About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to 4. 11. 2 Combat Integration & Identifications Systems (CI&IDS) Division - Systems Engineering & Technical Services, newest first.
File Type Posted
Question_and_Answer_1_June_2017.docx DOCX document
P4_-_CPAQ_Performance_Assessment_Questionnaire.docx DOCX document
P4_-_CPAQ_Performance_Assessment_Questionnaire.docx DOCX document
P3_-_Past_Performance_Information_Form_Mar_2017.pdf PDF
Questions_and_Answers_for_N00421-15-R-0036.docx DOCX document
Revised_RFP_N00421-15-R-0036.docx DOCX document
Past_Performance_Questionnaire_Package_for_Services.doc DOC document
Wage_Determination.txt TXT text file
EXHIBIT_A_CDRLs.pdf PDF
Copy_of_Attach_P1_Cost_Summary_Spreadsheet.xlsx XLSX spreadsheet
Attachment_P4_CPAQ.pdf PDF
Copy_of_Attachment_5_SGFE.xlsx XLSX spreadsheet
Final_RFP.docx DOCX document
Attachment_4_Data_Item_Xtmittal_Form.docx DOCX document
Attachment_3_OCI_List.docx DOCX document
Copy_of_Attachment_6_RGFE.xlsx XLSX spreadsheet
Copy_of_Attach_P2_Fully_burdened_Labor_Rates.xlsx XLSX spreadsheet
Draft_N00421-15-R-0036.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Surveillance Plan (CSP) For Systems Engineering Services for Combat Integration & Identification Friend or Foe (IFF) Systems

1. Purpose

This Contract Surveillance Plan (CSP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the Statement of Work (SOW) for systems engineering services for Identification Friend or Foe (IFF) Systems to include all Combat Identification (CID) and Air Traffic Control (ATC), including all Air Space Management, Aircraft Surveillance, Frequency Assignments (Radio Frequency Authorization's (RFA's), and Frequency Certifications (Certifications for Spectrum Support) efforts. The intent is to ensure that the Government receives the quality of services called for in the contract.

This contract requirement is to provide systems engineering services for Combat Integration & Identification Systems (CI&IDS) Division. The resulting vehicle will be a performance based, Single Award Indefinite Duration, Indefinite Quantity (IDIQ) contract. The contract will be for a base year with four option years. A properly executed CSP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this CSP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. Within a Quality Control Plan, the contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the order.

The CSP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the contract.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is NAVAIR 2.5.1.4. The ACO will be designated in the resulting task order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Alternate Contracting Officer’s Representative (ACOR) - An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting task order. The limitations of authority are contained in a written letter of appointment.

Contracting Officer’s Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the task order. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads – The COR designates an individual Government Project Lead to assist in administering a specific project under the contract

5. Responsibilities The following Government resources shall have responsibility for the implementation of this CSP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative (ACOR) – The ACOR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

Government Project Leads – The Government Project Lead is responsible for assisting in administering a specific project under the contract. A Government Project Lead cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS) – The market place for program management and engineering services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the end of each year of performance. This evaluation will be one determinant in exercising an option. The Government for this procurement will address the quality of product or service, schedule, cost control, business relations, management of key personnel, utilization of small business, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the contract, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the CSP.

b.CSP - The below listed methods of surveillance shall be used by the COR and Government Project Leads in the technical administration of this CSP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Contract Surveillance Plan provided herein.
7.Surveillance

Enclosures (1) and (2) set forth the performance standards, incentives, and surveillance methods for the contractor and Government Project Leads while enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.

8. Documentation In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9. Enclosures Enclosure (1) – Contract Surveillance Plan Enclosure (2) – Combat Integration & Identification Systems Performance Standards and Identification Systems Data Standards

Source Selection Information See FAR 3.104 and 2.101

CONTRACT SURVEILLANCE PLAN

All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.

Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or under run? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and TOM satisfaction.

Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

Quarterly Surveillance:

