Attachment 11 QASP CSP

View the file

Other files

File Type Posted
Attachment_2_Wage_Determinations.doc DOC document
N00421-18-R-0013_Amendment_0001.pdf PDF
Attachment_P6_CLIN_Breakout_(PRIME)_Amendment_0001.xls XLS spreadsheet
Attachment_12_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
P2_AEGIS_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_13_OCI_List.docx DOCX document
Attachment_P3_Base_Access_Request_Form.docx DOCX document
Attachment_6_Authorized_Subcontractors.docx DOCX document
N00421-18-R-0013_AEGIS_Solicitation.pdf PDF
Attachment_9_GFP.pdf PDF
Attachment_7_Authorized_Key_Personnel.doc DOC document
Attachment_5_Acronyms.xls XLS spreadsheet
Attachment_2_Wage_Determinations.doc DOC document
Exhibit_A_-_AEGIS_RCS_-_CDRLs.xlsx XLSX spreadsheet
Attachment_8_-_COR_TBD.docx DOCX document
Attachment_P6_CLIN_Breakout_(PRIME).xls XLS spreadsheet
Attachment_3_DD254.pdf PDF
P1_AEGIS_Past_Performance_Information_Form.pdf PDF
Attachment_4_Contract_CLIN_Structure.pptx PPTX presentation
Attachment_P7_CLIN_Breakout_(SUB).xls XLS spreadsheet
Attachment_10_Turnkey_MGMT_Plan.docx DOCX document
Attachment_6_Authorized_Subcontractors.docx DOCX document
Attachment_9_GFP.pdf PDF
Attachment_8_-_COR_TBD.docx DOCX document
P2_AEGIS_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_2_Wage_Determinations.doc DOC document
Attachment_12_Data_Item_Transmittal_Acceptance_Rejection_Form.doc DOC document
Attachment_4_Contract_CLIN_Structure.pptx PPTX presentation
Attachment_5_Acronyms.xls XLS spreadsheet
Attachment_10_Turnkey_MGMT_Plan.docx DOCX document
Attachment_13_OCI_List.docx DOCX document
Exhibit_A_-_AEGIS_RCS_-_CDRLs.xlsx XLSX spreadsheet
Attachment_7_Authorized_Key_Personnel.doc DOC document
Attachment_P3_Base_Access_Request_Form.docx DOCX document
Attachment_3_DD254.pdf PDF
P1_AEGIS_Past_Performance_Information_Form.pdf PDF
Attachment_P7_CLIN_Breakout_(SUB).xls XLS spreadsheet
Attachment_11_QASP_CSP.docx DOCX document
Attachment_P6_CLIN_Breakout_(PRIME).xls XLS spreadsheet
N00421-18-R-0013_AEGIS_Draft_Solicitation.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-18-R-0013 Enclosure (6) Quality Assurance Surveillance Plan and Contract Surveillance Plan for AEGIS Radio Communication System (RCS)

1. Purpose

This requirement consists of both performance-based and non-performance-based CLINs; therefore, a Quality Assurance Surveillance Plan (QASP) and a Contract Surveillance Plan (CSP) are both required. The QASP/CSP is used to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.

This hybrid QASP/CSP is a Government developed and applied document used to ensure systematic quality assurance methods are used in the administration and surveillance of tasking under the contract. The intent is to ensure the Contractor performs in accordance with the performance metrics and the required Level of Effort (LOE) established, and the Government receives the quality of services called for in each CLIN.

This contract will provide support for the Ship & Air Integrated Warfare (SAIW) Division (Code 4.11.3) of NAWCAD, in the following areas:

· Engineering, production, integration, testing, installation, training, and certification of shipboard Command, Control, Communications, Computers, and Intelligence (C4I) electronic communication systems.

· Engineering, production, integration, testing, installation, training, and certification of like systems at shore sites associated with the deployment of fleet support to surface ships.

· Engineering, production, integration, testing, installation, training, and certification of mobile and airborne C4I electronic communication systems designed to interface with the C4I electronic architecture of surface ships.

