ASTARS Technical Brief

View the file

Other files

File Type Posted
N00421-09-R-0002-AMEND_03.doc DOC document
Cost Substantiation Attachment_5.xls XLS spreadsheet
N00421-09-R-0002_AMEND_02.doc DOC document
Attachment_4_Cost_summary_DD1921 form.xls XLS spreadsheet
Contract Data Requirements List —
N0042109R0002 Amend_01.doc DOC document
09_Instructor Station.JPG JPG image
06_ Antenna.JPG JPG image
08_Instructor Station —
12_Computers at Instructors Station.JPG JPG image
01_APG-66(V)2 and MX-15 from the right.JPG JPG image
10_Instructor Station Displays and Controls.JPG JPG image
03_APG-66(V)2 and MX-15 close.JPG JPG image
13_Instructors Station interface and cbs.JPG JPG image
05_APG-66(V)2.JPG JPG image
04_MX-15.JPG JPG image
11_Student Station.JPG JPG image
07_Antenna from behind.JPG JPG image
14_Instructors station coomputers and USB.JPG JPG image
02_APG-66(V)2 and MX-15 from the left.JPG JPG image
Questions_and_Answers_N0042109R0002.doc DOC document
CDRL 20081001.doc DOC document
08R0056 COST MATIX.xls XLS spreadsheet
N00421-09-R-0002_ ASTARS.doc DOC document
05-2104 Rev 8 —
Experience Matrix 08R0056.xls XLS spreadsheet
PastPerformanceQuestionnaire 08R0056.doc DOC document
Past Performance Matrix 08R0056.doc DOC document
ASTARS Source Sought Questions and Answers.doc DOC document
GFE08R0056.doc DOC document
20080408 industry_day_answer questions.doc DOC document
ASTARS Industry Day 8 Apr 08 Contracts.ppt PPT presentation
PERFSOO08R0056.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

*/35

Dennis Bostich Airborne Systems Instructor Welcome to the United States Naval Test Pilot School Industry Day

Mission

provides instruction to experienced pilots, flight officers, and engineers in the processes and techniques of aircraft and systems test and evaluation.
from all U.S. military services, other U.S. Government agencies, and foreign nations.

History

Aug 94, Statement of work
Jun 96, final Government Furnished Equipment integration
2004 begin flying second NP-3D
Two of the oldest P-3s in the Navy

U.S. Naval Test Pilot School Airborne Systems Training and Research Support Aircraft

Major Systems

APG-66(V)2 Mid-Life Upgrade (MLU) Radar
MX-15 Infrared/Electro-Optical System
Moving Map Navigation System
Simulated HUD
Mission Computer
Three interface computers
Two Crew Stations
Test Conductor and Evaluator
Integrated Navigation System

Crew seats Physical Layout

MAIN ELECTRICAL

LOAD CENTER

LAVATORY

B.L.

GALLEY

FWD

ELEC

LOAD

CENTER

RACK

A1

RACK

J1

RACK

J2

RACK

H1

RACK

H2

RACK

H3

RACK

RACK

K1 K2

RACK

RACK

G1 G2

TAIL

RADOME

UNOCCUPIED

WT: 59 LBS

UNOCCUPIED

WT: 59 LBS

0.00

DINETTE

FWD

ELEC

RACK

B1, B2

AND B3

RACK

F1

ANTENNA

CONTROL

DATA

DECOMM

DATA

RECORD

DATA

DISPLAY

NTC

TRACK

DISPLAY

MATS

Nose:

APG-66(V)2 radar MX-15 EO/IR system

Cockpit:

HUD camera

GPS

MPD & sticks Evaluator station 4 MPDs Control sticks:

TC Station:

4 MPDs Control sticks Mission computers Video switcher Video recorder

Navigation:

LTN-72 INS

LTN-92 INS

ARN-151 GPS

MPD

System Architecture

Head-Up Display & Map 2 PC Based Windows OS/C++

EO/IR & Map 1 PC Based Windows OS/C++

Mission Computer & Radar PC Based Windows OX/C++

MX-15 EO IR

APG-66(V)2 Radar

Video Switcher

Side Controllers (2)

Evaluator Station

Multi Function Displays (4)

Multi

Function Displays (4)

Side Control lers (2)

Test Conductor Station

ARN-151 GPS

MIL

STD

1553B

ARINC

ARINC

IEEE 802.3 (Ethernet)