The COR will perform quarterly assessments of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed above.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Quality
Schedule
Cost Control
Business Relations
Mgmt.
SOW 3.1 Provide support research and analysis of COTS hardware and software products for incorporation into new systems. Such efforts shall include evaluating existing systems and equipment for possible improvement, as well as examining existing requirements for new systems and equipment.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.2 Investigate new technologies that show potential to improve the mission performance or capabilities of CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.3 Conduct research, analysis, and translation of operational mission requirements into qualitative and quantitative technical requirements.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.4 Investigate technical risks in assigned areas of CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts and perform risk-based cost/schedule/performance assessments of technical solutions to identify the most effective mitigation strategies to mitigate identified risks
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.5 Conduct component design engineering at the unit level on specific hardware and conduct system design engineering on new, developing or existing systems undergoing modifications
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.6 Maintain and upgrade system test beds and laboratories at NAWCAD, St. Inigoes
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.7 Monitor and perform tests, evaluations, and the preparation of test plans for specified CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.8 Perform interface engineering with CID and ATC components and combat systems, shipboard navigation systems, data fusion equipment, sensor correlation equipment, displays, tactical data systems, and datalink systems
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.9 Integrate individual units and equipment into full systems for Fleet introduction
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.10 Support installations at Government facilities, aboard ships and at various shore sites.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.11 Provide technical assistance in support of CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts directly impacting the battle readiness of Naval units.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.12 Provide technical inputs to the Government to develop life cycle documentation for CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.13 Provide formal Fleet training for CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts.
100% Inspection by COR, ACOR, or Government Technical POC
TBD
SOW 3.14 Provide project and program planning and tracking support for CID and ATC systems, including all Air Space Management, Aircraft Surveillance, Frequency Assignments (RFA’s), and Frequency Certifications (Certification for Spectrum Support) efforts.
100% Inspection by COR, ACOR, or Government Technical POC
TBD

A001 Analysis and Recommendation Reports

100% Inspection by COR, ACOR, or Government Technical POC
TBD
A002 Technology Assessment
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A003 Test Plans & Procedures, Integration Plans and Installation Procedures
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A004 Test Report
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A005 Design Documentation
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A006 Engineering Drawings
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A007 Training Material
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A008 Trip Report
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A009 Engineering and Technical Services Report
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A010 Labor Mix reports
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A011 Organizational Report
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A012 Financial Progress Report
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A013 Segregation of Costs and Invoice Requirements
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A014 Engineering Change Proposal (ECP) / Ship Change Document (SCD)
100% Inspection by COR, ACOR, or Government Technical POC
TBD
A015 Operational Security (OPSEC) Plan
100% Inspection by COR, ACOR, or Government Technical POC
TBD

Quarterly Summary of Ratings:

QualitySchedule
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____
Cost ControlBusiness Relations
Number of Exceptional____Number of Exceptional____
Number of Very Good____Number of Very Good____
Number of Satisfactory____Number of Satisfactory____
Number of Marginal____Number of Marginal____
Number of Unsatisfactory____Number of Unsatisfactory____
Management
Number of Exceptional____
Number of Very Good____
Number of Satisfactory____
Number of Marginal____
Number of Unsatisfactory____

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in table below. This annual assessment will occur at the end of each period and cover the previous 12 months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings

TBD

Schedule
Review of Quarterly Ratings
Cost Control
Review of Quarterly Ratings
Business Relations
Review of Quarterly Ratings

Management

Review of Quarterly Ratings

8 Enclosure (1) Source Selection Information See FAR 3.104 and 2.101

IDENTIFICATION SYSTEMS DATA STANDARDS

Description
Standard
AQL
Surveillance

Method/Measure

Technical Report Analysis and Recommendation Report
Submission is in accordance with the DID cited in the CDRL A001.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Technical Report Technology Assessment
Submission is in accordance with the DID cited in the CDRL A002.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Technical Report Test Plans & Procedures, Integration Plans and Installation Procedures
Submission is in accordance with the DID cited in the CDRL A003.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Technical Report Test Report
Submission is in accordance with the DID cited in the CDRL A004.
90% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Technical Report Design Documentation
Submission is in accordance with the DID cited in the CDRL A005.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Engineering Drawings
Submission is in accordance with the DID cited in the CDRL A006.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Technical Report Training Material
Submission is in accordance with the DID cited in the CDRL A007.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Trip Report
Submission is in accordance with the DID cited in the CDRL A008.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Engineering and Technical Services Report
Submission is in accordance with the DID cited in the CDRL A009.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Labor Mix Reports
Submission is in accordance with the DID cited in the CDRL A010.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Organizational Reports
Submission is in accordance with the DID cited in the CDRL A011.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Financial Progress Report
Submission is in accordance with the DID cited in the CDRL A012.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Segregation of Cost and Invoice
Submission is in accordance with the DID cited in the CDRL A013.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Engineering Change Proposal
Submission is in accordance with the DID cited in the CDRL A014.
90% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC
Operational Security (OPSEC) Plan
Submission is in accordance with the DID cited in the CDRL A015.
100% of required deliverable provided on time. No more than 1 report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, or Government Technical POC

Enclosure 1 10 Enclosure (2) Source Selection Information See FAR 3.104 and 2.101

File details come from the government source that posted it. Updated .