Depending on the shipboard C4I electronic communication systems requirements, the Contractor will produce, test, evaluate, and prepare the fully integrated C4I electronic Radio Communication System (RCS) for shipment to a designated shipbuilder and support the subsequent installation and testing on board the ship. The Contractor shall provide support to the ship throughout the new construction phase of shipbuilding. Familiarization training for the ship’s crew is provided under the terms of this contract. Initial work will support the RCS for one Base Year, consisting of three AEGIS destroyers or comparable ships. Options are included for services to support an additional 12 AEGIS destroyers or comparable ships. These services can be applied to any U.S. Navy surface combatant or comparable ships and associated shipboard communication system.

A properly executed QASP/CSP will assist the Government in achieving the objective of this procurement.

2. Authority

Authority for issuance of this hybrid surveillance document is provided under Contract Section E - Inspection and Acceptance, which provides for inspection and acceptance of the services, products, and documentation called for in the contract, which will be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the QASP/CSP. The Contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract CLINs.

The hybrid QASP/CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the contract and each CLIN.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer (KO): A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.3. The ACO will be designated in the resulting contract. Contracting officers are designated via a written warrant that sets forth limitations of authority.

Contracting Officer Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads: The COR designates individual Government Project Leads to assist in administering of specific efforts under the contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this hybrid QASP/CSP Surveillance Plan:

Contracting Officer: The KO (either the PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer Representative: The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

Alternate Contracting Officer’s Representative: The ACOR assists the COR for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

Government Project Leads: The Government Project Lead is responsible for assisting in administering of specific efforts under the contract. A Government Project Lead cannot, in any manner, alter the scope of the contract, make commitments, or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, systems engineering, and life-cycle support of electronics, communications, and information systems services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed each year beginning one year after award. This evaluation will be one determinant in the exercising of future CLINs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business, and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as determining the appropriateness of exercising the available CLIN option periods, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid QASP/CSP.

b. QASP/CSP: This document will be used by the COR, ACOR, and Government Project Leads in the technical and cost administration of this contract. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the hybrid checklist provided herein.

7. Surveillance

Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the Contractor, the COR and Government Project Leads while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR will forward these records to the KO annually.

9. Enclosures

Enclosure (1): Quality Standards - Engineering by Performance Work Statement (PWS) and Statement of Work (SOW) Enclosure (2): CDRL Data Quality Standards Enclosure (3): Incentives Enclosure (4): Contract Surveillance Plan Enclosure (5): Contract Surveillance by CDRL Enclosure (6): Annual Surveillance Summary

N00421-16-R-0059 N00421-18-R-0013 Attachment 11

QUALITY STANDARDS - ENGINEERING BY PERFORMANCE WORK STATEMENT (PWS) AND STATEMENT OF WORK (SOW)

Required Service (Performance Requirements)
Standard (Performance Standards) / Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance (Quality Assurance)
Incentives
Engineering Services IAW PWS/SOW Para 3.3.1
Based upon feedback from the Government Project Leads, 95% of the services, products, and hours provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or Government Project Leads.
See Enclosure 3.
Production Support IAW PWS/SOW Para 3.3.2
Based upon feedback from the Government Project Leads, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. Metrics are provided in the PWS and will be used as a baseline in the evaluation.
100% Inspection by COR/ACOR and/or Government Project Leads.
See Enclosure 3.
Training Support IAW PWS/SOW Para 3.3.3
Based upon feedback from the Government Project Leads, 95% of the services, products, and hours provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or Government Project Leads.
See Enclosure 3.

N00421-18-R-0013 Enclosure (1)

CDRL DATA QUALITY STANDARDS

Description

Standard

AQL

Surveillance/ Method/Measure

Incentives

Technical Information Report A001
Submission is in accordance with the Data Item Description (DID) cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Test Procedure A002
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Technical Report - Study/Services A003
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Report, Record of Meeting/Minutes A004
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Service Engineering Report A005
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Product Drawings and Associated Lists A006
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Manuals, Technical: General Style and Format Requirements - RCS Technical Manual A007
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Test Procedures Preparation Directive A008
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Equipment Installation Instruction A009
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Logistic Management Information (LMI) Data Product A010
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Integrated Logistics Support Plan A011
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Integrated Program Management Report (IPMR) A012
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Ships Maintenance and Material Management (3-M) Manual - Planned Maintenance System (PMS); Ships Maintenance Action Forms A013
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.