Control (RS 232)

Video (Y C Composite)

Operator Input (Analog and discrete)

VCR 1

VCR 3

VCR 2

Hud Camera

LTN-92 INS

MFD

Cockpit

TACCO Display

NAV Display

Evaluator Station

“Student Station”
A-12 Cockpit mock-up
4 displays & 2 hand controllers
Radar, FLIR, Map, HUD and Radio control

Test Conductor Station

“Instructor Station”
4 displays & 2 hand controllers
Mission computers
Triple Deck video recorder (Hi-8mm format)
Radar, FLIR, HUD, Map video w/ ICS and IRIG

APG-66(V)2 Radar

Manufactured by Northrop-Grumman
Four Line Replaceable Units
Transmitter, 21.5 KW traveling wave tube
Antenna – mechanically scanned phased array
Low Power Radio Frequency
Signal Data Processor

Jason says X/I band, but this only says I band. Use of both systesm? Covered in radar classses.

Radar Modes

Air-to-Air
Two Search Modes
Range While Search and Air Combat Maneuvering
Four track modes
Track-While-Scan, Single Target Track , Situational Awareness Mode, and SAM Multi-Target Track
Air-to-Ground
Four search modes with sub-modes
Real Beam Ground Map, Sea Search, Ground Moving Target Indicator and Beacon
One tracking mode, Fixed Target Track

MX-15

Four components
Re-Tractable Gyro-Stabilized Turret
Master Control Unit
Control Panel
Hand Control
Three Image Sensors
High magnification step zoom IR
Low magnification continuous zoom

color TV High magnification fixed field of view color TV

MX-15

Control Panel
Instructor Station

Moving Map

Designed to provide continuously updated pixel map
Provides map coverage from JOG through JNC

Scale (nmi) Map

80JNC (1:2M)
40ONC (1:1M)
20TPC (1:500K)
10, 5TPC (~2x,~ 4x pixel zoom)

Check waypoint library. Biff says 20, Jason says 99.

Instrumentation Navigation Air-to-Air Radar

Head-Up Display

HUD symbology overlaid on video from a cockpit-mounted color camera
Size chosen to simulate modern HUD (approx 20 deg x 30 deg)
Symbology is a composite emulation of several different HUD formats
Various display formats can be selected

Head-Up Display

Workload

Two classes totaling 70 students per year
Three off-site short courses per year
FY06, 360.5 flight hours, 35.4 MMH/FH
FY07, 307.3 flight hours, 19.4 MMH/FH
FY08, 107.3 flight hours, 37.9 MMH/FH

Supports

Integrated Systems Demonstration
Integrated Systems Evaluation
Air-to-Ground Radar Test Techniques
Air-to-Air Radar Test Techniques
Radar Evaluation (A/A and A/G)
FLIR/EO Evaluation
Short Course
Navigation System Evaluation

APG-66 Maintenance

LPRF, rate 1.14/yr since 2001, cost $12,000/yr
Transmitter, rate 0.67/yr since 2005, cost $12,500/yr
Antenna, rate 0.67/yr since 2005, $9,600/yr
SDP, rate 0.33/yr since 2005 (only 1, SDP was A799), cost $2,800/yr
Navy maintenance contract supports Navy Counter Drug Upgrade, Coast Guard, and Customs Service.

MX-15 Maintenance

None to date
Two years on warranty remaining.

Statement of Objectives Three sections of requirements

1.0 Baseline Design Goals

2.0 Program Objectives

3.0 Support

Will USNTPS consider an optimal solution to performance based goals that does not meet all section 2 and 3 requirements? Yes.

1.0 Baseline Design Goals

1.2.1Provide an integrated system of sensors, controls, and displays typical of current and future tactical aircraft.
1.2.2Provide support and instrumentation systems typically employed in developmental test aircraft.
1.2.3Allow complete control of entire sensor suite from either of two operator stations.
1.2.4Allow instructor monitoring of all student actions.
1.2.5Allow continuous ground operation with no overheating

2.1 General Aircraft Requirements

2.1.1Crew
2.1.1.1No more than 2 pilots required.
2.1.1.2No non-pilot flight crew (flight engineer, observer, etc.) required.
2.1.1.3During systems training within local restricted areas, one pilot seat may be occupied by a test pilot student under instruction.
2.1.1.4Seating to accommodate a minimum of 4 students and 2 instructors (including the two operator stations).

