N00421-15-R-0052-0001.pdf
PDF 390 KB Posted
- Attached to
- AIR 6. 7 Logistics Support Federal contract opportunity
- Solicitation number
- N00421-15-R-0052
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00421-15-R-0052-0003.pdf | ||
| P5_Past_Performance_Questionnaire.doc | DOC document | |
| Industry_Questions_ _Answers_Part_II.pdf | ||
| N00421-15-R-0052-0002.pdf | ||
| Industry_Questions_and_Answers_Part_I.pdf | ||
| CDRLS_A001-018.pdf | ||
| P5_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_01_DD254.pdf | ||
| Attachment_P6_CLIN_Break_Out_Spreadsheet.xls | XLS spreadsheet | |
| Attachment_P7FullyBurdenedLaborRates.xlsx | XLSX spreadsheet | |
| N00421-15-R-0052.pdf | ||
| Attachment_02_SAC_(For_Infromational_Purpose_Only).docx | DOCX document | |
| P5_Past_Performance_Questionnaire.doc | DOC document | |
| P4_Past_Performance_Matrix.doc | DOC document | |
| Exhibit_A_CDRL_A001-018.PDF | ||
| Industry_Questions_and_Answers.docx | DOCX document | |
| Draft_AIR-6.7__National_Contract_SOW.08112015.docx | DOCX document | |
| LOE_break_down_by_Ordering_Period.xlsx | XLSX spreadsheet |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes in section A.
1. CONTRACT ID CODE PAGE OF PAGES
1 31
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00421-15-R-0052
X 9B. DATED (SEE ITEM 11)
21-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-May-2016
CODE
NAVAL AIR WARFARE CENTER AD-PAX
CODE 2.5.1.14
21983 BUNDY ROAD
BLDG 441
PATUXENT RIVER MD 20670
N00421 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00421-15-R-0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been added by full text:
SUMMARY OF CHANGES
The purpose of this modification is to:
1) Extend the proposal due date to 31 May 2016 at 3:00pm Eastern Standard Time;
2) Update section E Inspection and Accpetance;
3) Update Section F Delivery and Performance;
4) Update Section J Exhibit A CDRL attachments , CDRL A014 Title has been updated to reflect SOW;
5) Update Section L Clause 5252.215-9503, Anticipated Award Date has been updated;
6) Update Section L Part A para 2.0;
7) Update Section L Part A para 3.0 Table;
8) Update Section L Part B Volume 1 Executive Summary;
9) Update Section L Part B para 4.0;
10) Update Section L -2 Government Furnished Information; and
11) Update Section M Part B section 3.0 Tripwire information.
SECTION E - INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 0008 has been changed from:
The Acceptance/Inspection Schedule for CLIN 0015 has been changed from:
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item has been added to CLIN 0002:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
POP 24-OCT-2016 TO
23-OCT-2021
N/A N/A
FOB: Destination
The following Delivery Schedule item has been added to CLIN 0008:
The following Delivery Schedule item has been added to CLIN 0015:
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRL A001-A018 18 07-MAR-2016
Attachment 1 DD254 18-NOV-2015
Attachment 2 SAC (For Informational
Purposes Only)
Attachment P4 P4 - Past Performance
Matrix
28-JAN-2016
Attachment P5 P5 - Past Performance
Questionnaire
28-JAN-2016
Attachment P6 P6 - CLIN Breakout
Spreadsheet
28-JAN-2016
Attachment P7 P7 Fully Burdened Labor
Rate to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A CDRLS A001-018 18 11-MAY-2016
Attachment 1 DD254 18-NOV-2015
Attachment 2 SAC (For Informational
Purposes Only)
Attachment P4 P4 - Past Performance
Matrix
28-JAN-2016
Attachment P5 P5 - Past Performance
Questionnaire
28-JAN-2016
Attachment P6 P6 - CLIN Breakout
Spreadsheet
28-JAN-2016
Attachment P7 P7 Fully Burdened Labor
Rate
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
5252.215-9503 ANTICIPATED AWARD DATE (NAVAIR)(FEB 1995)
The anticipated award date for this requirement is [24 October 2016]. This information is provided for use as a basis for schedules and burden (labor, overheads, G&A, etc.) mid-point calculations.
PART A GENERAL INSTRUCTIONS
1.0 GENERAL
The North American Industry Classification Code System (NAICS) code for this requirement is
541330 which has a small business size standard of $38.5M.
The Offeror is required to submit sufficient information concerning the following areas to enable
Government personnel to fully ascertain capabilities of the Offeror to perform the requirements.
The proposal must be sufficient in detail and scope to permit evaluation and provide the evaluators a clear understanding of the Offerors capability to meet or exceed the defined elements as required by the solicitation. All proposals must clearly and convincingly demonstrate that the Offeror has a thorough understanding of the requirements and associated risks. Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation. The Government may incorporate any portions of the Offerors proposal deemed beneficial to the Government. Cost and pricing information should only appear in the Price/Cost volume.
In presenting material in the proposal, quality of information is more important than quantity.
Clarity, brevity, and logical organization should be emphasized during proposal preparation.
The Offeror shall present sufficient information to allow the Government to evaluate the proposed work effort, support, and approach, as well as the price/cost proposal without opening discussions. Statements that the prospective Offeror understands, can comply with or will comply with, the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate by the Government, and may result in a rating of unacceptable.