Training Materials A014

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Software Development A015
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Presentation Material A016
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Quality System Plan A017
Submission is in accordance with the DID cited in the CDRL.
As an annual report, this deliverable must be on time and with no more than one revision per submission.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Inspection and Test Plan A018
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Technical Information Report - Project Closeout Report A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Financial Progress Report A020
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3
Segregation of Costs and Invoice Requirements Reporting A021
Submission is in accordance with the DID cited in the CDRL
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Status Report - Information Technology Personnel Security Report for NAVAIR Security A022
Submission is in accordance with the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Operations Security (OPSEC) Plan A023
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Contractor's Risk Management Plan A024
Submission is in accordance with the DID cited in the CDRL.
As a semi-annual report, this deliverable must be on time and with no more than one revision per submission.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.

RESERVED A025

Technical Information Report - Quarterly Hardware Procurement Report A026
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.
Transition Out Plan A027
Submission is in accordance with the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one revision.
100% Inspection by COR, ACOR and/or Government Project Leads.
See Enclosure 3.

N00421-18-R-0013 Enclosure (2)

INCENTIVES

The following incentives will apply to performance under this contract.

Assessment Period
Acceptable Performance Definition
How Measured
Incentives

Base 1:

Not more than one measurement area is rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the first assessment period using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 2:
Not more than one measurement area is rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the second assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 3:
Two or more measurement areas rated “Very Good” or above. None rated below “Satisfactory”.
End of the third assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 4:
Two or more measurement areas rated “Very Good” or above. None of the measurement areas are below “Satisfactory”.
End of the fourth assessment period evaluation using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 5:
Two or more measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are below “Satisfactory”.
End of the fifth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 6:
Two or more measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are below “Satisfactory”.
End of the sixth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 7:
Two or more measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are below “Satisfactory”.
End of the seventh assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 8:
Two or more measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are below “Satisfactory”.
End of the eighth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for additional tasking.*

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 9:
Two or more measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are below “Satisfactory”.
End of the ninth assessment period using the CPARS format covering the previous 12 months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

Final CPAR Review

After completion of all exercised CLINs.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final CPARS rating.

* The Government reserves the right not to award Option CLINs if the Contractor does not meet the acceptable performance standards, and/or meet all regulatory requirements.

The PWS/SOW and corresponding tasks and subtasks (to include CDRL submissions) will be assessed focusing on the following:

Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Cost Control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort will be assessed.

Business Relations: Assess the timelines, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for Small Businesses to participate in contract performance consistent with efficient performance of the contract, to include:

· Alaska Native Corporations (ANCs)

· Indian Tribes

· Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes)

· Women Owned Small Businesses

· HUBZone

· Veteran Owned

· Service Disabled Veteran Owned Small Business

Evaluation will focus on the metrics of actual small business utilization compared to the contract required targets and the offer’s Small Business Plan, included as part of their proposal response.

Other areas: Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (>5%) below initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although a few areas require minor improvement, these areas are offset by superior performance in other areas. The few problems that do exist are insignificant in nature and have been noted, and the Contractor has taken effective and quick corrective action.

Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (1-5%) below the initial estimates, increased timeliness, or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted, and the Contractor has taken satisfactory corrective action.

Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, costs are consistent with expectations, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by marginal performance in other areas.

Marginal Performance: Contractor’s performance does not meet the full intent of the contract requirements. The contractual performance of the CLIN, task, and subtask being assessed reflect a problem for which the Contractor has not yet identified marginally corrective actions. Costs have exceeded estimates without reasonable justification. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Cost control efforts are nearly nonexistent. Corrective actions were not taken or were ineffective.

For Level of Effort CLINs, hours delivered compared to the required hours will be evaluated and will influence the ratings awarded above. Negative cost and/or labor hour variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.

N00421-18-R-0013 Enclosure (3) N00421-18-R-0013 Enclosure (3)

Contract Surveillance Plan

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas as applicable utilizing the evaluation rating definitions listed in enclosure 3.