2.1 General Aircraft Requirements

2.1.2 Support

2.1.2.1All aircraft modifications, to include installation of any provided GFE, will be accomplished by the contractor.
2.1.2.2Use government provided fuel when supporting USNTPS missions.
2.1.2.3Contractor use other than support to USNTPS curriculum normally restricted to maintenance and ferry flights (no ASTARS system operation). All other flights require specific approval from the Commanding Officer, USNTPS.
2.1.2.4Aircraft sustainable with equipment in the current Navy inventory (no special government ground support equipment required).
2.1.2.5Maintain all GFE in accordance with applicable instructions.
2.1.2.6Aircraft available to USNTPS use 40 weeks per year, non-contiguous.

2.1 General Aircraft Requirements

2.1.3Performance
2.1.3.1Instrument rated aircraft
2.1.3.2Power and cooling budget for all ASTARS sensor systems (including radar) to operate simultaneously during ground and airborne operation.
2.1.3.3Adequate power and cooling to operate all systems and sensors (including the radar) continuously for at least 3 hours on the ground with no overheating and no additional ground support equipment.
2.1.3.4Endurance to operate at normal cruising speed for at least 4 hours, with sufficient Instrument Flight Rules (IFR) reserve.
2.1.3.5Capable of carriage of high-density information system or external advanced range data system pod to support Atlantic Test Range time, space, and position information data.

2.2 Navigation System

2.2.1Include a Global Positioning System aided navigation system.
2.2.2At least two independent navigation systems.
2.2.3Capability to look at time and position information from each system concurrently.
2.2.4Instrumentation to allow for recording raw navigation and sensor data to digital media for student post-flight analysis.

2.3 Operator Stations

2.3.1Two operator stations with all the following items required at each station.
2.3.2Seating for one student to operate all controls and displays, and one seat for an instructor or student observer.
2.3.3Seating with adequate design and restraint to be manned for all phases of flight.
2.3.4Station configuration not required to look like a specific tactical aircraft cockpit though all in-flight operation must be accomplished while seated at the operator station.
2.3.5Cabin configuration to allow for instructor oversight of each of the student stations with no obstructions.
2.3.6At least four multifunctional displays or equivalent functionality.
2.3.7Two hand control units to control all sensor and display functions

2.3 Operator Stations

2.3.8Communications system at each operator station with the following:
2.3.8.1Hot microphone or voice actuated internal communication system (ICS) to the instructor and other students using ASTARS.
2.3.8.2Selectable ICS capability for student and instructor communication to the pilot(s).
2.3.8.3ICS available with power on aircraft.
2.3.8.4UHF/VHF radio transmit and receive capability with selectable channels from the operator stations

2.4 Data Recorders

2.4.1Capable of recording at least three video inputs.
2.4.2Capable of being loaded, unloaded, and accessed during flight.
2.4.3Selection of parameters to be recorded capable of being changed (new or different parameters selected) in flight.
2.4.4Capable of recording ICS and radio communications.
2.4.5Instrumentation to display and record data parameters (e.g., radar, navigation, mission data, etc.).

3.0 Support

3.1Additional Software and Hardware Requirements
3.1.1Software to use an open architecture.
3.1.2Hardware to be reconfigurable to the maximum extent possible.
3.2Configuration Management
3.2.1Update software configurations, hardware configurations, and users’ manuals and provide a copy to the Commanding Officer, USNTPS, within two weeks of any changes

Support

3.3Technical Publications
3.4.1Source code to be provided to the government (as applicable).
3.4.2Provide access to all source code for system integration.
3.4.3Provide an interface design description for all systems.
3.4.4Maintain and provide to USNTPS staff a copy of all software and hardware configurations.
3.4.5Maintain and provide to USNTPS staff a copy of all users’ manuals pertinent to training system operations.

Support

3.4Technical Training
3.4.1Provide initial training to USNTPS instructor staff personnel on system operation.
3.4.2Provide refresher and new instructor staff personnel training on system operation at least yearly, or as major changes are incorporated in the system.

Tentative Schedule

8 April 08Industry Day
1 May 08Sources Sought and Capabilities
Statement Request
1 Jun 08Responses Received
1 Aug 08Request for Proposal release
15 Sep 08RFP Close
31 Dec 08Award
1 Jan 09Commence work

QUESTIONS?