Cost Substantiation Attachment_5.xls

XLS spreadsheet 23 KB Posted

Attached to
AIRBORNE SYSTEMS TRAINING AND RESEARCH SUPPORT (ASTARS) AIRCRAFT
Solicitation number
N00421-08-R-0056
Issued by

About this file

COST SUBS. ATTACHMENT 6

View the file

Other files

File Type Posted
N00421-09-R-0002-AMEND_03.doc DOC document
N00421-09-R-0002_AMEND_02.doc DOC document
Attachment_4_Cost_summary_DD1921 form.xls XLS spreadsheet
Contract Data Requirements List —
N0042109R0002 Amend_01.doc DOC document
09_Instructor Station.JPG JPG image
06_ Antenna.JPG JPG image
08_Instructor Station —
12_Computers at Instructors Station.JPG JPG image
01_APG-66(V)2 and MX-15 from the right.JPG JPG image
10_Instructor Station Displays and Controls.JPG JPG image
03_APG-66(V)2 and MX-15 close.JPG JPG image
13_Instructors Station interface and cbs.JPG JPG image
05_APG-66(V)2.JPG JPG image
04_MX-15.JPG JPG image
11_Student Station.JPG JPG image
07_Antenna from behind.JPG JPG image
14_Instructors station coomputers and USB.JPG JPG image
02_APG-66(V)2 and MX-15 from the left.JPG JPG image
Questions_and_Answers_N0042109R0002.doc DOC document
CDRL 20081001.doc DOC document
08R0056 COST MATIX.xls XLS spreadsheet
N00421-09-R-0002_ ASTARS.doc DOC document
05-2104 Rev 8 —
Experience Matrix 08R0056.xls XLS spreadsheet
PastPerformanceQuestionnaire 08R0056.doc DOC document
Past Performance Matrix 08R0056.doc DOC document
ASTARS Source Sought Questions and Answers.doc DOC document
GFE08R0056.doc DOC document
ASTARS Industry day brief 20080408.ppt PPT presentation
20080408 industry_day_answer questions.doc DOC document
ASTARS Industry Day 8 Apr 08 Contracts.ppt PPT presentation
PERFSOO08R0056.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA-4

SECTION L COST ATTACHMENT 5
COST SUBSTANTIATION
WBS __Note: Include WBS at the lowest level at which your estimate was developed.____________
1. PROGRAM
LABOR / MATERIALCOST ESTIMATE TY$ANALOGOUS COST TY$
BREAKOUTABCDEFGH
1921-1ContractorContractorContractorSubcontractorSubcontractorSubcontractor1921-1ContractorContractorContractorSubcontractorSubcontractorSubcontractor
CategoryLabor HoursLabor CostMat'l CostLabor HoursLabor CostMat'l CostCategoryLabor HoursLabor CostMat'l CostLabor HoursLabor CostMat'l Cost
Nonrecurring
Recurring
TOTAL
TOTAL COST ESTIMATE (TY$) A+B+C+DTOTAL COST ANALOGOUS EFFORT (TY$) E+F+G+H
DESCRIPTION OF WORK CONTENT / TECHNICAL PARAMETERSDESCRIPTION OF DIFFERENCES IN WORK CONTENT
ESTIMATE BASEBASE COST TY$ADJUSTMENTS / CALCULATIONSADJUSTMENTS COST TY$TOTAL COST ESTIMATE (TY$)
DESCRIPTION OF ESTIMATE BASE / PROCESSDESCRIPTION OF ADJUSTMENTS / CALCULATIONSOTHER (IF NECESSARY)

&CCOST SUBSTANTIATION &RAttachment (5)

File details come from the government source that posted it. Updated .