The Offeror must include any data that illustrates the adequacy of the various assumptions, approaches, and solutions to problems. Failure to address a specific factor or subfactor clearly may be considered a deficiency. There is no need to repeat information in more than one volume if an overlap exists; the detailed information must be included in the most logical place and summarized and referenced in other areas. Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.
Offeror is expected to comply with all requirements of the RFP. Taking exception or deviating from any term or condition of the RFP may make an offer unacceptable, and the proposal unawardable, unless the RFP expressly authorizes such an exception or deviation with regard to that specific term or condition. The Government may consider any exception or deviation to any term or condition of the RFP that is not expressly authorized by the RFP to be a deficiency.
Throughout these instructions, a “principal subcontractor” is defined as a subcontractor who provides at least 10% of the proposed total price/cost (excluding the Offerors profit/fee), for the contract. “Team member” is defined one of the entities that make up a joint venture (JV) or any other partnership or teaming arrangement formed for the purpose of responding to this solicitation.
Questions: Offerors may submit questions requesting clarification of solicitation requirements by emailing the contract specialist at may.dimitrov@navy.mil and the contracting officer at stephanie.dunlap@navy.mil . Please submit any questions within 10 calendar days of the date this solicitation is issued.
2.0 PROPOSAL FORMAT
Written proposals must be formatted using a Times New Roman 12 pt normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. All pages should be numbered with section and page numbers. When foldout pages are used they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs shall be presented in no smaller than a 10 pt font and should contain a grid, which allows values to be read directly from the graph to the same accuracy that a 10 x 10 to the inch grid provides. Graphic resolution, including such data as tables or charts, should be consistent with the purpose of the data presented.
mailto:may.dimitrov@navy.mil mailto:at%20stephanie.dunlap@navy.mil mailto:at%20stephanie.dunlap@navy.mil
The Offeror will provide complete copies of the proposal to the Procuring Contracting Officer
(PCO) as electronic files fully compatible with Microsoft Office 2010 and for information not supported by MS Office products, with the latest Adobe Acrobat reader, on CD-ROM as detail at table in paragraph 3.0. The Offeror will ensure that the Price/Cost Volume is provided on a separate CD-ROM. Each CD-ROM is to be labeled for content and the Offerors name. If a discrepancy exists between the original paper copy of the proposal and the disk copy, the paper copy will take precedence.
The Offeror must present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this Proposal Instruction. Proposal information must be structured such that its paragraph number/letter is identical to the Proposal
Instructions paragraph number to which it is responding, although the Offeror may add lower tier subparagraphs. The Offeror must provide reasons it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third, and fourth parts correspond to the volume, book, section, and element, etc., in
Offer's proposal.
3.0 PROPOSAL CONTENT AND VOLUMES
Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below. The table below supersedes the copies requested in Block 9 of the Standard
Form (SF) 33.All volumes of the original proposal shall be delivered to the address provided in
Section 4.0 prior to the closing date/time stated in this solicitation Page limitations for each volume if any, are also specified in the table below; title and table of contents pages do not count towards page limit.
Information submitted as an Annex to the proposal includes manuals, specifications, plans, procedures, and policies that exist as an official document of the company or facility, as well as other information requested in Part B Specific Instructions. Page limitations for Annexes, if any, are specified below. The authorized Annexes are summarized in the table below. Proposal pages beyond the specified maximum limit will not be reviewed as part of the evaluation. Offerors are strongly encouraged to use tabs and dividers within volumes in order to facilitate ease of review.
Volume
Number
Volume Title Required Page Limit Copies Required
1 EXECUTIVE SUMMARY No Page Limit 1
Original/3Copies/2
CDs
2 TECHNICAL
1) Understanding of the
Work
2) Workforce
50 pages (total for all Sample Tasks)
Resume no more than 2 pages.
Original/3Copies/2
CDs
3) Management Plan 20 Pages
3 PAST PERFORMANCE No page limit 1 Original/3
Copies/2 CDs
4 PRICE/COST No page limit 1 Original/3 copies/2 CDs
5 EXCEPTIONS, DEVIATIONS 10 pages 1 Original/3
Copies/2
AND WAIVERS
Each volume shall contain the following information:
- Cover and title page
- Title of proposal and proposal number as applicable
- Offeror's name, address and POC
- RFP number
- Proposal volume/book number
- Copy number
- Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)
- Use tabs and dividers
The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators' review of the Offeror's proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information. The Offeror's CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.
EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)
Section L
– Proposal
Instructions Government SOW
Section M –
Evaluation
Factor
Offeror's Proposal
Reference
CLIN
Reference
Volume 2
Technical
Example: Para 3.1
Note: This column shall address all paragraphs in Sections xx and xy of the
Performance
Specification
2.A Provide reference to
Offeror's Proposal
Volume I – Technical.
Example: Refer to appropriate page number in Offeror's written proposal
Section L
– Proposal
Instructions Government SOW
Section M –
Evaluation
Factor
Offeror's Proposal
Reference
CLIN
Reference
4.0 PROPOSAL SUBMISSION:
Clearly mark all packages with the solicitation number. The submission date for all Volumes shall be no later than the date and time specified in Block 9 of Standard Form 33 of the RFP.
However please submit Volume 3 Past Performance information [7] days prior to the submission date specified in Block 9 of Standard Form 33 of the RFP.
