About this file
Exhibit A
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of. this collection of information, including suggestions for reducing the burden, tQ the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X030 A TOP TM OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
5.1.6 Air Vehicle N00421-15-R-0029 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 Contractor Flight and Ground Operations N/A
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A SOW Para. 3.1.2.5 NA WCAD, Code 51DOOMA, COR
7. DO 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD
REQUIRED
ANNLY Block 16 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A Block 16 suBMI~Y~ck 16 Draft Reg Repro
16. REMARKS GFR I
Blocks 11, 12 &13: Prior to the first flight and annually for review. Format: Paper with accompanying CD.
Contractor Provided Reference NA V AIRINST 3 71 0.1 G , Government Approved.
15. TOTAL 0 1 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 Requisition Status Report N/A
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A SOW Para. 3.2.8/3.3.5/3.5.1/3.5.3 NA WCAD, Code 51DOOMA, COR
7. DD 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
BI-WE Block I6 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A Block 16 SUBMIS~If<N k Draft oc I6 Reg Repro
16. REMARKS Competency Manager 1 Block 11, 12 & 13: Submit every other week. Format Electronically in
Government Furnished Format.
15. TOTAL 0 1 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 Project Status Report DOC Requirements, Problems or Deficiencies
4. AUTHORiTY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80368 SOW Para. 4.3 NA WCAD, Code 51DOOMA, COR
7. DO 250 REO 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
MTHLY Block I6 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
Block 16 SUBMI~r~ck 16 Draft Reg Repro
16. REMARKS COR 1
Block 11, 12 & 13: No Later Than the 15th day of the following month. Format Branch Head 1
Electronically in Government Furnished Format.
' 15.TOTAL 0 2 0
1. DATA ItEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 Funds Expenditure Report Monthly Funds Expended!Hours/NMCI
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE
N/A SOW Para. 4.4
7. DD 250 REO 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
LT
REQUIRED
MTHLY Block I6
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT
Block 16 SUBMISSI~N k
B oc 16
16. REMARKS
Block 11, 12 & 13: No Later Than the 15th day ofthefollowing month. Format
Electronically in Government Furnished Format.
G. PREPARED BY H. DATE I. APPROVED BY
""""~ ......... mttk..,.,..mi'IW!tl'101101- 09/01115 S1EINEREDWAR.DFRANCIS.I04281680Y-.IlH""":~'::..~:O~·"'"""N. IUCHARD.JULIA.M. 1247408726
,I :;T:.,. ... ,, .. .,-0<\10'
DD FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED.
6. REQUIRING OFFICE
NAWCAD, Code 51DOOMA, COR
14. DISTRIBUTION
a. ADDRESSEE
COR
15.TOTAL
J)jplaJiyfiFodb)'RJCliAJW.l!JUA.M.ll-!7<1087U
'=~~~.=O[l.-i(l,aMJfiN, Daol20L,,(I9.0l119:18'll-111'00'
b. COPIES
Final Draft
Reg Repro
I
0 I 0
J. DATE
9/1/2015
Page __ of __ Pages
Adobe Professional 8.0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT OAT A REQUIREMENTS LIST Form Approved OMB No. 0704-0188
The.public reporting burden for this collection of information is estimated tO average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate · (0704·0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Pleese do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
X030 A TOP TM OTHER
D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR
5.1.6 Air Vehicle N00421-15-R-0029 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A005 Detailed Invoices N/A
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
N/A SOW Para. 4.5 NA WCAD, Code 51DOOMA, COR
7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
MTHLY Block 16 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
Block 16 SUBMIS~Y~ck 16 Draft
Reg Repro
16. REMARKS COR 1
Block II, 12 & 13: No Later Than the 15th day of the following month.
15.TOTAL 0 1 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 Safety Program I NIA
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
NIA SOW Para. 7.0 NA WCAD, Code 51DOOMA, COR
7. DO 250 REQ 9. DIST STATEMENT 10.FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
One/R Block 16 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
A Block 16 SUBMIS~I£N k Draft oc 16 Reg Repro
16. REMARKS COR 1
Block II, 12 & 13: No Later Than 30 Days after acceptance of contract and when changes Wing Safety Officer 1 are proposed. Format: Electronically CD Contractor Provided, Government Approved.
15.TOTAL 0 2 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 Trip/Conference Reports N/A
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
Block 16 SOW Para. 9.1.1 NA WCAD, Code 51DOOMA, COR
7. DO 250REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
ASREQ Block 16 b. COPIES
8. APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
Block 16 SUBMIS~r~ck
Draft Reg Repro
16. REMARKS Team Lead 1 Block 4: Contractor format acceptable. Must address where and when, topics discussed, Branch Head 1 and actions and outcomes. Include this data with project status report.
