CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Technical Report-Study/Services |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| SOW 4.0 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| AS REQ |
| AS REQ |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| AS REQ |
Reg
Repro
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 2 (FORMAT) – CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID REQUIREMENTS PARAGRAPH 3 (CONTENT) – DELIVERY SHALL CONSIST OF VARIOUS TECHNICAL DOCUMENTS, AS REQUIRED, INCLUDING: REPORTS, PLANS, STUDIES AND ANALYSES, TRAINING MATERIAL, ASSESSMENTS, BRIEFINGS, STRATEGIES, BUDGETING AND COST ESTIMATES, POA&MS, ETC.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA.
BLOCKS 10, 11, 12 & 13: SUBMIT AS REQUIRED BY THE GOVERNMENT. GOVERNMENT DISPOSITION OF APPROVAL / DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
DELIVER ELECTRONICALLY IN MS OFFICE OR COMPATIBLE FORMAT
DELIVER ELECTRONIC COPIES TO:
COR / ACOR
TPOC / ATPOC
COR
ACOR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 11
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER IPSC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
A002
Computer Software Product Software Documentation / Application / Interface Code and Documentation
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-IPSC-81488 |
| SOW 4.1.5.3 |
| NAE |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| AS REQ |
| AS REQ |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| AS REQ |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.2 FORMAT - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL. THE SOFTWARE CODE SHALL BE DELIVERED WITHOUT MARKINGS THAT WOULD IMPLY OWNERSHP OR RIGHTS NOT BELONGING TO THE GOVERNMENT.
DID SECTION 11 DISTRIBUTION STATEMENT IS DELETED, REFER TO BLOCK 9.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: SUBMIT AS REQUIRED BY THE GOVERNMENT. THE SOFTWARE CODE SHALL BE DELIVERED 3 BUSINESS DAYS AFTER COMLETION OF GOVERNMENT ACCEPTACE TESTING. THE SOFTWARE CODE DELIVERY SHALL BE PLACED ON A DESIGNATED GOVERNMENT SERVER FOR REVIEW AND ACCEPTACE. GOVERNMENT DISPOSITION OF APPROVAL/DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
DELIVER ELECTRONICALLY IN MS OFFICE OR COMPATIBLE FORMAT
DELIVER ELECTRONIC COPIES TO:
COR, ACOR
TPOC, ATPOC
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 11
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER ADMN |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Conference Minutes |
| Post-Award Conference Documentation |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81250A |
| SOW 4.8.1 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| 1 |
| SEE BLK 16 |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| N/A |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.1 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.2 (CONTENT) – CONTENT SHALL INCLUDE ITEMS APPLCIABLE TO SOW 4.8.1.
DID SECTION 11 DISTRIBUTION STATEMENT IS DELETED, REFER TO BLOCK 9.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: THE POST-AWARD CONFERENCE SHALL OCCUR NO LATER THAN 5 BUSINESS DAYS AFTER CONTRACT AWARD. SUBMIT MINUTES 10 BUSINESS DAYS AFTER CONFERENCE IS CONDUCTED. GOVERNMENT DISPOSITION OF APPROVAL / DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR, ACOR
* The Office of the COR is NOT to receive any CLASSIFIED material. **
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 11
ONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Contractor’s Progress, Status and Management Report |
| Monthly Activity Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80227 |
| SOW 4.8.2.3 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| MTHLY |
| 45 DAC |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.2 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.3 (CONTENT) – CONTENT SHALL ALSO INCLUDE ITEMS APPLCIABLE TO SOW 4.8.2.3.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: SUBMIT MONTHLY. GOVERNMENT DISPOSITION OF APPROVAL/DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 11
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER ADMN |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Report, Record of Meeting/Minutes |
| ESG Meeting Minutes |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81505 |
| SOW 4.8.2.4 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| MTHLY |
| AS REQ |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.1 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID PREPARATION INSTRUCTIONS PARAGRAPH 10.2 (CONTENT) – CONTENT SHALL INCLUDE ITEMS APPLCIABLE TO SOW 4.8.2.4
DID SECTION 11 DISTRIBUTION STATEMENT IS DELETED, REFER TO BLOCK 9.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: MINUTES MAY BE DELIVERD 10 WORKING DAYS AFTER THE ESG. GOVERNMENT DISPOSITION OF APPROVAL/DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR, ACOR
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 11
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| Status Report |
| Transition-In Documentation |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80368A |
| SOW 4.8.3.1 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 2 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID REQUIREMENTS PARAGRAPH 3 (CONTENT) – CONTENT SHALL INCLUDE ITEMS APPLCIABLE TO SOW 4.8.3.1, TO INLCUDE A TRANSTIION PLAN AND WEEKLY UPDATES.TRANSITION PERIOD IS ANTICIPATED TO BE 45 DAYS.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: INITIAL TRANSTION PLAN IS DUE NLT 5 DAYS AFTER POST AWARD CONFERENCE, WITH UPDATES SUBMITTED WEEKLY THROUGHOUT THE DURATION OF THE TRANSITION PERIOD. GOVERNMENT DISPOSITION OF APPROVAL/DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 11
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| Phase-Out Transition Plan |
| Transition-Out Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81945 |
| SOW 4.8.3.2 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 1 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL.
