CONTRACT DATA REQUIREMENT LIST (CDRL)

Text of this file

CONTRACT DATA REQUIREMENTS LIST

Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
1
Contractor Flight Experience Summary
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 2.1.1.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Yearly and as
Aircraft Delivery
required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

Anniversary of contract award

Draft
Reg
Repro

16. REMARKS

Submit yearly and upon addition of pilots.
USNTPS
1
1
1
Format, reference USNTPSINST 3710.2H, Enclosure 3
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Visiting Aircraft and Accompanying Aircrew and Maintenance

2
Crew Pre-Arrival Information Form
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraphs 2.1.1.2 and 2.1.3.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
Yearly and as
Aircraft Delivery
required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

Anniversary of contract award

Draft
Reg
Repro

16. REMARKS

Submit yearly and upon addition of aircrew and maintenance personnel.
USNTPS
1
1
1
Format, reference USNTPSINST 3710.2H, Enclosure 2
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Baseline configuration of ASTARS installed hardware

3.1

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

DD Form 1423, Aug 96 Previous edition my be used Page 1 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to configuration of ASTARS installed hardware

3.2

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Baseline configuration of ASTARS installed software

4.1

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to configuration of ASTARS installed software

4.2

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 2 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Baseline user’s manual of ASTARS installed Electro--

5.1
Optic/Infrared Sensor
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to user’s manual of ASTARS installed Electro-

5.2
Optic/Infrared Sensor
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Baseline user’s manual of ASTARS installed Radar

6.1
Sensor
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 3 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to user’s manual of ASTARS installed Radar

6.2
Sensor
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.2.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Baseline user’s manual of ASTARS installed data recorders

7.1

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 2.6
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to user’s manual of ASTARS installed data recorders

7.2

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 2.6
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 4 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
p
3. SUBTITLE

Baseline power and cooling budget for operation of all

8.1
ASTARS sensor systems on the ground and airborne.
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 2.1.3.2
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Updates to power and cooling budget (ground and airborne)

8.2

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 2.1.3.2
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Provide baseline of source code in electronic format

9.1

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.3.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 5 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
p
3. SUBTITLE

Provide update of source code in electronic format

9.2

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.3.1
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Provide interface design description for electro-optical sensor

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.3.3
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Provide interface design description for radar sensor

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.3.3
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 6 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
p
3. SUBTITLE

Provide interface design description for data recorder

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.3.3
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Provide initial classroom and flight training to USNTPS

13.1
Instructor personnel on system operation
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.4
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
one time
Aircraft Delivery

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Provide refresher and new personnel classroom and flight

13.2
training on systems operation
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.4
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
yearly
Anniversary of contract award

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

Anniversary of contract award

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 7 of 8 Pages 1161/183

CONTRACT DATA REQUIREMENTS LIST
Form Approved

OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
p
3. SUBTITLE

Provide classroom and flight training to USNTPS Instructor

13.3
personnel on systems operation after major changes are
incorporated in the system
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
SOO paragraph 4.4
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
As required
As required

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

As required

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

Progress report on schedule based on the RFP submitted

14
schedule
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
RFP
USNTPS
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
One time
45 days after contract award

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

None

Draft
Reg
Repro

16. REMARKS

USNTPS
1
1
1
.
15. TOTAL
(
1
1
1
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 250 REQ
9. DIST STATEMENT

REQUIRED

10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
a. ADDRESSEE

Final

Draft
Reg
Repro

16. REMARKS

1
1
1
15. TOTAL
(
1
1
1
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
Dennis Bostich, 301-757-5032
29 Oct 2008

Previous edition my be used Page 8 of 8 Pages 1161/183

Other files

File Type Posted
N00421-09-R-0002-AMEND_03.doc DOC document
Cost Substantiation Attachment_5.xls XLS spreadsheet
N00421-09-R-0002_AMEND_02.doc DOC document
Attachment_4_Cost_summary_DD1921 form.xls XLS spreadsheet
N0042109R0002 Amend_01.doc DOC document
09_Instructor Station.JPG JPG image
06_ Antenna.JPG JPG image
08_Instructor Station —
12_Computers at Instructors Station.JPG JPG image
01_APG-66(V)2 and MX-15 from the right.JPG JPG image
10_Instructor Station Displays and Controls.JPG JPG image
03_APG-66(V)2 and MX-15 close.JPG JPG image
13_Instructors Station interface and cbs.JPG JPG image
05_APG-66(V)2.JPG JPG image
04_MX-15.JPG JPG image
11_Student Station.JPG JPG image
07_Antenna from behind.JPG JPG image
14_Instructors station coomputers and USB.JPG JPG image
02_APG-66(V)2 and MX-15 from the left.JPG JPG image
Questions_and_Answers_N0042109R0002.doc DOC document
CDRL 20081001.doc DOC document
08R0056 COST MATIX.xls XLS spreadsheet
N00421-09-R-0002_ ASTARS.doc DOC document
05-2104 Rev 8 —
Experience Matrix 08R0056.xls XLS spreadsheet
PastPerformanceQuestionnaire 08R0056.doc DOC document
Past Performance Matrix 08R0056.doc DOC document
ASTARS Source Sought Questions and Answers.doc DOC document
GFE08R0056.doc DOC document
ASTARS Industry day brief 20080408.ppt PPT presentation
20080408 industry_day_answer questions.doc DOC document
ASTARS Industry Day 8 Apr 08 Contracts.ppt PPT presentation
PERFSOO08R0056.doc DOC document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .