EXHIBIT_A_CDRLs.pdf
PDF 259 KB Posted
- Attached to
- 4. 11. 2 Combat Integration & Identifications Systems (CI&IDS) Division - Systems Engineering & Technical Services Federal contract opportunity
- Solicitation number
- N00421-15-R-0036
About this file
CDRLs
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTS DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
8. APP CODE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE
N/A Reg Repro
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 0 1 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 15
1007/183
ASREQ
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Systems Engineering
Technical Report - Study Service
SOW para 3.1, 3.3, 3.4, 3.8, 3.9, 3.14
A
Technical Report- Study Service
NAWCAD 4.11.2NAWCAD St. Inigoes Format
Reports shall include any issues or possible recommendations identified during analysis or review of program plans, acquisition strategies, acquisition documentation materials, other documentation, as well as IFF equipment and systems.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
Building 8164
St. Inigoes MD 20684-4012
Draft
D
LT
ASREQ ASREQ
b. COPIES
11. AS OF DATE Final
ASREQ
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report Technology Assessment
DI-MISC-80711A SOW Para 3.1-3.3, 3.5, 3.8 #REF!
LT
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
ASREQ ASREQ
Reports shall include any assessments of new or existing technologies, systems, or documentation and provide recommendations of performance, applicability, interoperability, and conformance to requirements.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
Building 8164
St. Inigoes MD 20684-4012
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report
Test Plans & Procedures, Integration
Plans and Installation Procedures
DI-SESS-81704 SOW para 3.5, 3.7, 3.9, 3.10 NAWCAD 4.11.2
LT
See BLK 16 See BLK 16 b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 ASREQ
Plans and procedures shall be developed using the identified DID.
Blocks 10,11,12: Test plans and procedures, integration plans, and installation procedures shall be submitted to the Government ten (10) days before event.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report Test Report
Blk 16 SOW Para 3.5, 3.10
NAWCAD 4.11.2
LT
See BLK 16 See BLK 16 b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 ASREQ
Block 4: The following Data Acquisition Documents apply depending on the test phase:
DI-QCIC-80512 Installation Test Report; DI-IPSC-81440A Notice 1 Software Test Report;
and
MIL-HDBK-831A Preparation of Test Reports.
Blocks 10, 11, 12: The Contractor shall prepare a test report for each test and submit 30 calendar days after completion of each test event.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report Design Documentation
See BLK 16 SOW Para 3.5-3.7, 3.10, 3.12 NAWCAD 4.11.2
LT
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
ASREQ ASREQ
Block 4:
The following Data Acquisition Documents apply depending on the design phase
DI-IPSC-81427A NOT 1Software Development Plan
DI-IPSC-81428A NOT 1Software Installation Plan
DI-IPSC-81434A NOT 1 Interface Requirement Specifications
DI-IPSC-81438A NOT 1 Software Test Plan
DI-IPSC-81436A NOT 1 Interface Design Description.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 15
1007/183
0003 ASREQ
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Engineering Drawings
See Block 16 SOW 4.1.13, 4.5.2, 4.8.3.1.1 NAWCAD 4.11.2
LT
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
ASREQ ASREQ
The report shall include all engineering Drawings that have been created or modified.