DID REQUIREMENTS PARAGRAPH 2 (CONTENT) – CONTENT SHALL ALSO INCLUDE ITEMS APPLCIABLE TO SOW 4.8.3.2. TRANSITION PERIOD IS ANTICIPATED TO BE 45 DAYS.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: SUBMIT 90 DAYS AFTER CONTRACT AWARD WITH UPDATES DURING THE TRANSITION-OUT PHASE AS REQUIRED. GOVERNMENT DISPOSITION OF APPROVAL / DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR, ACOR, TPOC, ATPOC
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 11
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER FNCL |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| Man Hours Expenditure Chart |
| ECMRA Expenditure Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-FNCL-80003A |
| SOW 4.8.4 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 2 (FORMAT AND CONTENT) – FORMAT AND CONTENT SHALL BE IAW SOW 4.8.4 AND THE ENTERPRISE-WIDE CONTRACTOR MANPOWER APPLCIATION (ECMRA) LOCATED AT https://doncmra.nmci.navy.mil.
BLOCKS 12 & 13: INPUTS MUST BE REPORTED NO LATER THAN OCTOBER 31 OF EACH CALENDER YEAR. GOVERNMENT DISPOSITION OF APPROVAL / DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 11
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| NAE Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A009 |
| Status of Government Furnished Equipment (GFE) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80269 |
| SOW 4.8.5 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| QTRLY |
| 90 DAC |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 10.1 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL. FORMAT MUST INCLUDE LOCATION OF ALL GFP/GFE/GFM/CAP.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA.
BLOCKS 10, 11, 12 & 13: SUBMIT 90 DAYS AFTER CONTRACT AWARD WITH QUARTERLY UPDATES. GOVERNMENT DISPOSITION OF APPROVAL / DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR, ACOR, TPOC
COR
TPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 11
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MISC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
NAE Support
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A010 |
| Trip/Travel Report |
| Trip Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-81943 |
| SOW 4.8.6 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| AS REQ |
| AS REQ |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| N/A |
| AS REQ |
16. REMARKS:
BLOCK 4: TAILORED CONTENT REQUIREMENTS
DID REQUIREMENTS PARAGRAPH 1 (FORMAT) - CONTRACTOR FORMAT IS ACCEPTABLE, PENDING GOVERNMENT APPROVAL. CONTENT SHALL BE IAW SOW 4.8.6.
BLOCK 7: AT THE DISCRETION OF THE GOVERNMENT, CDRL DISPOSTION MAY BE FURNISHED VIA EMAIL.
BLOCK 9: A DISTRIBUTION STATEMENT IS REQUIRED AND SHALL BE OBTAINED FROM THE GOVERNMENT BY THE CONTRACTOR PRIOR TO THE TIME REQUIRED FOR DELIVERY OF THE DATA
BLOCKS 10, 11, 12 & 13: SUBMIT AS REQUIRED BY THE GOVERNMENT. GOVERNMENT DISPOSITION OF APPROVAL/DISAPPROVAL WILL BE WITHIN 10 BUSINESS DAYS UNLESS OTHERWISE SPECIFIED. IF THE CDRL IS DISAPPROVED, THE CONTRACTOR SHALL HAVE 5 BUSINESS DAYS TO RESUBMIT THE CDRL.
COR
TPOC
ATPOC
15. TOTAL
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 11
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP TM OTHER MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| NAE Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A011 |
| Operation Security (OPSEC) Plan |
| Status Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80934C |
| PWS 7.1 |
| NAE |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. APP CODE |
| SEE BLOCK 16 |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
Block 4: Use the definition of sensitive information given in Title 15, US Code Section 278g-3(d)(4) Public Law 100-235 (101 STAT 1727). Security policy, procedures and requirements for classified information (as defined in FAR 4-401), are provided in DoD Manual 5220-22-M, National Industrial Security Program Operating Manual (NISPOM). Use OPNAVINST 3432.1 and National Security Decision Directive 298 of 22 January 1988 for the concept of Operations Security, and apply the framework for telecommunications security in DFARS clause 252.239-7016. Add "TEMPEST requirements are not considered pricing OPSEC requirements. TEMPEST requirements, if applicable, are addressed separately in the DD Form 254 incorporated into this contract."
Block 9: The words, "FOR OFFICIAL USE ONLY" shall be conspicuously marked at the bottom of the outside cover (if any), on the bottom of each page, and on the bottom of the outside back cover (if any). The front cover (if any) or the first page of the document shall also be conspicuously marked with the following statement: "This document contains information EXEMPT FROM MANDATORY PUBLIC DISCLOSURE under the Freedom of Information Act. Exemption b(2) applies." These markings shall also be applied in an appropriate manner to any data provided in electronic media or transmission. Electronic transmission of such data must be via FIPS 140-1 compliant encryption. EXEMPTIONS: b(2) shall be used on documents which concern internal working processes or procedures (i.e, OPSEC Plans or Program Protection Implementation Plans). [Also, add the Distribution Statement here].
Blocks 10, 11, 12 and 13: Preliminary draft plan due 90 days after receipt of Government security data. Final plan due 45 days after Government approval of draft. Revisions are required after approval of plan during the performance of this contract ONLY to comply with Government Data Protection Policy document revisions.
Block 14: The plan will be FOUO and cannot be posted on a public website. Must be submitted in electronic form or hard copy or on an Integrated Data Environment to the COR.
COR
ACOR
| 15. TOTAL |
| 0 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
I. APPROVED BY
J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 11 image1.wmf