For Building 206, the government confirmed that existing VCT flooring beneath lab cabinets does not require asbestos abatement unless disturbed during removal and reinstallation, which must comply with applicable asbestos regulations. The epoxy floor coating specification requires integrated seamless cove base (minimum 4-inch) around all cabinets with Otto fuel rating, with floor preparation per manufacturer specifications. The government confirmed that elevated backsplash on north and south work surfaces will be removed and fabricated for a continuous work surface. For Building 233, the government confirmed 18" x 18" LVT tile (not 12" x 24") with minimum 20 MIL PVC wear layer and 3mm thickness, exhaust fans with minimum 100 CFM and whisper quiet technology, stain grade solid plywood cabinets with soft-closing hinges and drawer slides, and 4-inch stainless steel pull handles. The government clarified that ADA door openers are not required, standard thickness solid surface countertops are acceptable with sink not requiring undermount installation, 16-gauge stainless steel undermount sinks with sound shields are not required, and upper and lower cabinet configuration should match existing conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0025326Q0011_Amendment0001.pdf | ||
| C7_Att12_206_233_SOW_Rev1.pdf | ||
| C7_PPI_Answers_Amendment0001.docx | DOCX document | |
| C7_Att12_Bldg206_and_Bldg233_SOW.pdf | ||
| C7_Att11_OSHA_Calculating_Injury_and_Illness_Incident_Rate.pdf | ||
| C7_Att07_Past_Performance_References.docx | DOCX document | |
| C7_Att09_PPI_Form.docx | DOCX document | |
| C7_Att08_Bid_Form.xlsx | XLSX spreadsheet | |
| Solicitation - N0025326Q0011.pdf | ||
| C7_Att05_OPSEC_Guide.pdf | ||
| C7_Att10_Safety_Data_Sheet.docx | DOCX document | |
| C7_Att02_Wage_Determination.pdf | ||
| C7_Att01_Equipment_In_Place.xlsx | XLSX spreadsheet | |
| C7_Att03_Safety_Requirements_for_Contractors.pdf | ||
| C7_Att04_Contractors_Guide_to_Env_Compliance.pdf | ||
| C7_Att06_Schedule_of_Values.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building 206 Lab Upgrade and Building 233 Breakroom Renovation
Building 206 Lab
1. QUESTION: Confirm the old VCT will require abatement that was left behind under and between the lab Cabinets
ANSWER: If cabinets need to be removed for means and methods old VCT is not required to be abated but any disturbance while removing and re-installing cabinets should follow all Asbestos regulations.
2. QUESTION: Confirm new integrated seamless cove up all cabinets min of 4” with Otto fuel rated Epoxy floor coating
ANSWER: Confirmed as specified in SOW VIII section 11.
3. QUESTION: Confirm drawdowns of 5 different application of the epoxy coating will be required for non-slip and cleaning factors for the perfect texture required.
ANSWER: Existing floor should be prepped in accordance with manufactures’ specification as stated in the SOW.
4. QUESTION: Confirm on the North and south work surfaces the elevated back splash on top be removed and fabricated for a continuous work surface.
ANSWER: Confirmed. See revised SOW.
Building 233 Restrooms & Breakroom
5. QUESTION: Confirm exhaust fans to be min 100CFM with Whisper quiet technology
ANSWER: Confirmed. See revised SOW.
6. QUESTION: Confirm 18”x18” or 12”x24” LVT.
ANSWER: 18”x18” See revised SOW
7. QUESTION: Confirm LVT min wear layer 20 MIL PVC wear layer & 3mm thickness
ANSWER: Confirmed. See revised SOW
8. QUESTION: Confirm ADA door openers are required
ANSWER: ADA opener not required.
9. QUESTION: Confirm 3CM countertop in kitchen with undermount sink
ANSWER: Standard thickness for solid surface is acceptable. Undermount not required.
10. QUESTION: Please confirm solid plywood cabinets stain grade or painted cabinets
ANSWER: Stain Grade. See revised SOW
11. QUESTION: Please confirm soft-closing hinges and drawer slides.
ANSWER: Confirmed. See revised SOW.
12. QUESTION: Please confirm the 4inch stainless steel pull handles for the new Cabinet
ANSWER: Confirmed. See revised SOW.
13. QUESTION: Please confirm 16 Gauge Stainless steel undermount sink with Full Undercoat Sound Shield with Bottom & Side Pads full size for each.
ANSWER: Undermount sink and sound shield not required.
14. QUESTION: How many Overhead Cabinets are desired?
ANSWER: See VII.13.b. Configuration of upper and lower cabinets to match existing configuration.