Block 4: The following Data Acquisition Documents apply depending on the design phase or product:
DI-SESS-81000E Product Drawings
DI-SESS-81001E Conceptual Design Drawings
DI-SESS-81002F Developmental Design Drawings
DI-SESS-81003E Commercial Drawings
DI-SESS-81004E Special Inspection Equipment (SIE) Drawings
DI-SESS-81008E Special Tooling (ST) Drawings
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report Training Material
DI-MISC-80711A
SOW para. 3.12, 3.13
NAWCAD 4.11.2
LT
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
ASREQ ASREQ
Reports shall include all training materials, technical manuals, and completion reports.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________ Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A008
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Trip Report Trip Report
NAWCAD St. Inigoes Format SOW para 4.0 NAWCAD 4.11.2
LT
ASREQ Blk 16 b. COPIES
D 11. AS OF DATE
Draft
Final
Blk 16 Blk 16
Block 11, 12, 13: The contractor shall submit all travel not reported under any other data requirement within 10 working days of travel. Report shall indicate traveler’s name, dates of travel, activities visited, points of contact, accomplishments, action items, and problems encountered. Overtime authorized by Government task lead/COR IAW SOW paragraph
4.0.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1 1
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Engineering and Technical Services Report
DI-MGMT-80227 SOW para. 8.2.1 NAWCAD 4.11.2
LT
Monthly 45 DAC b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 See BLK 16
Block 11, 13: Reports shall address work progress on a task-by-task basis and are due within 15 calendar days after the end of each month.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Labor Mix Report
NAWCAD St. Inigoes Format SOW para. 8.2.2 NAWCAD 4.11.2
LT
Quarterly 15 days ARO b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 See BLK 16
Block 11, 13: The contractor shall submit Labor Mix reports consisting of employee list to show name, branch, labor category, clearance level, and, if applicable, the date of last
COMSEC briefing. The contractor shall include any Gains and Losses that have occurred within the last quarter in the Labor Mix Reports. The 1st report is due 10 calendar days after the first contract quarter and then the 10th of the month following each quarter thereafter.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Organizational Report
NAWCAD St. Inigoes Format SOW para. 8.2.3 NAWCAD 4.11.2
LT
Monthly 15 days ARO b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 See BLK 16
Block 11, 13: The contractor shall submit organizational reports within 15 calendar days after the end of each month.
Submittal shall be electronic and printable on one sheet not greater than legal sized. One page required for organization picture and subsequent page with employee list to show name, work location (building/office/cube), email and phone number.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Financial Progress Report
NAWCAD St. Inigoes Format SOW para. 8.2.4 NAWCAD 4.11.2
LT
Bi-Weekly 45 DAC b. COPIES
D 11. AS OF DATE
Draft
Final
See BLK 16 See BLK 16
Blocks 11-13: Report shall be in the Government specified format and cover the same period of performance as the Segregation of Costs and Invoice Report (CDRL A013). A
Government example will be provided. The contractor shall submit the first report 45 days after contract award, and within 15 days after the end of each month thereafter.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP__X_____ TM ________Other
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A013
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Segregation of Costs and Invoice Report
See BLK 16 SOW Para 8.2.5 NAWCAD 4.11.2
LT
Bi-Weekly See BLK 16 b. COPIES
D 11. AS OF DATE
Draft
Final
N/A See BLK 16
BLK 4 - Report format shall be IAW SOW paragraph 8.2.5
BLK 12 - To be submitted concurrently with 1st invoice.
BLK 13 - To be submitted concurrently with each invoice to the COR and shall be for the exact dollar amount and period of performance as the invoice.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 1
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 14
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Technical Report
Engineering Change Proposal (ECP) / Ship Change
Document (SCD)
DI-CMAN-80639C SOW Para 3.12.4 NAWCAD 4.11.2
DD
ASREQ ASREQ b. COPIES
D 11. AS OF DATE
Draft
Final
ASREQ ASREQ
The contractor shall submit ECPs and SCDs upon government approval of the contractor’s recommendation for field changes to reflect specific deficiencies.
Block 14:
Attn: Deliverables Manager
17472 Webster Field Rd
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP_________ TM ________Other X
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A015
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.2 2
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 15
1007/183
0003 A
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
IFF Sytems Engineering TBD
Operational Security (OPSEC) Plan
DI-MGMT-80934C SOW para. 5.3 NAWCAD 4.11.2
LT
One/R See BLK 16 b. COPIES
E See BLK 16 11. AS OF DATE
Draft
Final
See BLK 16 See BLK 16
Blocks 9, 11, 12, 13:
The contractor shall develop, implement, and maintain a facility level OPSEC program to protect classified and sensitive unclassified information to be used at the contractor facility during the performance of this contract, contract data requirements list (CDRL), and data item description (DID) attached. The OPSEC plan shall be submitted to NAWCAD 7.4.3.
within 90 days of contract award for acceptance and approval. While performing aboard
NAWCAD sites, the contractor shall comply with the provisions of NAWCADINST
3432.1A; at all other sites, the contractor shall comply with the local command and/or program OPSEC plan. Contractor employees shall complete local OPSEC and counterintelligence awareness training provided by NAWCAD security.
Block 14: Contractor shall mail draft OPSEC Plan to Commander Attn: 7.4.3. B463, Unit
10, 22514 McCoy Road, Patuxent River, MD 20670-1457.
Attn: Deliverables Manager
17472 Webster Field Rd
File details come from the government source that posted it. Updated .