The Offeror shall submit proposals via United States Postal Service or through a commercial carrier using the address provided below. The Offeror shall not submit proposals by facsimile or electronically via email.
Naval Air Systems Command
Code: AIR-2.5.1.14.6 (May Dimitrov)
Address 21983 Bundy Road, Bldg 441
Patuxent River, MD 20670
Solicitation Number: N00421-15-R-0052
Hand carried proposals may be delivered to the address above, Contact May Dimitrov at 301-
757-6531 to obtain delivery directions.
5.0 PROPOSAL PACKAGING:
The Offeror shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Each container shall be single person portable. One container shall include all Original Proposal volumes including the original/signed documents submitted as part of Volume 1 Executive
Summary.
Each box should include a packing slip detailing the contents to include the volume number, title, and copy number. Also, each box should be stamped or marked “For Official Use Only” and “Source Selection Information - See FAR-2.101 and 3.104”.
6.0 CLASSIFIED DATA
All proposals must be UNCLASSIFIED
7.0 SOLICITATION CHANGES
For any changes and additional information provided by the Government for the solicitation please go to https://www.fbo.gov/ or http://www.navair.navy.mil/doing_business/open_solicitations/ https://www.fbo.gov/ http://www.navair.navy.mil/doing_business/open_solicitations/
PART B SPECIFIC INSTRUCTIONS
1.0 VOLUME 1: EXECUTIVE SUMMARY
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The purpose of the Executive Summary is to provide the evaluators with an overview of the
Offeror's proposal and strategy. The Offeror shall include the following in this volume:
i. A concise abstract of the Offeror's strategy for each of the evaluation criteria contained in the solicitation.
ii. Offeror Summary Table: The Offeror shall complete the table below. The Offeror shall include all subcontractors and team members who will be involved with the performance or management of the contract and list all sites where the work will be performed. If a teaming or subcontracting arrangement is proposed, identify the work share, distribution elements, and ratios that each contractor will perform using the table below. Also provide a definition of the legal relationship between the entities if it is other than a Prime/subcontractor relationship.
Contractor Name
(Indicate Prime, Team
Member or Sub)
Place of
Performance/DUNS # if applicable
Brief Work
Description and/or
Program
Responsibility
% of Total
Proposed Price
iii. Signed SF33 for basic solicitation and acknowledgment of each amendment, including completion of any RFP clause or provision that requires a fill-in or response.
iv. Signed Representations, Certifications and Acknowledgements or OnLine Representations and Certifications Application (ORCA) reference.
v. Affirmation of no Exceptions, Deviations or Waivers if Volume 5.0 is not being submitted as part of the proposal.
vi. Guarantee the length of proposal validity (for at least [180] days after proposal submission).
vii. Written con sent from principal subcontractors and critical team members that will allow the
Government to coordinate potential past performance and/or cost/price issues with the Offeror.
2.0 VOLUME 2: TECHNICAL
Note: This volume shall not contain any reference to cost or price aspects of the offer.
The Offeror shall provide all information and data required to conduct a thorough and complete technical evaluation.
The Offeror shall address the following in the proposal:
- Understanding of the Work
- Workforce/Personnel Qualifications/Key Personnel
- Management Plan
2.1. Understanding of the Work
The offeror shall provide written responses to the sample tasks provided below that closely represent typical work efforts encountered by AIR-6.7. Discussing examples of previously completed products in the course of responding to Sample Tasks 1, 2, and 3 below is acceptable.
The response, however, must directly address the prompts and not exceed the page limitation stated at Section L, Part A, Paragraph 3.0.
Sample Task 1—Maintenance Task Analysis (MTA) The following scenario applies: Two years after Initial Operational Capability (IOC), the Product Support Manager (PSM) in an aircraft
Program Office has decided to address top Fleet readiness degraders by changing the maintenance concept from two-level (O-D) to three-level (O-I-D) for the aircraft’s advanced
RADAR sub-system. The PSM requested your help getting the MTA effort scoped-out and started. The RADAR sub-system has five Weapon Replaceable Assemblies (WRAs) (Receiver, Transmitter, Processor, Antenna, and Equipment Rack). The PSM is considering an increase in on-aircraft maintainability (O-Level tasks), as well as, establishment of I-Level capability.
Using applicable Government and non-governmental standards and handbooks, provide the PSM with a detailed description of the work effort and your approach for this critical program tasking.
Use the following process framework to structure your response: Inputs (specific data needed to complete the MTAs and potential data sources), Outputs (specific data produced by the analysis and where the data is stored), Controls (what specific consideration may be barriers or enablers for this work effort, how will the work be managed, what specific metrics are suggested for tracking the tasking, what guidance was used to formulate your plan), and Resources (skill-set, tools, and labor hours associated with completing a typical MTA effort of this nature).
