Attachment_1_SAC_(For_Informational_Purpose_Only).docx

DOCX document 48 KB Posted

Attached to
AIR-6. 7 Industrial and Logistics Maintenance Planning Support (Cherry Point)
Solicitation number
N00421-15-R-0066
Issued by

About this file

SAC (For Informational Purpose Only)

View the file

Other files

File Type Posted
PPQ_Industry_Question.docx DOCX document
N00421-15-R-0066-0002.docx DOCX document
Answers_for_N00421-15-R-0066_5.12.16.docx DOCX document
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
N00421-15-R-0066-0001.docx DOCX document
N00421-15-R-0066.pdf PDF
Attachment_2_DD254.pdf PDF
Attachment_3_Wage_Determination-Cherry_Point.pdf PDF
Exhibit_A_CDRLs.pdf PDF
Attachment_P7_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_P6_CLIN_Breakout_spreadsheet_V7z_____11_Oct_2012_with_CIC.xls XLS spreadsheet
Attachment_P5_Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Attachment_P4_Past_Performance_Matrix.doc DOC document
N00421-15-R-0066_Responses.docx DOCX document
AIR-6_7_SOW_CHPT_Advanced_Planning_Notice.docx DOCX document
Level_of_Effort_Advanced_Planning.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 Enclosure (2) N00421-15-R-0066

Surveillance Activity Checklist Logistics and Technical Support Services Industrial and Logistics Maintenance Planning/Sustainment Competency, AIR-6.7 Cherry Point, NC

1. Purpose This Surveillance Activity Checklist (SAC) is a Government developed and applied document used to make sure the systematic quality assurance assessment methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the Government receives the quality of services and products for tasks identified in the SOW.

The contract requirement is for Logistics and Technical support services for the Industrial and Logistics Maintenance Planning/Sustainment Competency at Cherry Point, AIR-6.7. Support services to be provided under this effort include planning, analysis, development, training, support equipment management, facilities and execution support.

2. Authority Authority for the issuance of this SAC is provided under Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in task orders, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the SAC. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract.

The Checklist is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4. Government Resources Outlined below are the following definitions of the roles and responsibilities for Government resources as applicable to this SAC:

Contracting Officer – A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is code Mr. J. Larry Mattingly, AIR-2.5.1.14. The ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) / Task Order COR (TOCOR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract and TOCORs will be appointed in each task order. The limitations of authority are contained in a written letter of appointment.

5. Responsibilities The following Government resources shall have responsibility for the implementation of this SAC.

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Contracting Officer’s Representative (COR) / TOCOR – The COR / TOCORs are responsible for technical administration of the contract and task orders respectively and assures proper Government surveillance of the contractor’s performance. The COR/ TOCORs are not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS) – The marketplace for logistics and technical service is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS ratings under this contract. For this procurement the Government will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the SAC.

b. SAC – The below listed methods of surveillance will be used by the TOCORs in the technical administration of this checklist. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Semi-Annual SAC.

c. Observation, Feedback, and Review – Unscheduled observation of products and services provided by the contractor on site and recurring review of contractor submitted reports and documentation identified in CDRLs will be performed by the TOCORs. Feedback from customers will be collected and used by the TOCORs to document surveillance of technical performance.

7. Surveillance The SAC, Enclosure (1), will be provided to the contractor on a monthly basis, as feedback on the performance of their management and quality control actions for meeting the quality standards set forth by the contract.

8. Documentation In addition to providing quarterly reports to the Contracting Officer, the COR / TOCORs will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Semi-annual Customer Survey Checklists provided herein as Enclosure (3). All such records will be maintained for the life of the contract. The COR / TOCORs shall forward these records to the Contracting Officer at termination or completion of the order.

9. Enclosures Attachment 1 N00421-15-R-0066

Attachment 1 N00421-15-R-0066

Enclosure (1) - SAC Source Selection Information 1 For Official Use Only See FAR 3.104 and 2.101

Source Selection Information 3 For Official Use Only See FAR 2.101 and 3.104 SURVEILLANCE ACTIVITY CHECKLIST (Enclosure 1)

All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Management – Assess the integration and coordination of all activity needed to execute the contract or order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts.

Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals (especially responses to change orders, Engineering Change Proposals (ECPs), the Contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction. Consider the Contractor’s responsiveness to the program as it relates to meeting contract or order requirements during the period covered by the report.