Blocks 11, 12, and 13: NLT 7 business days after return from travel. 15.TOTAL 0 2 0
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
AOOS Information Assurance (IA) Training Completion Report Info Technology Personnel Security Report
4. AUTHORITY (Data Acquisition Document No.) ,5. CONTRACT REFERENCE 6. REQUIRING OFFICE
NIA SOWPara. 13 NA WCAD, Code 51DOOMA, COR
7. DO 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT
REQUIRED
ANNLY Block 16 b. COPIES 8.APPCODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final
Block 16 SUBMISSI~N Draft
Bock 16 Reg Repro
16. REMARKS COR 1
Blocks 11, 12 & 13: Required when new personnel assigned and require IT access and annually thereafter. Government Format, Electronically.
15.TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
STEINER.EDWARD.FRANCIS.I042816805·'·.~~;,'jf£;:.~~~~~ 09/01115 DlsiWI)'oW.odb)'RICHARPJl'UA!.tll474il8m 9/1/2015 RICHARD.JULIA.M.l247408726 ,\:ru~~~~<ll,ou=PKI,<to"llSN, oa.:201MMl ~~~374\W
DO FORM 1423, AUG 96 PREVIOUS EDITION MAY BE USED. Page __ of __ Pages
Adobe Professional 8. 0
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the coUection of information. Send comments regarding this burden estimate or any other aspect of this collection, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for lnfonnation, Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202·4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed fonn to the Government Issuing Contract Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
X030 A TDP TM OTHER MGMT (Security)
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
5.1.6 Air Vehicle Solicitation N00421-15-R-0029 TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 Operations Security (OPSEC) Plan NA
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C SOW para. 8.3 AIR 5.10
7. DD250 REQUIRED 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD REQUIRED ONE/R See Block 16 S.APPCODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE b. COPIES
A (see 16) See Block 16 See Block 16
16. REMARKS Draft Final
Reg Repro Block A: PBSOW Para. 8.4 PCO 1 1 0
Block 4: Use the definition of sensitive information given in Title a5, US Code Section AIR5.1DCOR 1 1 0 278g-3(d) (4) Public Law 100-235 (101 STAT 1727). Security policy, procedures and DCMA 0 1 0 requirements for classified information (as defined in FAR-4-401). Are provided in DoD Manual 5220-22-M. National Industrial Security Program Operating manual (NISPOM). Use OPNA VINST 3432.1 and National Security Decision Directive 298 of22 January 1988for the concept of Operations Security, and apply the framework for telecommunications security in DFARS clause 252.239-7016. Add "TEMPEST requirements are not considered separately in the DD Form 254 incorporated into the contract".
Block 9: D; Distribution authorized to Department of Defense (DoD) and DoD Contractors only; Date TBD.
In addition, the words, "FOR OFFICIAL USE ONLY" shall be conspicuously marked at the bottom of the outside cover (if any), on the bottom of each page, and on the bottom of the outside back cover (if any). The front cover (if any) or the first page of the document shall also be conspicuously marked with the following statement: "This document contains information EXEMPT FROM MANDATORY PUBLIC DISCLOSURE under the Freedom oflnfonnation Act. Exemption b (2) applies "These markings shall also be applied in an appropriate manner to any data provided in electronic media transmission. EXEMPTIONS: b (2) shall be used on documents which concern internal working processes or procedures (i.e., OPSEC Plans or Program Protection Implementation Plans).
Blocks 11, 12 and 13: Preliminary draft plan due 90 days after receipt of Government security data. Final plan due 45 days after Government approval of draft. Revisions are required after approval of plan during the performance of this contract ONLY to comply with Government Data Protection Policy document revisions.
Block 14: The plan will be FOUO and cannot be posted on a public website. The plane must be submitted in electronic, hard copy or on an Integrated Data Environment to Naval Air Systems Command ATTN: Karen Abell, 47561 Ranch Road, Bldg 4023, Patuxent River, MD 20670. karen.abell@nayy.mil Phone# (301) 342-5499
15. TOTAL 2 3 0
G. PREPARED BY
H.rq7 J J 2.b)5'""'
I. APPROVED BY
J. D9// I :?01 s-E...t, ...t c..e· .-'llll...Q~ J~M~:t~W.JJf~AdJ 7 ·;q.::i ·.~ XO.A A.
DD FORM 1423-1, JUN 90 Previous editions are obsolete Page I of I
File details come from the government source that posted it. Updated .