Sample Task 2—Level of Repair Analysis (LORA) The following scenario applies: Two years after Initial Operational Capability (IOC), the Product Support Manager (PSM) in an aircraft
Program Office has decided to address top Fleet readiness degraders by changing the maintenance concept from two-level (O-D) to three-level (O-I-D) for the aircraft’s advanced
RADAR sub-system. The PSM requested your help getting the LORA effort scoped-out and started. The RADAR sub-system has five WRAs (Receiver, Transmitter, Processor, Antenna, and Equipment Rack). The PSM is considering an increase in on-aircraft maintainability (O-
Level tasks), as well as establishment of I-Level capability. Operation and Support (O&S) Cost reduction is a focus-area for the PSM, so he must choose the best mix of maintenance capability
(O-I-D Level) to provide best value for all stakeholders. Using applicable Government and non-governmental standards and handbooks, provide the PSM with a detailed description of the work effort and your approach for this critical program tasking. Use the following process framework to structure your response: Inputs (specific data needed to complete the component LORAs and potential data sources), Outputs (specific data produced by the analysis and where the data is stored), Controls (what specific consideration may be barriers or enablers for this work effort, how will the work be managed, what specific metrics are suggested for tracking the tasking, what guidance was used to formulate your plan), and Resources (skill-set, tools, and labor hours associated with completing a typical LORA effort of this nature).
Sample Task 3 - Navy Training System Plan (NTSP) development process. The following scenario applies: Two years after IOC, the PSM changed the maintenance concept from two-level (O-D) to three-level (O-I-D) for the aircraft’s advanced RADAR sub-system. The PSM requested your help in updating the existing NTSP. The latest Approved NTSP for the RADAR sub-system is dated January 2012. The RADAR sub-system has five WRAs (Receiver, Transmitter, Processor, Antenna, and Equipment Rack). The intermediate level tasking consists of fault isolation and repair to the component level by using automated test equipment. A new maintenance training course has been developed that will award Navy Enlisted Classification code 66XX upon completion. Using applicable Government standards, tools, and handbooks, provide the PSM with a detailed description of the work effort and your approach for this critical program tasking. Use the following process framework to structure your response: Inputs
(specific data needed to complete NTSP and potential data sources), Outputs (specific data produced by the analysis and where the data is stored), Controls (what specific consideration may be barriers or enablers for this work effort, how will the work be managed, what specific metrics are suggested for tracking the tasking, what guidance was used to formulate your plan), and Resources (skill-set and labor hours associated with completing a typical NTSP of this nature).
2.2. Workforce
2.2.1 Key Personnel Resumes
Key Labor Categories. The Offeror shall submit a list of proposed candidates for the designated key labor categories.
(a) For any proposed Key Personnel provide a resume of the work assignments, training, etc., that demonstrates the experience and specialized qualifications of each key person proposed.
Resumes shall contain, at a minimum, the following information:
(i) Employee name
(ii) Years of employment experience in chronological order including narrative description of duties and responsibilities
(iii) Current position, title, and employer
(iv) Educational history
(v) Institution name, degree or certification earned, and year for all degrees or certifications earned
(b) The Government may check educational background to verify degrees or certifications received.
All contingent key personnel hires shall have a letter of intent submitted under Volume 4.0. The letter of intent is a separate written agreement signed by the potential employee(s) to work for the offeror effective at contract award. Subcontractors and team members either shall provide this information separately or include it in the prime contractor’s submission of this document.
All proposed personnel shall meet the minimum labor category qualifications in Section C
Statement of Work.
(c) Key Personnel Update Requirement
Offerors are obligated to advise the Government of changes in proposed key personnel staffing, even after submission of proposals.
(d) Key Personnel Substitution Requirements
If an Offeror proposes substitute personnel in the option years, NAVAIR Clause 5252.237-9501 will apply for evaluation purposes.
2.3 Management Plan:
2.3.1 The offeror is required to submit a Management Plan that outlines both day-to-day and long-term organizational operation activities. These activities must include standard methods for managing the accomplishment of the work of the organization, (i.e., planning, controlling, resourcing), handling financial activities, and teaming with qualified partners and subcontractors.
The Management Plan should clearly state roles and responsibilities of members of the organization.
2.3.2 The Management Plan shall include a written narrative delineating a transition plan that ensures a smooth workplace changeover (without interruption) from an incumbent with no loss of service and minimal loss of corporate knowledge. The plan must address Work
Turnover/Data Transfer and Risk Mitigation strategies.
2.3.3 Qualification/Recruitment/Retention - Offerors shall present in sufficient detail their qualification/recruitment/retention procedures that would provide workforce improvements and upgrade the skills of highly trained and motivated personnel. For personnel who are not current or contingent hires, offerors shall describe their plan for hiring qualified personnel.
3.0 VOLUME 3: PAST PERFORMANCE
3.1 General
There is no sepreate narritive require for this volume. The Volume 3 past performance shall inclulde Attachment P4, Attachment P5, and written consent as detail in para 3.1.3.
3.1.1 The Offeror shall identify on the Past Performance Matrix (Attachment P4) at least five (5) summaries of past performance performed within five years of the RFP release date which contains efforts similar to those performed by the Offeror, the Offeror's principal subcontractors, and the Offeror's team members in solicitation. E.g., tasks, complexity, contract type, contract dollar value, etc. Offerors shall not reference an Indefinite Delivery/Indefinite Quantity contract without referencing the appropriate task orders containing the effort similar in nature to this requirement. Commercial contracts may be included. When possible, the Past Performance
Matrix should include at least three contracts for the prime contractor.