QUARTERLY EVALUATION – BY PWS/SOW

Description
Surveillance Method/

Measure

Dates
Quality Assessment
Schedule Assessment
Cost Control Assessment
Business Relations Assessment
Management Assessment
Utilization of Small Business Assessment
Other Areas Assessment
3.3.1 Provide Engineering Services support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or Government Project Leads.
3.3.2 Provide Production support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or Government Project Leads
3.3.3 Provide Training support IAW PWS/SOW requirements.
100% Inspection by COR/ACOR and/or Government Project Leads

N00421-18-R-0013 Enclosure (4) N00421-18-R-0013 Enclosure (5)

Contract Surveillance by CDRL

Description
Surveillance Method / Measure
Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments
Technical Information Report A001
100% Inspection by COR/ACOR and/or Government Project Leads.
Test Procedure A002
100% Inspection by COR/ACOR and/or Government Project Leads.
Technical Report - Study/Services A003
100% Inspection by COR/ACOR and/or Government Project Leads.
Report, Record of Meeting/Minutes A004
100% Inspection by COR/ACOR and/or Government Project Leads.
Service Engineering Report A005
100% Inspection by COR/ACOR and/or Government Project Leads.
Product Drawings and Associated Lists A006
100% Inspection by COR/ACOR and/or Government Project Leads
Manuals, Technical: General Style and Format Requirements - RCS Technical Manual A007
100% Inspection by COR/ACOR and/or Government Project Leads.
Test Procedures Preparation Directive A008
100% Inspection by COR/ACOR and/or Government Project Leads.
Equipment Installation Instruction A009
100% Inspection by COR/ACOR and/or Government Project Leads.
Logistic Management Information (LMI) Data Product A010
100% Inspection by COR/ACOR and/or Government Project Leads.
Integrated Logistics Support Plan A011
100% Inspection by COR/ACOR and/or Government Project Leads.
Integrated Program Management Report (IPMR) A012
100% Inspection by COR/ACOR and/or Government Project Leads.
Ships Maintenance and Material Management (3-M) Manual - Planned Maintenance System (PMS); Ships Maintenance Action Forms A013
100% Inspection by COR/ACOR and/or Government Project Leads.

Training Materials A014

100% Inspection by COR/ACOR and/or Government Project Leads.

Software Development A015
100% Inspection by COR/ACOR and/or Government Project Leads.
Presentation Material A016
100% Inspection by COR/ACOR and/or Government Project Leads.
Quality System Plan A017
100% Inspection by COR/ACOR and/or Government Project Leads.
Inspection and Test Plan A018
100% Inspection by COR/ACOR and/or Government Project Leads.
Technical Information Report - Project Closeout Report A019
100% Inspection by COR/ACOR and/or Government Project Leads.
Financial Progress Report A020
100% Inspection by COR/ACOR and/or Government Project Leads.
Segregation of Costs and Invoice Requirements Reporting A021
100% Inspection by COR/ACOR and/or Government Project Leads.
Status Report - Information Technology Personnel Security Report for NAVAIR Security A022
100% Inspection by COR/ACOR and/or Government Project Leads.
Operations Security (OPSEC) Plan A023
100% Inspection by COR/ACOR and/or Government Project Leads.
Contractor's Risk Management Plan A024
100% Inspection by COR/ACOR and/or Government Project Leads.

RESERVED A025

Technical Information Report - Quarterly Hardware Procurement Status Report A026
100% Inspection by COR/ACOR and/or Government Project Leads.
Transition Out Plan A027
100% Inspection by COR/ACOR and/or Government Project Leads.
Metric Summary:
Current Period
Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

N00421-18-R-0013Enclosure (5)

Annual Surveillance Summary

The COR will perform an assessment of overall contract performance utilizing the evaluation rating definitions listed in enclosure (3). This assessment will be completed annually covering the previous 12 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings.
Schedule
Review of Quarterly Ratings.
Cost Control
Review Quarterly of Ratings.
Business Relations
Review of Quarterly Ratings.
Management
Review of Quarterly Ratings.
Utilization of Small Business
Review of Quarterly Ratings.
Other Areas
Review of Quarterly Ratings.

Annual Surveillance Completed By: _______________________

Date Completed: ________________