Attachment_5_Acronyms.xls
XLS spreadsheet 33 KB Posted
- Attached to
- AIR-4. 11, N00421-18-R-0013 AEGIS Radio Communication System (RCS) supporting AD-4. 11. 3
- Solicitation number
- N00421-18-R-0013
About this file
Attachment 5 Acronyms
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Acronyms | AEGIS Radio Communications System |
| AAA | AEGIS Acquisition Agent |
| AECL | AEGIS Equipment Configuration List |
| ALO | AEGIS Light Off |
| APL | Allowance Parts List |
| ASPD | AEGIS Ship Program Directive |
| ASR | Alternate System Reviews |
| ATE | Automatic Test Equipment |
| C41 | Command, Control, Communications, Computers and Intelligence |
| CAPS | Computer-Aided Podium System |
| CCBL | Configuration Control Baseline Implementation Letter |
| CCET | Computer Controlled Equipment Testing |
| CDR | Critical Design Review |
| CF | Change Forms |
| COSBAL | Coordinated Shore Based Allowance List |
| COTS | Commercial Off the Shelf |
| DCMS | Digital Communications Management System |
| ECO | Engineering Change Order |
| ECP | Engineering Change Proposal |
| EIN | Equipment Identification Number |
| FCT | Final Contract Trials |
| GFI | Government Furnished Information |
| GFIDR | Government Furnished Information Deficiency Reports |
| IAF | Installation Aid Fixture |
| ICAPS | Interactive Computer Aided Provisioning System |
| ICD | Installation Control Drawings |
| IGES | Initial Graphics Exchange Specification |
| ILS | Integrated Logistics Support |
| ILSP | Integrated Logistics Support Plan |
| INCO | Installation and Checkout |
| INSURV | Inspection and Survey |
| IRP | Interim Repair Parts |
| IRR | Integration Readiness Review |
| ISR | In Service Reviews |
| ITR | Initial Technical Reviews |
| LITR | Liaison Information Transmittal Reports |
| LYS | Lead Yard Services |
| MEL | Master Equipment List |
| MRC | Maintenance Requirement Card |
| MRP | Mission Readiness Panels |
| MSD | Material Support Dates Center |
| NAVICP | Navy Inventory Control Point |
| NAVSEALOGCEN | Naval Sea Logistics Center |
| NAWCAD | Naval Air Warfare Center Aircraft Division |
| NDI | Non-Developmental Item |
| NGSB | Northrop Grumman Shipbuilding |
| PARTS | PSD Automated Reporting Tracking System |
| PCA | Physical Configuration Audits |
| PDRs | Prelinimary Design Reviews |
| PEO | Program Executive Office |
| PMS | Planned Maintenance System |
| PTD | Provisioning Technical Documentation |
| RAPP | Receiving Acceptance Progress Plan |
| RCIA | Requests for Clarification, Interpretation, or Assistance |
| RCS | Radio Communications Systems |
| SC/AP | Surface Combatants/AEGIS Program |
| SCT | Ship's Custody Transfer |
| SETR | System Engineering Technical Review |
| SFR | System Functional Reviews |
| SIIRF-SIL | Invoice and Inventory Receipt Form |
| SIL | System's Integration Lab |
| SOVT | System Operational Verification Test |
| SPD | Ships Project Directives |
| SPTE | Special Purpose Test Equipment |
| SRRs | System Requirement Review |
| SSES | Ship Signal Exploitation Space |
| SSR | Software Specification Reviews |
| SUPSHIP | Supervisor of Shipbuilding |
| SVR | System Verification Reviews |
| TRR | Test Readiness Reviews |
Sheet2
Sheet3
File details come from the government source that posted it.