3.1.2 For all contracts identified which do not have CPARS Reports, the Offeror will forward a copy of the Past Performance Questionnaire (Attachment P5) to that contract customer's
Contracting Officer Representative (COR) or Technical Point of Contact (TPOC). All questionnaires shall be forwarded within two weeks from the RFP release date with enough lead-time so that responses can be received by the Government concurrently with the Government's receipt of the Offeror's Past Performance information submitted as per paragraph 4.0. The
Offeror shall include submittal instructions for the customers to send completed questionnaires within two weeks of its receipt. This submittal information is provided at the top of the questionnaires to facilitate the Offeror's effort in meeting these instructions. The Offeror shall not conduct follow-up actions with regard to this questionnaire. The Government may send any other questionnaires as necessary.
3.1.3 The Offeror shall provide written consent from their principal subcontractors and team members that will allow the Government to coordinate their Past Performance issue(s) with the
Offeror. If the Offeror does not submit such written consent, then the Government will address any past performance issues directly with the principal subcontractor or team member and the
Offeror will forfeit the opportunity to participate in any related discussions. Consequently, for any principal subcontractors and team members that do not provide such written consent, provide a point of contact (name, address, phone number, and email address) with whom the Government may coordinate these issues and obtain any responses as needed.
3.1.4 The Government may use information other than that provided by the Offeror in their proposals to evaluate past performance. The Government may use Past Performance information obtained from sources other than those identified by the Offeror. The Government has no duty to search for data to cure the problems it finds in the information provided by the Offeror. The
Offeror has the burden of providing thorough and complete past performance information.
4.0 VOLUME 4: PRICE/COST PROPOSAL
4.1 Volume Content:
(a) This Volume shall contain the information requested below and shall include a copy of
Section B with the Contract Line Item (CLIN) Unit Prices and for evaluation purposes, the Total
Prices filled in (Supplies and/or Services and Prices and/or Costs) using the estimated quantities value in the solicitation and the instructions below. Section B prices shall be provided in one digital data copy in MS Office 2010 Excel format or Adobe PDF on CD-ROM media. Offerors shall submit their cost/price proposal utilizing the CLIN Breakout Spreadsheet (Attachment P6).
The offeror shall submit a fully completed Attachment P6. The Attachment P6 spreadsheet shall be formatted on letter size (8.5 X 11) paper. The proposal shall be unprotected and unlocked, with formulae intact to show mathematical operations.
(b) All price/cost and price/cost supporting information shall be contained in section B and the price/cost proposal. No price or pricing information shall be included in any other technical volume including cover letters. Offerors are responsible for submitting sufficient information to enable the Government to fully evaluate their price/cost proposal.
4.2 Ground Rules and Assumptions:
4.2.1 As this is a competitive acquisition with adequate price competition anticipated, any price/cost documentation requested shall not be certified cost or pricing data in accordance with
FAR 15.403-1. However, in the event that adequate price competition does not exist after receipt of proposals, the Government reserves the right to request additional cost or pricing data as necessary from both the Offeror and subcontractors and may conduct negotiations with the
Offeror, pursuant to FAR Part 15.403-4, in order to ensure a reasonable and realistic price/cost.
Further, the Offeror may be required to provide a Certificate of Current Cost or Pricing Data prior to award, pursuant to FAR 15.406-2. Offeror shall acknowledge the requirement to provide additional cost or pricing information and certify the data prior to award if/when requested by the
Government.
4.2.2 The cost of general purpose items required to conduct normal business operations will not be considered allowable Other Direct Charges. The following types of general purpose costs required to conduct normal business operations are not directly reimbursable: the cost and associated costs for telephones and telephone charges (except for project-related telephone charges for performance of this contract which, per Contractor's DCAA-approved accounting system, may be directly reimbursed under communication expenses), modems, typewriters, reproduction machines, word processing equipment, personal computers, computer software, Internet access charges, facsimile machines, commercial carrier charges, pagers, and other general purpose office equipment and office supplies.
4.2.3 The Offeror shall provide sufficient information to support its price/cost as well as an explanation of all ground rules and assumptions that affect the price/cost estimates. Any apparent imbalances in the pricing, high or low proposed prices/costs as compared to historical data, or any other anomalies should be fully explained. Topics to be addressed include, but are not limited to, investments, programmatic variables (e.g., inflation/escalation, location, make/buy decisions, prime/subcontractor relationships, and business base concerns), etc.
4.3 Price/Cost Information:
4.3.1 Reasonableness and Consistency between the Technical and Price/Cost Volumes.
Demonstrate that the unit prices and the total proposed price/cost are reasonable, realistic, and commensurate with the work required by the solicitation and the technical and management approaches identified in the Technical Volume of the proposal.
4.3.2 The Government is not soliciting any investments. However, in order for the Government to properly assess a proposed price/cost that appears low due to a corporate decision to absorb costs, e.g., lower than usual burdens or rates, the Offeror shall fully identify and explain any such investments.
4.3.3 Provide a narrative that addresses any assumptions made during the preparation of the cost/price proposal and discuss the basis for the cost elements below listed:
4.3.3.1 Direct labor rates by category. The offeror and proposed subcontractors are required to submit labor rates for proposed individuals. The offeror and proposed subcontractors shall provide payroll verification for currently employed proposed personnel and contingent offer letters outlining salary information for contingent hires. Verification of direct labor rates shall be provided for current employees; this could consist of, for example, screen-captures (or equivalent) from the offeror’s payroll system or a form containing the title, direct labor rate and a signed certification by an authorized representative of the company. Offerors retain discretion with respect to the documentation provided to substantiate the direct labor rates of current employees; however, the Government must be able to calculate the employee’s current hourly rate based on the information provided. If any of the rates utilized by the offeror or any subcontractors differ from the payroll verification, a justification shall be provided for the difference. For any prospective hires, provide information to substantiate the rates proposed. If composite or category averages are proposed, provide a breakdown of how rates are developed.
