoices shall contain the following cost elements by schedule and include supporting detail. The contractor shall submit invoices with two attachments. The first attachment shall contain Schedules A through D, F and G and shall be provided as fully burdened. The second attachment shall contain Schedule E.

Invoice summary for current billing period and cumulative:

(Schedule A) – Direct Labor $

(Schedule B) – Material $

(Schedule C) – Travel $

(Schedule D) – Other Direct Charges $

(Schedule E) – Indirect Charges $

(Schedule F) – Adjustments $

TOTAL $

(Schedule G) – Outstanding Commitments

Schedule A – DIRECT LABOR

Period Covered Cumulative $

Employee Identifier Labor Category Hours

Billed Burdened Cost** Hours Billed Burdened Costs*

Off-site On-site*

TOTAL $ $

*On-site work is work performed at a Government installation. Off-site work is work performed at the contractor’s facility.

**The contractor shall make unburdened rate information available upon request. When requested, unburdened rate information shall not include indirect costs and shall reflect the actual rate paid.

Schedule B – MATERIAL

The contractor shall itemize material charges and shall include the invoice number, date, total amount, company, purchase order number, and description of the item. The contractor shall make a copy of the paid invoice available upon request.

Schedule C – TRAVEL

The contractor shall itemize travel charges and shall include the dates of travel, names of individuals traveling, destination, purpose, and total cost. The contractor shall make a copy of the travel voucher available upon request.

The contractor need not submit copies of back-up receipts, but should retain them, as they are subject to review, upon request.

Schedule D - OTHER DIRECT CHARGES

The contractor shall itemize other direct charges at the task order level. Copies of invoices shall be available upon request. Subcontractor invoices shall be in the same format and require the same detail.

Schedule E - INDIRECT CHARGES

Indirect charges include those charges based upon a rate that is subject to verification by DCAA at contract closeout.

Schedule F – ADJUSTMENTS

The contractor shall show current fiscal year invoice adjustments in this section along with the justification. The contractor shall invoice adjustments that pertain to prior fiscal years separately.

Schedule G – OUTSTANDING COMMITMENTS

The contractor shall show any authorized expenditure that remains unpaid that the Government will reimburse pending the receipt of a supplier invoice or travel claim in this section.

Invoices that require segregation by CLIN can either have the CLINs itemized on each schedule or have each CLIN presented individually. The contractor shall not claim nor will the Navy pay for direct costs associated with preparation of an invoice.

Program management/support charges are limited to the first level supervisor. Program management hours above the supervisory level and other support hours not identified in the RFP must be explained in the proposal with a justification of the specific duties to be performed, and shall not be permitted without approval of the contracting officer.

4.3.1. Deliverable Products. Prepare and deliver the following at the task order level:

a. Segregation of cost and invoicing requirements (CDRL A036)

4.4. Progress Report. The contractor shall prepare monthly progress reports describing tasks performed each month at the task order level.

4.4.1. Deliverable Products. Prepare and deliver the following:

a. Progress Status Report (CDRL A035)

4.5.1. Deliverable Products. Contractor shall deliver the following:

a. Executed copies of the NDAs (CDRL A039)

5.0. OTHER DIRECT COSTS (ODCS)

5.1. Material CLIN 0004. The contractor shall provide material or other items at the task order level, which are necessary or integral to the performance of tasking included in the SOW IAW Section H-2 clause Restriction on the

Direct Charging of Material.

5.1.1. Deliverable Products. Prepare and deliver the following:

a. Material Tracking Report (CDRL A037)

b. Government Furnished Property (GFP) (if applicable) Excel (Attachment 6)

5.2. Travel CLIN 0003. The contractor shall comply with the procedures set forth in Section H- Clause 5252.232-

9509 Travel Approval and reimbursement Procedures for further instruction. Travel will be allowable only when it is essential to the performance of the tasks detailed in Section 3.0. When travel to and from contractor sites is within

50 driving miles of NAS Patuxent River Webster Field Annex and Patuxent River, Maryland travel costs shall be unallowable costs. Based on historical data, the Government anticipates an average of 37 trips each year to various sites and DoD activities and U.S. Navy and Allied ship and shore facilities worldwide. Temporary travel to other locations in support of program tasking is required. Travel authorization requests (including plans, agenda, itinerary, or dates) shall be pre-approved by the Government. The table below provides detail of anticipated and historical travel locations, number of trips, number of peoples traveling, and the number of days per person per trip. Detailed travel requirements will be defined at the task order level.

Location Annual Trips People Days per Person per Trip

1) Norfolk, VA 10 3 5

2) San Diego, CA 8 3 5

3) Bremerton, WA 2 2 5

4) Pascagoula, MS 1 2 5

5.2.1. Deliverable Products. Prepare and deliver the following:

5.3. Field Services CLIN 0005. As defined at the task order level, it will be necessary for the contractor to have a field services funding allocation CLIN to provide funding for shipping, install location-preparation, and other related services. Shipping services include shipment and delivery services, such as FedEx, UPS and US Postal Service.