Assess the extent to which the Contractor: discharges its responsibility for integration and coordination of all activity needed to execute the contract or order; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks and actions required by contract or order; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk management practices, especially the ability to identify risks, and to formulate and implement risk mitigation plans. If applicable, identify any other areas that are unique to the contract or order, or that cannot be captured elsewhere under the Management element.

Assess the contractor’s performance in selecting, retaining, supporting, and replacing, when necessary, key personnel.

Regulatory Compliance – Assess compliance with all terms and conditions in the contract or order relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations, as well as any other reporting requirements in the contract.

Other areas – Assess additional evaluation areas unique to the contract, or that cannot be captured elsewhere.

Monthly Surveillance:

The COR will perform a monthly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed below.

The evaluation ratings definitions are as follows:

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Enclosure (1) Surveillance Activity Checklist

Description
Surveillance Method/Measure
Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt.

Other

Research and analyze changes to ILS and systems acquisition policy and provide recommendations on impacts to current logistics support programs
TOCOR review of accuracy and timeliness of reports
NLT the 10th day of the month*
Evaluate output products and/or conduct LORA and LSA projects
TOCOR observation and review of accuracy and timeliness of logs and reports
NLT the 10th day of the month*
Recommend strategy for the sustainment of CPI programs and provide resources to sustain and improve current programs in the absence of Government resources
TOCOR review of accuracy and timeliness of recommendations
NLT the 10th day of the month*
Provide analyses, technical studies and reports in support of organizational, intermediate, and depot level maintenance tasks
TOCOR observation and review of accuracy and timeliness of logs and reports
NLT the 10th day of the month*
Analyze Manpower, Personnel and Training (MPT) effectiveness to determine interim and follow-on training requirements
TOCOR observation and review of accuracy and timeliness of reports
NLT the 10th day of the month*
Assess and review ECPs, TDs and publication changes, and related documents to assure that ILS requirements are properly addressed and are consistent within program constraints
TOCOR review of accuracy and timeliness of logs and reports
NLT the 10th day of the month*
Contractor’s Progress, Status and Management Report
100% inspection by TOCOR
NLT the 10th day of the month*
Operations Security (OPSEC) Plan
100% inspection personnel identified in CDRL A002
See CDRL A002
Repair Level Analysis
100% inspection by TOCOR
NLT the 10th day of the month*
Logistics Product Data Summaries
100% inspection by TOCOR
NLT the 10th day of the month*
Diminishing Manufacturing Sources and Material Shortages (DMSMS) Plan
100% inspection by TOCOR
NLT the 10th day of the month*
Supportability: Systems Operational Effectiveness Plan & Report
100% inspection by TOCOR
NLT the 10th day of the month*
Reliability trend analysis and Documentation of Supporting Data
100% inspection by TOCOR
NLT the 10th day of the month*
Test Package
100% inspection by TOCOR
NLT the 10th day of the month*
Instructional Performance Requirements Document
100% inspection by TOCOR
NLT the 10th day of the month*
Conference Minutes
100% inspection by TOCOR
NLT the 10th day of the month*

* If the 10th falls on a holiday, weekend or day of office closure, planned date will be on the first regular business day.

Monthly Summary of Ratings:

QualitySchedule
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____
Cost ControlBusiness Relations
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____
ManagementOther Areas
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____

Attachment 1 Enclosure (1) N00421-15-R-0066

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104 PER FAR REQUIREMENT 3.104-4(C) Enclosure (2)

ANNUAL CPARS SURVEILLANCE

Surveillance will be completed annually with Contract Performance Assessment Report (CPAR) across all task orders.

Assessment Description
Method of Surveillance
Date Planned
Date Completed
Summary Rating
Results
Quality of Service
· 100% Inspection by TOCOR

· Review of Monthly CDRLS Assessment complete by NLT the current DoN required deadline

Schedule
· 100% Inspection by TOCOR

Assessment complete by NLT the current DoN required deadline

Cost Control
· 100% Inspection by TOCOR

Assessment complete by NLT the current DoN required deadline

Business Relations
· 100% Inspection by TOCOR

Assessment complete by NLT the current DoN required deadline

Management
· 100% Inspection by TOCOR

Assessment complete by NLT the current DoN required deadline

Other
· 100% Inspection by TOCOR

Assessment complete by NLT the current DoN required deadline

File details come from the government source that posted it. Updated .