4.3.3.2 Indirect costs (i.e. Overhead, Fringe Benefits, General and Administrative (G&A), etc.), including a description of pools to which indirect rates are applied. If available, the offeror and proposed subcontractors shall provide the most current DCAA Provisional Billing Rate Approval
Letter, DCAA Final Billing Rate Approval Letter, and/or DCAA Forward Pricing Rate
Agreement or Recommendation (FPRA/FPRR). If DCAA has not reviewed the rate information for an offeror or one of its subcontractors, the offeror shall submit a detailed justification of the proposed indirect rates, including details regarding the basis of estimate that may be helpful to the Government in conducting cost realism analysis. If any of the rates utilized by the offeror or any subcontractors differ from the DCAA information, a justification shall be provided for the difference, including any supporting cost data (i.e., budget information). Finally, prime contractors and all subcontractors shall provide the last three (3) years of actual / incurred indirect rate information, as well as three (3) years of DCAA approved historical provisional billing rate information
4.3.3.3 Escalation on labor. Offerors, including subcontractors, shall address escalation for all labor categories, and shall provide rationale for the specific escalation rate used. Offerors that do not include escalation, or an explanation as to why it was not included, may be considered unrealistically low and may have their proposals adjusted upwards by the Government for cost realism purposes.
4.3.3.4 Profit/Fee: The offeror and subcontractors shall identify profit/fee rates and total amounts proposed and identify the various cost elements to which the profit/fee is being applied.
Profit/fee, rates, as applicable in Section B, shall be clearly distinguishable. Profit/Fee shall not be applied to ODCs.
4.3.3.5 Other Direct Costs (ODCs) by specific cost element (i.e. Travel, and Material) Offerors shall utilize the Not-To-Exceed (NTE) amounts provided by the Government in Section L-2, paragraph 1.0 for ODC CLINs. If it is the contractor’s accounting practice to apply (and invoice for) burdens to ODCs, then the contractor shall propose the ODC NTE amount plus the applicable burdens.
4.3.4 The Offeror shall provide a schedule which contains the proposed burden rates by year for material, direct labor overhead, General and Administrative expense, fee/profit and any other applicable burden applied to direct cost elements. The Offeror shall also state the number of hours used in determining an employee work year.
4.3.5 RESERVED
4.3.6 Regardless of the type of CLINs (e.g., CPFF, CPIF, CPAF or FFP) under the solicitation, the Offeror shall fully disclose the buildup of cost/price of each CLIN.
4.3.7 When completing the CLIN Breakout Spreadsheet (Attachment P6), the Offeror shall not utilize any fully burdened hourly rates when pricing the labor of its employees.
4.3.8 If a subcontractor of the Offeror utilizes fully burdened rates in its proposal to the Offeror, the subcontractor shall provide its own CLIN Breakout Spreadsheet (Attachment P6), delineating the buildup of those rates to the Government.
4.3.9 As this requirement contains cost type CLINs, the offeror shall also provide documentation verifying that it has a DCAA approved Cost Accounting System or state that its Cost Accounting
System has not been approved by DCAA, pursuant to the requirement at FAR 16.301-3(a)(3). It is the prime contractor’s responsibility to ensure that each subcontractor with a proposed cost-reimbursement subcontract type has an adequate accounting system. If a subcontractor does not have an adequate accounting system, they should be priced on a Firm-Fixed-Price (FFP) or
Time-and-Materials (T&M) basis. The prime contractor shall provide a list of all subcontractors by name and shall specify the type of subcontract (i.e., CPFF, FFP, T&M, etc.). For those subcontractors who will be priced on a cost-type basis, documentation verifying possession of a
DCAA approved Cost Accounting System shall be provided.
4.3.10 If the contractor requires the use of consultants in its proposal, the consultant cost shall be captured under the appropriate labor CLIN not the ODCs CLIN. The proposed consultants are required to submit their cost/price proposal. The cost/price proposal shall be unprotected and unlocked, with formulae intact to show mathematical operations.
4.3.11 The Offeror shall provide a professional employee compensation plan setting forth salaries and fringe benefits proposed for the professional employees who will work under the contract in accordance with FAR 22.1103 and FAR 52.222-46.
4.3.12 The offeror shall complete and submit Attachment P7, detailing the fully burdened labor rates for all prime contractor and subcontractor personnel. For subcontractor labor, the fully burdened labor rates shall be inclusive of any pass-through charges (i.e., subcontractor handling, fixed fee on subcontractor labor, etc.) applied by the prime contractor.
4.4 Limitation on Subcontracting:
4.4.1 This requirement is being set-aside for the small business. Provide a breakout to demonstrate how the prime contractor will perform at least 50% of the cost of the contract incurred for personnel with its own employees for each period of performance in accordance with FAR clause 52.219-14. Cost of contract incurred for personnel includes direct labor cost, overhead that has only direct labor as its base, and the small business's General and
Administrative (G&A) rate multiplied by the labor cost.
4.5 Use of Government Furnished Property:
If the Offeror proposes/requires the use of Government Furnished Equipment (GFE) or
Government Furnished Information (GFI), then the Offeror shall provide:
- A complete description of the required GFE/GFI including part number and serial number, if applicable.
- Where the GFE/GFI is to be located.
- The name, organization, complete address and telephone number of a cognizant Government point of contact.
- In the case of GFE/GFI accountable to other Government contracts, a copy of the correspondence authorizing use of such GFE/GFI on this contract.
- The monetary impact to the Offeror's proposal if the proposed GFE/GFI is not provided as
GFE/GFI.
If no GFE/GFI/GFP is required, the Offeror shall so state.
4.6 Other Costs
The Offeror shall identify additional costs that would be incurred that has not been identified in the solicitation and describe in detail the performance that would cause these costs. Also, describe any assumptions with regard to Government actions (e.g., providing resources whether it be equipment or people) that enabled the proposed price/cost to be lower and identify the amount by which it is lower.
5.0 VOLUME 5: EXCEPTIONS, DEVIATIONS AND WAIVERS
In this Volume, the Offeror must certify that it contains all exceptions, deviations, and waivers that the Offeror takes from the provisions of the solicitation and its applicable documents. An
“exception” is where an Offeror states it will not comply with a requirement, usually involving contract terms and conditions. A “deviation” is where an Offeror states it will not comply with a requirement but proposes an alternative to meet the intent of the requirement, usually involving a specification. A “waiver” is where an Offeror requests authorization for the Government to accept an item, which will depart from specified requirements, but would nevertheless be considered suitable. Exceptions, deviations, and requests for waivers may cause proposals to be considered deficient. An assumption or condition shall not be considered an exception, deviation, or request for waiver as defined herein.
Provide a detailed description for each exception, deviation, or request for waiver, as applicable.
The Offeror shall indicate the Offeror’s difficulty with the applicable requirement and the
Offeror’s proposed solution. The Offeror shall specifically identify the portion of the solicitation and the Offeror’s proposal, which are affected. If there are no exceptions, deviations or waivers, the Offeror is permitted to state this in Volume 1, rather than providing a separate document as
Volume 5.
L-2 Government Furnished Information
1.0 ODCs
The Offeror shall propose costs/prices for the ODC CLINs. If it is the offeror's accounting practice to apply (and invoice for) burdens with regards to ODCs, then the offeror shall propose the ODC amount plus the addition of the applicable burdens. If the offeror chooses not to burden
ODCs then the contractor shall propose an H-clause to identify this special team and condition.
(NO FEE SHALL BE APPLIED TO ODCs).
The Government's estimate for travel and Material for the prime and all subcontract efforts, unburdened is listed below. The offeror shall propose the ODCs, as outlined below.
2.0 Labor Hours
The Government estimate is 875,520 hours for the entire work effort. A work-year is defined as
1920 hours exclusive of holidays and leave. The offeror shall propose the labor hours per labor category, as outlined below.
YEAR I Travel (CLIN 0008) Material (CLIN 0015)
TOTAL $1,530,510.00 $9,317.60
YEAR II Travel (CLIN 0008) Material (CLIN 0015)
TOTAL $1,530,510.00 $9,317.60
YEAR III Travel (CLIN 0008) Material (CLIN 0015)
TOTAL $1,530,510.00 $9,317.60
YEAR IV Travel (CLIN 0008) Material (CLIN 0015)
TOTAL $1,530,510.00 $9,317.60
YEAR V Travel (CLIN 0008) Material (CLIN 0015)
TOTAL $1,530,510.00 $9,317.60
YEAR I
Labor Category Total
Acquisition/Operations Logistics
Manager/Onsite Lead, Senior* (Cont.
Site) 7392
Acquisition/Operations Logistics
Manager/Onsite Lead, Senior
*(Gov.Site) 6048
Acquisition Logistics Manager (Cont.
Site) 10560
Acquisition Logistics Manager (Gov.
Site) 8640
Operations Logistics Manager, Senior
(Cont. Site) 4800
Operations Logistics Manager, Senior
(Gov. Site) 4800
Logistics Manager, Senior* (Cont. Site) 10560
Logistics Manager, Senior* (Gov. Site) 8640
Logistician II (Cont. Site) 11520
Logistician II (Gov. Site) 34560
Logistics Analyst, Senior *(Cont. Site) 4992
Logistics Analyst, Senior* (Gov. Site) 16128
Logistics Analyst (Cont. Site) 10560
Logistics Analyst (Gov. Site) 8640
Logistics Engineer, Senior *(Cont. Site) 1536
Logistics Engineer, Senior* (Gov. Site) 4608
Computer Operator I (Gov. Site) 4224
Program Manager,Senior* (Cont. Site) 1152
Program Manager,Senior* (Gov. Site) 1920
Administrator, Associate (Cont. Site) 5760
Administrator, Associate (Gov. Site) 5760
Administrative Assistant (Cont. Site) 2304
Total 175104
YEAR II
Manager/Onsite Lead, Senior* (Cont. 7392
Site)
Manager/Onsite Lead, Senior
*(Gov.Site) 6048
Acquisition Logistics Manager (Cont.
Site) 10560
Acquisition Logistics Manager (Gov.
Site) 8640
Operations Logistics Manager, Senior
(Cont. Site) 4800
Operations Logistics Manager, Senior
(Gov. Site) 4800
Logistics Manager, Senior* (Cont. Site) 10560
Logistics Manager, Senior* (Gov. Site) 8640
Logistician II (Cont. Site) 11520
Logistician II (Gov. Site) 34560
Logistics Analyst, Senior *(Cont. Site) 4992
Logistics Analyst, Senior* (Gov. Site) 16128
Logistics Analyst (Cont. Site) 10560
Logistics Analyst (Gov. Site) 8640
Logistics Engineer, Senior *(Cont. Site) 1536
Logistics Engineer, Senior* (Gov. Site) 4608
Computer Operator I (Gov. Site) 4224
Program Manager,Senior* (Cont. Site) 1152
Program Manager,Senior* (Gov. Site) 1920
Administrator, Associate (Cont. Site) 5760
Administrator, Associate (Gov. Site) 5760
YEAR III
Site) 7392
Acquisition/Operations Logistics
Manager/Onsite Lead, Senior
*(Gov.Site) 6048
Acquisition Logistics Manager (Cont.
Site) 10560
Acquisition Logistics Manager (Gov.
Site) 8640
Operations Logistics Manager, Senior
(Cont. Site) 4800
Operations Logistics Manager, Senior
(Gov. Site) 4800
Logistics Manager, Senior* (Cont. Site) 10560
Logistics Manager, Senior* (Gov. Site) 8640
Logistician II (Cont. Site) 11520
Logistician II (Gov. Site) 34560
Logistics Analyst, Senior *(Cont. Site) 4992
Logistics Analyst, Senior* (Gov. Site) 16128
Logistics Analyst (Cont. Site) 10560
Logistics Analyst (Gov. Site) 8640
Logistics Engineer, Senior *(Cont. Site) 1536
Logistics Engineer, Senior* (Gov. Site) 4608
Computer Operator I (Gov. Site) 4224
Program Manager,Senior* (Cont. Site) 1152
Program Manager,Senior* (Gov. Site) 1920
Administrator, Associate (Cont. Site) 5760
Administrator, Associate (Gov. Site) 5760
YEAR IV
Site) 7392
Acquisition/Operations Logistics
Manager/Onsite Lead, Senior
*(Gov.Site) 6048
Acquisition Logistics Manager (Cont.
Site) 10560
Acquisition Logistics Manager (Gov.
Site) 8640
Operations Logistics Manager, Senior
(Cont. Site) 4800
Operations Logistics Manager, Senior
(Gov. Site) 4800
Logistics Manager, Senior* (Cont. Site) 10560
Logistics Manager, Senior* (Gov. Site) 8640
Logistician II (Cont. Site) 11520
Logistician II (Gov. Site) 34560
Logistics Analyst, Senior *(Cont. Site) 4992
Logistics Analyst, Senior* (Gov. Site) 16128
Logistics Analyst (Cont. Site) 10560
Logistics Analyst (Gov. Site) 8640
Logistics Engineer, Senior *(Cont. Site) 1536
Logistics Engineer, Senior* (Gov. Site) 4608
Computer Operator I (Gov. Site) 4224
Program Manager,Senior* (Cont. Site) 1152
Program Manager,Senior* (Gov. Site) 1920
Administrator, Associate (Cont. Site) 5760
Administrator, Associate (Gov. Site) 5760
YEAR V
Site) 7392
Acquisition/Operations Logistics
Manager/Onsite Lead, Senior
*(Gov.Site) 6048
Acquisition Logistics Manager (Cont.
Site) 10560
Acquisition Logistics Manager (Gov.
Site) 8640
Operations Logistics Manager, Senior
(Cont. Site) 4800
Operations Logistics Manager, Senior
(Gov. Site) 4800
Logistics Manager, Senior* (Cont. Site) 10560
Logistics Manager, Senior* (Gov. Site) 8640
Logistician II (Cont. Site) 11520
Logistician II (Gov. Site) 34560
Logistics Analyst, Senior *(Cont. Site) 4992
Logistics Analyst, Senior* (Gov. Site) 16128
Logistics Analyst (Cont. Site) 10560
Logistics Analyst (Gov. Site) 8640
Logistics Engineer, Senior *(Cont. Site) 1536
Logistics Engineer, Senior* (Gov. Site) 4608
Computer Operator I (Gov. Site) 4224
Program Manager,Senior* (Cont. Site) 1152
Program Manager,Senior* (Gov. Site) 1920
Administrator, Associate (Cont. Site) 5760
Administrator, Associate (Gov. Site) 5760
3.0 Incumbent Information
The incumbent contractors are:
TEAM LOGISTICS JOINT VENTURE
12015 LEE JACKSON HIGHWAY
FAIRFAX VA 22033-3300
4.0 Place of Performance
The place of performance for this effort is Patuxent River, MD 20670. The percentage break down of total effort is 57% (Government site) and 43% (Contractor Site).
SECTION M - EVALUATION FACTORS FOR AWARD
The following have been modified:
MA - (1) EVALUATION FACTORS FOR AWARD (SERVICES) (MAR 2013)
PART A: GENERAL INFORMATION
1.0 GENERAL
The Government expects to select one Offeror on the basis of its proposal providing the “best value” to the Government, all factors considered.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .